Our Design Process

Our Architectural Design Process

At Piper Cole Architects, we guide every project through a proven, collaborative process. With 800+ completed projects across the Seattle metro area, we deliver beautiful, functional results.

Step 1: Initial Consultation

We begin with a conversation about your goals, site, timeline, and budget. This no-pressure meeting gives you clarity on direction and next steps.

Step 2: Schematic Design

We develop drawings that translate your vision into architectural concepts, exploring options and refining direction based on your feedback.

Step 3: Design Development

We evolve the approved schematic into a detailed design. Materials, finishes, and structural systems are integrated so you have a clear picture of the finished project.

Step 4: Construction Documents

We produce the complete set of drawings and specifications required for permitting and construction. Comprehensive, coordinated, and precise.

Step 5: Permitting

We manage the permitting process with local authorities in Kirkland, Seattle, Bellevue, and surrounding jurisdictions. Our familiarity with local codes keeps projects moving.

Step 6: Construction Administration

We remain engaged during construction, visiting the site, reviewing submittals, and ensuring the built work matches the design intent.

Ready to Begin?

Contact us today to schedule your free initial consultation.

Free Architecture Consultation — Kirkland, WA

Get Free Consultation 425 753 6452