
Snoqualmie Ridge and the valley
Architect in Snoqualmie, WA
Custom homes on Snoqualmie Ridge, rural and estate homes in the Snoqualmie Valley, and renovations of first generation Ridge houses, with city or King County permits.
The first feasibility check is free and usually takes about a day.
Free feasibility check
Send the address and what you have in mind. David replies to you personally.
- 1996Licensed architect since 1996
- 1992AIA member since 1992
- 20 to 30Projects designed each year
- 3Masonry Excellence Awards, commercial projects
- AIAAIA · NCARB · Washington licensed
Why local matters
Design review on the Ridge, county rules in the valley
Snoqualmie sits at the foot of the Cascades, with the falls, the valley and the master planned community of Snoqualmie Ridge.
On the Ridge, community design review governs style, materials and landscaping, on top of the city permit. In the valley outside city limits, King County permits and zoning apply, including different ADU rules.
Jurisdiction and zoning are checked before design starts.
What gets designed here
Work in Snoqualmie
Snoqualmie work falls into four kinds.
- Custom homes on Snoqualmie Ridge. Lots from compact to estate size, some with Cascade views, designed to pass Ridge design review.
- Rural and estate homes. Farmland, horse properties and rural parcels in the valley, permitted through King County.
- Renovations. Ridge homes built from the late 1990s to the early 2010s: opening plans, better energy performance, kitchens, baths and outdoor living.
- ADUs. Allowed on city lots under state law. Rural county parcels have their own rules.
Projects
Recent work on the Eastside
Real houses, real constraints. Photographs and drawings from the practice.
Permits
Snoqualmie permit timelines
City of Snoqualmie Community Development reviews permits inside city limits. The valley is permitted through the King County Department of Local Services.
| Project | Typical review |
|---|---|
| Residential addition, city | 6 to 10 weeks |
| New single family home, city | 10 to 16 weeks |
| Rural residential, King County | 12 to 20 weeks |
Typical review times for a complete application. Ridge design review adds to these.
Budget
What projects cost, in round numbers
These are the same figures used everywhere on this site. The estimators on the linked pages turn them into a number for your size and scope.
| Project | Typical range | Estimator |
|---|---|---|
| Architect led custom home | $500 to $800 per sq ft | cost to build page |
| High end custom or waterfront | $800 to $1,200 and up per sq ft | cost to build page |
| Whole house remodel | $300 to $550 per sq ft | whole house remodel page |
| Home addition | $350 to $650 per sq ft | home addition cost page |
| Detached ADU | $200,000 to $400,000 | ADU cost guide |
| Architecture fee | Fixed fee, about $10,000 to $200,000 | architect fees page |
Swipe the table sideways to see every column
Eastside figures from the cost pages on this site, each of which has an estimator that gives you your own number. Land, site work and permits sit on top of construction.
Where
Snoqualmie neighborhoods
Snoqualmie Ridge, historic downtown near the falls, and the rural Snoqualmie Valley outside city limits.
Do you work in Snoqualmie?
Yes. Piper Cole Architects is based in Kirkland and Snoqualmie is part of the regular work. Ridge custom homes, valley estates and Ridge renovations are all part of it.
How long does a permit take in Snoqualmie?
Inside the city, allow 6 to 10 weeks for an addition and 10 to 16 weeks for a new house. Rural King County parcels typically take 12 to 20 weeks.
What does an architect cost in Snoqualmie?
Piper Cole Architects quotes a fixed fee for design and permit, set by the project budget and location, from about $10,000 to $200,000 depending on scope. The first feasibility check is free and usually takes about a day; an in-depth analysis is $1,500.
Do I need an architect for a house in Washington?
Not by law. RCW 18.08.410 exempts single family homes and buildings of four units or fewer from the stamp requirement. You will need permitted drawings and usually structural engineering. People hire an architect because the lot, the code or the design is complicated, not because the law requires one.
What happens on the first call?
You describe the property and what you want to do. David replies to you personally. The first feasibility check is free and usually takes about a day.
Does Snoqualmie Ridge have design review?
Yes. The Ridge has design review standards covering architectural style, materials and landscaping, in addition to the city permit.
Plan the project
Cost and service pages
- Cost to build a house in SeattleNew build cost by tier, with an estimator
- Architect feesWhat the design work costs, with a calculator
- Home addition costEvery addition type, with an estimator
- Whole house remodel costCost by depth, and the code trigger that moves budgets
- Custom home designNew houses on the lakes and on difficult lots
- Home additionsOut or up, and what it costs
- ADU and DADU designGarage conversions to backyard cottages
- Waterfront and lakefront homesShoreline lots and teardown rebuilds on the lakes
Read next
Guides for Snoqualmie projects
- HOA and design reviewGetting a design through community review
- How long a custom home takesDesign, permit and build, stage by stage
- Washington ADU laws in 2026What state law now allows on almost every lot
- Questions to ask an architectWhat to ask before you hire anyone
Nearby
Nearby cities
- Architect in Issaquah, WALocal permits, costs and the kind of work done there
- Architect in Sammamish, WALocal permits, costs and the kind of work done there
- Architect in Duvall, WALocal permits, costs and the kind of work done there
- Architect in Redmond, WALocal permits, costs and the kind of work done there
- Architect in Bellevue, WALocal permits, costs and the kind of work done there
- Architect in Woodinville, WALocal permits, costs and the kind of work done there
Our Architecture Services
Full-service architecture for Snoqualmie Architect: Custom Homes and Remodels and the greater Seattle area:
Service area
Other cities we work in
Based in Kirkland. Each city page covers local permits, zoning, shoreline rules and costs.
Studio, KirklandEastsideSeattle and the NorthSouth King and Pierce

Next step
Talk about your Snoqualmie property
Describe the lot and what you want to do with it. You speak to David Meade directly, and the first feasibility check is free and usually takes about a day.
Selected work
Projects from the practice.
Free feasibility check
Send the address and what you have in mind. David replies to you personally.



Strava Residence
Seattle Residence
Holmes Point Residence