David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
  1. Home
  2. Locations
  3. Architect in Lake Forest Park, WA

Lake Forest Park lakefront and wooded lots

Architect in Lake Forest Park, WA

Lakefront homes, custom houses among the trees, mid century renovations, additions and ADUs in Lake Forest Park, on the north shore of Lake Washington.

The first feasibility check is free and usually takes about a day.

Free feasibility check

Send the address and what you have in mind. David replies to you personally.

    What are you planning?
    Your details

    No obligation. Your details go to David only. See the privacy policy.

    • 1996Licensed architect since 1996
    • 1992AIA member since 1992
    • 20 to 30Projects designed each year
    • 3Masonry Excellence Awards, commercial projects
    • AIAAIA · NCARB · Washington licensed

    Why local matters

    Trees, slopes and the lake

    Lake Forest Park is a small, heavily wooded city on the north shore of Lake Washington, between Seattle and Kenmore, with old Douglas fir and western red cedar along winding streets.

    Lots are generous but often constrained by steep slopes, streams and the tree canopy, so the site is assessed before any design begins.

    Permits go through the City of Lake Forest Park, which has a reputation for careful, thorough review. Lakefront work adds shoreline review.

    What gets designed here

    Work in Lake Forest Park

    Lake Forest Park work falls into four kinds.

    • Lakefront homes. On one of the most sought after stretches of lakefront in the north end.
    • Custom homes among the trees. Sited to keep significant trees, with roof lines that clear the canopy.
    • Mid century modern renovation. Ramblers, post and beam houses and Northwest regional homes updated without losing what makes them valuable.
    • Additions and ADUs. Planned around critical areas from the first sketch.

    On the water

    On Lake Washington

    Lakefront lots require Shoreline Management Act compliance, including setbacks and, for significant projects, a Shoreline Substantial Development Permit.

    That adds roughly 3 to 6 months to the schedule.

    Permits

    Lake Forest Park permit timelines

    ProjectTypical review
    Residential addition8 to 12 weeks
    New single family home12 to 18 weeks
    Waterfront or shoreline projectan additional 3 to 6 months

    Typical City of Lake Forest Park review times for a complete application. The shoreline permit runs in addition.

    Site constraints

    Critical areas and canopy

    These are what decide what can be built on most lots here.

    • Steep slopes, often needing geotechnical review.
    • Streams and their buffers.
    • Significant trees that shape where the house and driveway can go.

    Budget

    What projects cost, in round numbers

    These are the same figures used everywhere on this site. The estimators on the linked pages turn them into a number for your size and scope.

    ProjectTypical rangeEstimator
    Architect led custom home$500 to $800 per sq ftcost to build page
    High end custom or waterfront$800 to $1,200 and up per sq ftcost to build page
    Whole house remodel$300 to $550 per sq ftwhole house remodel page
    Home addition$350 to $650 per sq fthome addition cost page
    Detached ADU$200,000 to $400,000ADU cost guide
    Architecture feeFixed fee, about $10,000 to $200,000architect fees page

    Swipe the table sideways to see every column

    Eastside figures from the cost pages on this site, each of which has an estimator that gives you your own number. Land, site work and permits sit on top of construction.

    Questions

    Building in Lake Forest Park, answered

    Not answered here? Call David.

    Do you work in Lake Forest Park?

    Yes. Piper Cole Architects is based in Kirkland and Lake Forest Park is part of the regular work. Lakefront homes and mid century renovations are a large part of it.

    How long does a permit take in Lake Forest Park?

    Allow 8 to 12 weeks for an addition and 12 to 18 weeks for a new house. Lakefront projects add about 3 to 6 months for the shoreline permit.

    What does an architect cost in Lake Forest Park?

    Piper Cole Architects quotes a fixed fee for design and permit, set by the project budget and location, from about $10,000 to $200,000 depending on scope. The first feasibility check is free and usually takes about a day; an in-depth analysis is $1,500.

    Do I need an architect for a house in Washington?

    Not by law. RCW 18.08.410 exempts single family homes and buildings of four units or fewer from the stamp requirement. You will need permitted drawings and usually structural engineering. People hire an architect because the lot, the code or the design is complicated, not because the law requires one.

    What happens on the first call?

    You describe the property and what you want to do. David replies to you personally. The first feasibility check is free and usually takes about a day.

    Plan the project

    Cost and service pages

    Read next

    Guides for Lake Forest Park projects

    Nearby

    Nearby cities

    Our Architecture Services

    Full-service architecture for Lake Forest Park Architect: Lakefront, Renovation and the greater Seattle area:

    Get a free feasibility check →

    David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA

    Next step

    Talk about your Lake Forest Park property

    Describe the lot and what you want to do with it. You speak to David Meade directly, and the first feasibility check is free and usually takes about a day.

    Selected work

    Projects from the practice.

    See the full portfolio

    Free feasibility check

    Send the address and what you have in mind. David replies to you personally.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp