David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
  1. Home
  2. Services
  3. Houses shaped by the water they sit on.

Waterfront Homes

Houses shaped by the water they sit on.

Lakefront and waterfront homes on Lake Washington and Lake Sammamish. The heart of the practice, principal-led by David Meade.

The first feasibility check is free and usually takes about a day.

Free feasibility check

Send the address and what you have in mind. David replies to you personally.

    What are you planning?
    Your details

    No obligation. Your details go to David only. See the privacy policy.

    • 1996Licensed architect since 1996
    • 1992AIA member since 1992
    • 20 to 30Projects designed each year
    • 3Masonry Excellence Awards, commercial projects
    • AIAAIA · NCARB · Washington licensed

    Our signature

    Waterfront is a different project.

    On a normal lot, zoning sets your envelope. On a shoreline lot you have zoning plus the Shoreline Management Act, a local Shoreline Master Program, critical areas rules, often tree retention, and sometimes a geotechnical requirement.

    Each one subtracts from buildable area before a single line is drawn. Knowing that map is most of the job.

    David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
    David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA

    Buildable area

    Check the lot before you buy it

    The single most valuable hour on a waterfront project is the one spent mapping what the shoreline and critical areas rules actually allow, before an offer is made.

    Shoreline setback is measured from the ordinary high water mark, not the property line, which is why buildable area is often far smaller than buyers expect.

    • Shoreline jurisdiction on Lake Washington and Lake Sammamish
    • Vegetation conservation areas that limit clearing
    • Steep slope and critical areas buffers
    • View corridor and privacy constraints from both neighbours

    What it costs

    Waterfront custom home cost, 2026

    Well built Eastside custom home$300 to $500 per sq ft
    High finish, structural glass, difficult site$400 to $900 per sq ft
    Medina, Clyde Hill and prime waterfrontRegularly above $800 per sq ft
    Typical new home we design, to build$2M to $6M
    Architect design fee, custom home10 to 15% of construction
    Design through permit, waterfront12 to 20 months

    Market ranges for planning, not a quote. Shoreline permitting, geotechnical and shoring, moisture detailing and glazing push waterfront to the top of the range.

    Before you buy

    Send us the address.

    A short conversation on a specific parcel can save you from a lot that will never build the house you want. Free, no obligation, straight to David.

    Peck Residence rendering: modern two-story waterfront home with balcony and boat at dusk

    Kirkland shoreline

    KZC Chapter 83, in practice

    In Kirkland, shoreline jurisdiction on Lake Washington, Forbes Creek and North Creek is governed by the Shoreline Master Program under KZC Chapter 83.

    Development inside that jurisdiction triggers a separate substantial development or exemption review on top of the building permit, which is why waterfront timelines run longer.

    View 6, Piper Cole Architects, Seattle Eastside WA

    How to choose

    Three questions to ask any architect

    Have you taken a shoreline substantial development permit through this specific jurisdiction. What did the last waterfront geotechnical report change about your design. Who will actually draw my house.

    Here the answer to the last one is always David.

    Questions

    Answered plainly.

    Not answered here? Call David.

    What does a lakefront home cost to build on Lake Washington?

    Well built Eastside custom homes run $300 to $500 per square foot, and $400 to $900 with high finishes, structural glass or a difficult site. Prime waterfront in Medina and Clyde Hill regularly passes $800. The new homes we design are typically $2M to $6M to build.

    Do I need a shoreline permit?

    If the work falls inside shoreline jurisdiction, yes. In Kirkland that is governed by the Shoreline Master Program under KZC Chapter 83, and it sits on top of the building permit rather than replacing it.

    How is shoreline setback measured?

    From the ordinary high water mark, not the property line, which is why buildable area on a waterfront lot is often much smaller than buyers expect.

    How long does a waterfront home take?

    Design through permit typically 12 to 20 months, because shoreline review runs in series with building review, plus 14 to 24 months of construction.

    Can you check a lot before I buy it?

    Yes, and it is the best hour you can spend. Call with the address and we will map what the shoreline and critical areas rules actually allow.

    Which waterfront areas do you work in?

    Lake Washington and Lake Sammamish shoreline across Kirkland, Bellevue, Medina, Clyde Hill, Mercer Island, Sammamish and Renton.

    Day 00001, Piper Cole Architects, Seattle Eastside WA

    Start here

    Let us design your waterfront home.

    The first feasibility check with David Meade is free and usually takes about a day. No obligation, no pitch. Call or WhatsApp direct.

    Free feasibility check

    Send the address and what you have in mind. David replies to you personally.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp