David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
  1. Home
  2. Locations
  3. Architect in Sammamish, WA

Sammamish, the Plateau and Lake Sammamish

Architect in Sammamish, WA

Custom homes on the Plateau, Lake Sammamish waterfront, additions and remodels of the 1990s and 2000s houses that most Sammamish families live in. HOA review designed for up front.

The first feasibility check is free.

Free feasibility check

Send the address and what you have in mind. David replies to you personally.

    What are you planning?
    Your details

    No obligation. Your details go to David only. See the privacy policy.

    • 1996Licensed architect since 1996
    • 1992AIA member since 1992
    • 20 to 30Projects designed each year
    • 3Masonry Excellence Awards, commercial projects
    • AIAAIA · NCARB · Washington licensed

    Why local matters

    Two different Sammamish problems

    Most of the Plateau was built as production housing in the 1990s and 2000s. Those houses now need space, open floor plans and updated systems, and the families in them want to stay for the schools and the neighborhoods.

    The western edge fronts Lake Sammamish, where the city’s shoreline rules add a 50 foot setback from the ordinary high water mark on top of the building permit.

    Many neighborhoods also have HOAs with architectural review, which is far cheaper to design for at the start than to argue with at the end.

    What gets designed here

    Work in Sammamish

    Sammamish work falls into four groups.

    • Custom homes. On infill lots, larger parcels and redevelopment sites, designed to stand apart from the production context around them.
    • Additions. Primary suites, family room expansions and basement work for families who have outgrown the original house.
    • Remodels. Opening kitchens and living areas, primary bath renovation, exterior refreshes and mechanical upgrades on 1990s and 2000s houses.
    • ADUs. Sammamish allows up to two ADUs on a lot with a detached house, and a detached ADU can be up to 1,000 square feet.

    On the water

    Lake Sammamish waterfront

    Lake Sammamish frontage falls under the Shoreline Management Act. An owner’s own house is usually exempt from the shoreline substantial development permit but needs a written shoreline exemption and must meet every shoreline rule; some work needs a full permit, a conditional use permit or a variance.

    Plan the shoreline exemption, or any shoreline permit, into the schedule from day one.

    Permits

    Sammamish permit timelines

    Sammamish permits go through the City of Sammamish Community Development Department, and every application is filed online at MyBuildingPermit.com. The zoning rules, including setbacks that grow with house size, are set out in the Sammamish zoning and permit guide.

    ProjectTypical review
    Standard residential, first roundNot published by city
    Residential addition, including correctionsNot published by city
    New single family home6 to 10 months (Seattle benchmark)
    Lake Sammamish waterfrontShoreline review, 50 ft setback

    The city does not publish review times for houses; as of September 2026 its Building page warns staff transitions may temporarily reduce service levels.

    Site constraints

    HOA and design review

    Many Sammamish neighborhoods carry HOA architectural review.

    • Design to the HOA standard up front, which avoids review delays.
    • Check the HOA covenants before the massing is fixed, not after.
    • Treat HOA approval as its own step in the schedule, separate from the city.

    Budget

    What projects cost, in round numbers

    These are the planning ranges used across this site. The estimators on the linked pages turn them into a number for your size and scope.

    ProjectTypical rangeEstimator
    Architect led custom home$400 to $900 per sq ft (planning range)cost to build page
    High end custom or waterfrontTop of the $400 to $900 per sq ft rangecost to build page
    Whole house remodel$300 to $550 per sq ftwhole house remodel page
    Home addition$350 to $650 per sq fthome addition cost page
    Detached ADU$200,000 to $400,000ADU cost guide
    Architecture feeFixed fee, most $10,000 to $200,000architect fees page

    Swipe the table sideways to see every column

    Eastside figures from the cost pages on this site, each of which has an estimator that gives you your own number. Land, site work and permits sit on top of construction.

    Questions

    Building in Sammamish, answered

    Not answered here? Call David.

    Do you work in Sammamish?

    Yes. Piper Cole Architects is based in Kirkland and designs custom homes, additions and remodels in Sammamish.

    How long does a permit take in Sammamish?

    The city does not publish review times for houses. For planning I use Seattle’s permit times as a benchmark, 6 to 10 months for a new house and about 2 to 3 months for a remodel, longer with critical areas or lake frontage. On Lake Sammamish waterfront, add shoreline review: an owner’s own house usually needs a written shoreline exemption rather than a full permit, and must meet every shoreline rule.

    What does an architect cost in Sammamish?

    I quote a fixed fee for design and permit, set by the project budget and location; most fall between $10,000 and $200,000 depending on scope. The architect fees page has a calculator for your own budget.

    Do I need an architect for a house in Washington?

    Not by law. RCW 18.08.410 exempts single family homes and buildings of four units or fewer from the stamp requirement. You will need permitted drawings and usually structural engineering. People hire an architect because the lot, the code or the design is complicated, not because the law requires one.

    What happens on the first call?

    You describe the property and what you want to do. David replies to you personally. The first feasibility check is free and usually takes about a day.

    Does my HOA need to approve the design?

    In many Sammamish neighborhoods, yes. Designing to the HOA standard from the start is what keeps that review from becoming a delay.

    Plan the project

    Cost and service pages

    Nearby

    Nearby cities

    Our Architecture Services

    Full-service architecture for Sammamish Architect: Custom Homes, Additions, Waterfront and the greater Seattle area:

    Get a free feasibility check →

    David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA

    Next step

    Talk about your Sammamish property

    Describe the lot and what you want to do with it. You speak to David Meade directly, and the first feasibility check is free and usually takes about a day.

    Free feasibility check

    Send the address and what you have in mind. David replies to you personally.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp