5831 Rec Room 2048×1137, Piper Cole Architects, Seattle Eastside WA
  1. Home
  2. Services
  3. Interior Architecture

Architecture Services

Interior Architecture

The first feasibility check is free and usually takes about a day.

Free feasibility check

Send the address and what you have in mind. David replies to you personally.

    What are you planning?
    Your details

    No obligation. Your details go to David only. See the privacy policy.

    • 1996Licensed architect since 1996
    • 1992AIA member since 1992
    • 20 to 30Projects designed each year
    • 3Masonry Excellence Awards, commercial projects
    • AIAAIA · NCARB · Washington licensed

    Interior Architecture in Seattle & Kirkland, WA

    Interior architecture is the discipline that bridges structure and inhabitation, the decisions about space, light, proportion, and material that determine how a building feels from the inside. At Piper Cole Architects, interior architecture is integrated into every project from the very first sketch, ensuring that exterior vision and interior experience are inseparable.

    Interior Architecture Services

    Spatial Planning

    How rooms relate to each other, how circulation flows, how proportions make people feel comfortable or expansive.

    Staircase Design

    Sculptural and functional, a staircase is often the centerpiece of a home. We design stairs that make a statement.

    Built-in Cabinetry & Millwork

    Custom built-ins, shelving, window seats, and cabinetry designed as part of the architecture, not added after.

    Ceiling & Lighting Architecture

    Coffered ceilings, exposed structure, skylights, and lighting integration that shape the character of every room.

    Material & Finish Selection

    We guide clients through material selection with an architect’s eye for proportion, durability, and coherence.

    Interior Architecture vs. Interior Design

    Interior architecture is distinct from interior decoration or interior design. It addresses the structural, spatial, and technical aspects of interior space, walls, floors, ceilings, built elements, and openings. Our interior architecture work is always coordinated with the structural and mechanical systems of the building, resulting in spaces that are not only beautiful but buildable.

    Integrated with Every Project

    Whether you are building a new home, adding to an existing one, or renovating, our interior architecture services are available as part of a full project or as a focused engagement on specific interior spaces.

    Areas We Serve

    We serve clients in Kirkland, Seattle, Bellevue, Redmond, Mercer Island, and throughout the Seattle metro area.

    Frequently Asked Questions

    What is the difference between an interior architect and an interior designer?

    An interior architect holds a professional architecture license and can address structural, spatial, and technical aspects of interior space. An interior designer focuses primarily on finishes, furnishings, and decoration. For projects involving structural walls, built-ins, or spatial reconfiguration, an architect is the appropriate professional.

    Discuss Your Interior Project

    Ready to create interiors that are as thoughtfully designed as the exterior? Contact Piper Cole Architects to schedule a consultation.

    Explore Our Other Services

    Residential Architecture

    Custom homes, ADUs, and additions across the Seattle Eastside.

    Learn More

    Commercial Architecture

    Office, retail, and mixed-use projects in the greater Seattle area.

    Learn More

    Interior Architecture

    Spatial planning, interior detailing, and finish selections.

    Learn More

    Renovation & Restoration

    Historic renovations and whole-home remodels.

    Learn More

    Our Design Process

    See how we guide projects from concept to completion.

    Learn More

    From Our Blog

    Services

    What we design

    Custom Home Design

    New homes and teardown rebuilds

    Costs and process

    Home Additions

    Primary suites, kitchens, family rooms

    Costs and process

    Second Story Additions

    Add a floor, keep your lot

    Costs and process

    Waterfront & Lakefront Homes

    Lake Washington and Lake Sammamish

    Costs and process

    ADU & DADU Design

    Backyard cottages and garage conversions

    Costs and process

    Renovation & Restoration

    Whole-house remodels and historic homes

    Costs and process

    5831 Rec Room 2048×1137, Piper Cole Architects, Seattle Eastside WA

    Next step

    Start Your Project

    free feasibility check, no obligation. Licensed architect serving Kirkland and the greater Seattle metro area.

    Free feasibility check

    Send the address and what you have in mind. David replies to you personally.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp