Custom Home Architect in Sammamish, WA: Fixed Fee

By David Meade, AIA, NCARBOctober 21, 202616 min read

On this page

    Home / Resources / Sammamish custom homes

    Sammamish custom homes

    Custom home architect in Sammamish, WA

    What Sammamish’s code lets a new house be, what a teardown loses, what the Lake Sammamish shoreline program adds, and what the city does and does not say about review time.

    By David Meade, Principal ArchitectUpdated 20 October 202611 min read

    Key takeaways

    • Sammamish caps a new house at 50 percent floor area ratio and hardscape at 30 percent in R-1, 40 in R-4 and 50 in R-6. Height is 35 feet. Whether the garage counts toward floor area is a question I put to the city.
    • On Lake Sammamish the city’s shoreline program sets a 50 foot setback from the water, reducible in steps to 20 feet, plus a 15 foot planting strip, mostly native.
    • Since June 14, 2025 the code says demolition ends a house’s nonconforming status, so I design a teardown to today’s rules and ask the city about a lake house.
    • The city publishes no review time for a new house, so I will not quote one.
    • My fee is fixed, about $10,000 to $200,000, set by budget and location. I offer a free feasibility check in about a day.

    Short answer: Piper Cole Architects is based in Kirkland, and I design new custom homes in Sammamish for a fixed fee, about $10,000 to $200,000 depending on budget and location. I offer a free feasibility check in about a day. Before you pay for drawings, an architect should tell you what the code lets a new house be on your lot, what a teardown loses, and what the lake or a slope adds.

    This page is for an owner planning a new house in Sammamish, usually a teardown and rebuild, on a large lot or on the lake, with a budget of roughly $2,000,000 to $6,000,000. Piper Cole designs and administers construction on your behalf and does not build. The rules come from the City of Sammamish’s code, pages and forms and from state law, read on 20 October 2026; I mark City, County, district and State. Confirm with the city. For an existing house, see my Sammamish remodel page.

    What Sammamish’s code lets a new house be

    This is City code, Title 21 of the Sammamish Municipal Code (SMC). My zoning guide has the zone-by-zone tables.

    RuleWhat the city saysEffect on a new house
    Floor area50 percent of the lot in R-1 to R-8. The 2024 print counted the garage and the table exempts only detached garages off an alley; the city’s current FAR page does not say, so I ask. Steep slopes, wetlands, streams, their buffers and submerged land are not credited to the lot area (SMC 21.04.030.H).The lot you divide by can be smaller than the deed says.
    Upper floors3,000 sq ft maximum for upper level floors, per building, plus a one-time 300 sq ft (Ordinance O2026-594, effective 14 February 2026).I ask whether that is each floor or all together.
    Height35 feet, side walls 24. On a slope of 6 feet or more the house is cut into segments at least 15 feet long, each from its own average grade (O2025-583).A sloped lot can pass at one end and fail at the other.
    SetbacksR-4, house over 4,000 sq ft: front 25, sides 12 average and 10 minimum, rear 25 and 20. R-1: 20, 25 and 30.House size sets the tier in R-4 and R-6.
    HardscapeR-1 30 percent, R-4 40, R-6 50. Drives, patios, gravel and overhangs over 18 inches count.The drive draws on the same allowance as the house.
    TreesR-1 keeps 50 percent of significant trees outside critical areas; R-4 and R-6 keep 35 (SMC 21.03.060.G, 2022 print).An arborist comes first.

    Worked lot A, upland. One acre, 43,560 sq ft, R-1. Floor area cap 21,780 sq ft (43,560 x 0.50). Hardscape cap 13,068 (43,560 x 0.30). At $400 to $900 per sq ft, $2,000,000 buys 2,222 to 5,000 sq ft and $6,000,000 buys 6,667 to 15,000, so the budget reaches its limit before the floor area cap does; hardscape, setbacks, trees and the upper floor cap shape the plan. With 60 significant trees outside critical areas (my assumption), R-1 keeps 30 (60 x 0.50).

    A teardown: what happens to the old house

    Since June 14, 2025 SMC 21.09.130.C says nonconformance status is forfeited, “which includes demolition of the structure.” I read that to mean a new house meets today’s setbacks, height and hardscape even if the old one sat inside a line, so I compare the new envelope with the old footprint first. Sometimes the answer is to keep the house; see my teardown guide. A lake house has a second text, below.

    Demolition is its own city permit. The form asks for a demolition plan (clearing limits, tree protection, septic, fuel tanks, wells), historic resources and critical areas affidavits, and asbestos and lead reports for a house built in 1977 or earlier. Septic removal is reported to King County Public Health and fuel tank removal to the State Department of Ecology.

    Under SMC 21.06.045.D.1.j, the impact fee section in effect since 1 July 2026, a replacement house pays no impact fee on the floor area it replaces if a complete building permit is submitted within 12 months of the demolition permit; added floor area is charged. So I time the demolition permit to the drawings.

    Planning a teardown and rebuild in Sammamish?

    If the lot touches Lake Sammamish

    This is City code too: the Shoreline Master Program, SMC Title 25, approved by the State. It reaches 200 feet landward of the ordinary high water mark (OHWM). The city puts the local OHWM at 28.0 to 28.2 feet (NGVD29) and says a professional may need to set it. Ecology gave final approval to the latest amendment on 7 May 2026, and the city’s summary describes it as updating a reference to the critical areas rules, so the numbers below are the program text in that package.

    RuleWhat the program says
    Shoreline setback50 feet landward from the OHWM; Pine and Beaver Lakes 45. Houses go landward of it (25.06.020(9)).
    Planting stripThe first 15 feet is a planting area, at least 75 percent native: one tree per 500 sq ft, one shrub per 25. Up to 25 percent may be an active use area (25.06.020(10)).
    ReductionsCumulative, never below 20 feet: 15 feet for planting the strip plus 250 sq ft, 15 for removing a bulkhead (or 10 for an inclined fill), then 5 feet each for five more measures (Table 25.06.020).
    Yards and height45 percent of the lot is yard (not structured or hardened). Side yards total 15 percent of lot width, 5 feet minimum. Height is 35 feet from the average ground elevation at the wall midpoints (Table 25.07.010-2; average grade level is defined in SMC 25.02).

    Source: Title 25 in Ecology’s amendment package (fortress.wa.gov, SammamishLIA2025) and the city’s shoreline page. Where the program and zoning differ, the stricter applies (SMC 25.01.060(4)).

    Worked lot B, on the lake. 15,000 sq ft above the water line, 100 feet wide and 150 deep, R-4 (assumed), a house over 4,000 sq ft. Depth: 150 to 25 front yard, 50 shoreline setback = 75 feet. Width at 12 foot average side yards: 100 to 24 = 76; the program’s side rule allows 15 feet in total, so zoning governs. The box is 75 x 76 = 5,700 sq ft. With Reduction 1 (a 35 foot setback) it is 90 x 76 = 6,840, and at the 20 foot floor 105 x 76 = 7,980. Then the caps bite: floor area 7,500 (15,000 x 0.50) and hardscape 6,000 (15,000 x 0.40), tighter than the program’s yard rule, which allows 8,250 (15,000 x 0.55). The strip is 1,500 sq ft (100 x 15). At $400 to $900 per sq ft, 7,500 sq ft is $3,000,000 to $6,750,000. Setback reductions buy site area that the hardscape cap then spends.

    A house already on the lake. SMC 25.08.100 allows reconstruction or replacement that does not increase noncompliance, and replacement elsewhere if the city finds less impact on the shoreline. The zoning code says demolition ends nonconforming status. I get the city’s reading of a lake teardown in writing before I design it.

    Permits. A house for your own use up to 35 feet above average grade is exempt from the state shoreline substantial development permit (WAC 173-27-040(2)(g)), but the program still applies, the owner carries the burden of proof, and if any part does not qualify the whole needs a permit (SMC 25.08.030). A design outside the program’s dimensions needs a state-issued shoreline variance (25.08.010(3)). See my shoreline exemption guide. A dock is separate: one per lot, up to 480 sq ft overwater for a one-lot dock (25.07.050(2)).

    Tall window wall and French doors opening to a deck with a cable rail
    Huang Residence, Piper Cole Architects. A tall window wall and French doors open to a deck with a cable rail.

    Slopes, streams, trees and drainage

    Landslide areas (City). They include slopes of 40 percent or steeper with 10 feet or more of relief (SMC 21.04.040.B). Work in or within 50 feet of one needs a 50 foot buffer from the top and toe, which the city may reduce or remove on a critical areas report with a geotechnical report (SMC 21.03.020, Ordinance O2024-571, effective 1 January 2025). Buildings sit 15 feet back from a buffer edge. Slopes draining to Lake Sammamish may sit in the erosion hazard near sensitive water bodies overlay, whose no-disturbance area, in the 2022 text I read, allows single-family houses on pre-existing separate lots and little else.

    Streams (City). Buffers are 150 feet for Type S and F, 75 for Np and 50 for Ns, and where the buffer is not vegetated to the code’s standard it must be densely planted or widened 33 percent (SMC 21.03.020.W.4). Wetland buffers depend on category, so a biologist’s report sets them.

    Trees (City). Significant trees are conifers of 8 inches and deciduous trees of 12 inches at breast height (city tree page). A new house in R-1, R-4 or R-6 needs land use approval before any comes down, and no tree comes out before the construction permit issues. Retention is in the table above, and is 50 percent in erosion hazard areas. Each tree removed is replaced by one new tree, mostly native (SMC 21.03.060.J). The 2026 fee schedule lists unlawful removal at $1,500 per inch.

    Drainage (City, on a County manual). Sammamish adopted an addendum to the 2021 King County Surface Water Design Manual: 2,000 sq ft or more of new or replaced impervious surface, or 7,000 sq ft of land disturbance, needs at least simplified drainage review. A new house clears that.

    How the city reviews a new house, and who else decides

    A new house is a building permit through MyBuildingPermit.com. The city’s checklist requires a critical area affidavit, a plan set with an area table, structural calculations, a drainage checklist and analysis, a site protection plan, a traffic concurrency certificate and water and sewer availability certificates. An arborist report, critical area study, geotechnical report and SEPA checklist may be required. The city answers Project Guidance requests within one week.

    How long. The city publishes no review time for a new house. Its building page warns that staff transition may reduce service levels, and its 2025 report to the State Department of Commerce has no single-family row. For planning I use permitting at 3 to 6 months for a custom home, a planning range and not a city figure; a slope, critical area or the shoreline can add to it.

    WhoWhat it decides here
    City of SammamishZoning, trees, critical areas, the shoreline program, building and demolition permits, drainage review.
    King CountySeptic removal and approval (Public Health) and the base Surface Water Design Manual, which the city amends.
    Water and sewer districtsAvailability certificates: Sammamish Plateau Water or the Northeast Sammamish Water and Sewer District.
    State of WashingtonApproves the shoreline program, reviews shoreline variances, receives fuel tank reports.

    What it costs and what changes the schedule

    ItemPlanning figureWhat moves it
    Design and permit feeFixed fee, about $10,000 to $200,000Project budget and location.
    New custom home construction$400 to $900 per sq ftSite, structure, finish level, slope, water.
    A 2,500 sq ft custom home$1.2M to $2.5M all inThe same, plus site work.
    DemolitionTypically $20,000 to $50,000House size, testing, access, trees.
    Design to permit submissionTypically 2 to 4 monthsSurvey, shoreline and slope work, your decisions.

    Planning ranges, not quotes. Per square foot is construction only.

    The free feasibility check in about a day comes first; the in-depth analysis is $1,500 over 2 to 3 weeks. Surveyor, engineers, arborist and any biologist are separate. From the city’s 2026 fee schedule, before the 15 percent technology fee on each line: demolition permit $261 plus a $513 site bond; tree removal $139; shoreline exemption letter $810; shoreline substantial development, conditional use or variance $8,330 base fee. The building permit is valuation based, and the zoning guide works the impact fees.

    You can hire an architect and a builder separately, with the architect administering construction for you, or one company can design and build. I work in the first. Either way, get a written schedule from each builder. See my custom home timeline.

    What to ask any architect before you sign

    1. Which setback tier and hardscape cap will my house land in, and where does the code say so?
    2. How do you count the garage and the upper floors?
    3. Does my lot touch the shoreline program, a landslide area, a stream or the erosion overlay?
    4. On the lake, where is the OHWM, and which setback reductions will you use?
    5. What did the city say in writing about my old house?
    6. Is the fee fixed or a percentage of construction cost, and what does it cover?
    7. What schedule are you planning on, and what is it based on?
    8. Do you administer construction, and do you build? I administer for you and do not build.

    How the work runs, in order

    StepTypical timeWhat you get
    Feasibility check, freeAbout a dayWhether the house fits the lot, code and budget at a basic level.
    In-depth analysis, if you want it$1,500, 2 to 3 weeksA deeper look at zoning, shoreline, slope and budget.
    Design to permit submissionTypically 2 to 4 monthsDrawings, engineering and the permit set.
    City reviewThe city publishes no timeComments and a permit; I report turnaround when I submit.
    Demolition and constructionSet by scope and builderBids, your contract with the builder, my administration.

    I have worked as an architect since 1996, I am an AIA member since 1992 and an NCARB member since 1996, and I take on 20 to 30 projects a year. The Carr residence was featured in Above The Lake and Lux magazines. See my Lake Washington waterfront page.

    Before you buy or design

    Find out what your Sammamish lot will carry

    Send me the address and the year the house was built. I offer a free feasibility check in about a day.

    Questions

    How much does a custom home architect cost in Sammamish?
    I quote a fixed fee for design and permit, set by the project budget and location, typically about $10,000 to $200,000 depending on scope. I offer a free feasibility check in about a day. An in-depth analysis is $1,500 and takes 2 to 3 weeks. City fees and consultants such as a surveyor, engineers and an arborist are separate. Ask any firm whether its fee is fixed or a percentage of construction cost, and what sits inside it.
    Do I need an architect to build a custom home in Sammamish?
    Not by state law. RCW 18.08.410 exempts design work for a residential building of up to four dwelling units from the architect licensing requirement. The city does require a full submittal: its new house checklist asks for a plan set, structural calculations, a drainage analysis, a site protection plan and utility certificates. An architect prepares the plans, coordinates the engineers and surveyor, and answers the city’s comments.
    How big a house can I build on my Sammamish lot?
    Floor area is capped at 50 percent of the lot in R-1 to R-8, so 7,500 square feet on a 15,000 square foot lot and 21,780 on an acre. Steep slopes, wetlands, streams and their buffers are not credited toward floor area in the 2024 print. Whether the garage counts is a question I put to the city, since the 2024 print counted it and the city’s current FAR page is silent. Height is 35 feet, and hardscape is capped at 30 percent in R-1, 40 in R-4 and 50 in R-6. Upper level floors are capped at 3,000 square feet per building under Ordinance O2026-594, and I ask the city whether that is per floor or in total. Setbacks, hardscape or trees usually limit a house before the floor area cap does. Source: SMC 21.04.030, as of October 2026.
    How far from the water must a new house be on Lake Sammamish?
    The city’s shoreline program sets a 50 foot setback from the ordinary high water mark, which the city places at 28.0 to 28.2 feet (NGVD29). The setback can be reduced in steps for planting, bulkhead removal and similar measures, but never below 20 feet. The first 15 feet next to the water is a planting strip, at least 75 percent native. Pine Lake and Beaver Lake use 45 feet. Source: SMC 25.06.020 and the city’s shoreline page; confirm the line on your lot with the city.
    Can I tear down my Sammamish house and rebuild on the same footprint?
    Only where that footprint meets today’s rules. Since June 14, 2025 SMC 21.09.130.C says nonconformance status is forfeited on demolition of the structure and shall not be re-established, so I plan the new house to today’s setbacks, height and hardscape. A lake house also falls under SMC 25.08.100, which allows replacement that does not increase noncompliance. Where the codes differ the stricter applies, so ask the city for its reading in writing before you design.
    How long does Sammamish take to permit a new house?
    The city publishes no review time for a new house. Its building page warns that staff transition may reduce service levels, and its 2025 report to the State Department of Commerce has no single-family building permit row. Project Guidance requests are answered within one week. For planning I use 3 to 6 months for permitting a custom home, which is a planning range and not a city figure. A slope, critical area or the shoreline can add to it.
    What do I have to do about trees when I build in Sammamish?
    A new house in R-1 keeps 50 percent of its significant trees outside critical areas, and R-4 or R-6 keeps 35, rising to 50 percent in erosion hazard areas and the Pine Lake and Beaver Lake sub-basins. No significant tree comes out before a permit. Each one removed is replaced by one new tree, mostly native. The 2026 fee schedule lists unlawful removal at $1,500 per inch of diameter. Source: SMC 21.03.060 and the city’s tree page; I found no later amendment to the percentages.
    Does Piper Cole build the house?
    No. Piper Cole designs the house and administers construction on your behalf, and it does not build. You contract with the builder, and I work for you during construction.
    David Meade, AIA, NCARB
    Principal Architect, Piper Cole Architects · Kirkland, WA

    David Meade is a licensed architect (AIA, NCARB) who has worked as an architect since 1996, with three Masonry Excellence Awards for commercial projects. Learn more about David →

    Talk to the architect

    Have a project in mind?

    Call David Meade directly. Licensed architect serving Kirkland, Bellevue, Seattle and the wider Eastside. David Meade has been an architect since 1996.

    Free feasibility check

    Send the address and what you have in mind. David replies within one business day with what the site and the code are likely to allow.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp