David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
  1. Home
  2. Locations
  3. Architect in Medina, WA

Medina, lakefront and estate homes

Architect in Medina, WA

Lakefront estates, new houses and major renovations in Medina, where large lots, the waterfront and 2026 interim setback rules shape what can be built. Confidential first conversations.

The first feasibility check is free.

Free feasibility check

Send the address and what you have in mind. David replies to you personally.

    What are you planning?
    Your details

    No obligation. Your details go to David only. See the privacy policy.

    • 1996Licensed architect since 1996
    • 1992AIA member since 1992
    • 20 to 30Projects designed each year
    • 3Masonry Excellence Awards, commercial projects
    • AIAAIA · NCARB · Washington licensed

    Why local matters

    A small city that reviews carefully

    Medina sits on the western shore of Lake Washington and holds some of the finest lakefront estates in the Pacific Northwest. Many of its most significant properties are being renovated or replaced as new owners invest.

    The City of Medina runs its own permitting through its Development Services department and reviews carefully, above all on large lots and the waterfront.

    Lots commonly carry tree retention and critical area obligations as well, so the timeline and the design both need to be planned around review from the start.

    What gets designed here

    Work in Medina

    Medina work tends to fall into three kinds.

    • Lakefront estate renovation and expansion. The most common Medina project, on properties ranging from mid century waterfront houses to contemporary homes.
    • New homes and replacements. Where an existing house comes down and the new one goes through permit review, on very large lots site plan review, and on the water a shoreline exemption or permit.
    • Interior renovation. Many Medina homes were built in the 1980s and 1990s and need updated floor plans, kitchens, bathrooms and energy performance.

    On the water

    Shoreline projects in Medina

    Shoreline properties need either a written exemption from the Shoreline Substantial Development Permit, decided by city staff, or the full permit, which goes to the hearing examiner with a 170 day processing deadline.

    That is the single biggest scheduling fact on a Medina waterfront project, and it is the reason the permit strategy should be settled before the design is.

    Permits

    Medina permit timelines

    Medina permits go through the city’s Development Services department. There is no general design review for houses; site plan review applies only to very large lots, set out in the Medina permit and zoning guide.

    ProjectTypical review
    Residential addition8 to 14 weeks
    New single family home14 to 22 weeks
    Shoreline projectseparate exemption or permit

    Planning ranges, not city figures. The city says it does not give out permit timelines; the code sets processing deadlines of 65, 100 or 170 days depending on the permit type.

    Budget

    What projects cost, in round numbers

    These are the planning ranges used across this site. The estimators on the linked pages turn them into a number for your size and scope.

    ProjectTypical rangeEstimator
    Architect led custom home$400 to $900 per sq ft (planning range)cost to build page
    High end custom or waterfrontTop of the $400 to $900 per sq ft rangecost to build page
    Whole house remodel$300 to $550 per sq ftwhole house remodel page
    Home addition$350 to $650 per sq fthome addition cost page
    Detached ADU$200,000 to $400,000ADU cost guide
    Architecture feeFixed fee, most $10,000 to $200,000architect fees page

    Swipe the table sideways to see every column

    Eastside figures from the cost pages on this site, each of which has an estimator that gives you your own number. Land, site work and permits sit on top of construction.

    Where

    Medina neighborhoods

    Medina work often connects with neighboring Clyde Hill, Hunts Point and Yarrow Point, and with West Bellevue across the city line.

    Questions

    Building in Medina, answered

    Not answered here? Call David.

    Do you work in Medina?

    Yes. Piper Cole Architects is based in Kirkland and Medina is part of the regular work. Medina estate and lakefront work is part of the practice, discussed in confidence.

    How long does a permit take in Medina?

    As planning ranges, allow 8 to 14 weeks for an addition and 14 to 22 weeks for a new house; the city itself does not publish timelines. A shoreline project needs either a written exemption or the full shoreline permit, which goes to the hearing examiner.

    What does an architect cost in Medina?

    I quote a fixed fee for design and permit, set by the project budget and location; most fall between $10,000 and $200,000 depending on scope. The architect fees page has a calculator for your own budget.

    Do I need an architect for a house in Washington?

    Not by law. RCW 18.08.410 exempts single family homes and buildings of four units or fewer from the stamp requirement. You will need permitted drawings and usually structural engineering. People hire an architect because the lot, the code or the design is complicated, not because the law requires one.

    What happens on the first call?

    You describe the property and what you want to do. David replies to you personally. The first feasibility check is free and usually takes about a day.

    Does Medina have design review?

    Not as a general rule. Medina has no general design review for houses. Site plan review, before the hearing examiner, applies only to very large lots or lots much larger than their neighbors, and the code says it is not meant to regulate architectural style.

    Plan the project

    Cost and service pages

    Nearby

    Nearby cities

    Our Architecture Services

    Full-service architecture for Medina Architect: Lakefront and Estate Homes and the greater Seattle area:

    Get a free feasibility check →

    David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA

    Next step

    Talk about your Medina property

    Describe the lot and what you want to do with it. You speak to David Meade directly, and the first feasibility check is free and usually takes about a day.

    Selected work

    Projects from the practice.

    See the full portfolio

    Free feasibility check

    Send the address and what you have in mind. David replies to you personally.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp