Day 00003, Piper Cole Architects, Seattle Eastside WA
  1. Home
  2. Locations
  3. Architect in Bellevue, WA

Bellevue, West Bellevue to Somerset

Architect in Bellevue, WA

New custom homes, whole house remodels and additions in Bellevue, including waterfront in Enatai and hillside lots in Somerset. Permit sets built for Bellevue’s own review tracks and critical areas rules.

The first feasibility check is free and usually takes about a day.

Free feasibility check

Send the address and what you have in mind. David replies to you personally.

    What are you planning?
    Your details

    No obligation. Your details go to David only. See the privacy policy.

    • 1996Licensed architect since 1996
    • 1992AIA member since 1992
    • 20 to 30Projects designed each year
    • 3Masonry Excellence Awards, commercial projects
    • AIAAIA · NCARB · Washington licensed

    Why local matters

    Bellevue has its own rules, and they change the design

    Bellevue is one of the most active markets for this practice. Homeowners who bought mid century houses are now investing $400,000 to $1M and more to bring them up to the standard of the street around them.

    What makes Bellevue different is regulatory. A two track residential permit system, a strict reading of the Substantial Improvement rule, and a Critical Areas Ordinance that affects a large share of lots.

    Pricing a Bellevue remodel from a national calculator usually leaves the budget short by 20% to 35%.

    What gets designed here

    Work in Bellevue

    Bellevue work covers the full range, from luxury waterfront residences in West Bellevue to mid century remodels in Lake Hills and Factoria.

    • Custom homes. Full BR track permit packages, including civil and grading plans, arborist reports and energy code documentation.
    • Waterfront residences. West Bellevue and adjacent Medina are among the most expensive residential markets in the state, often on Lake Washington.
    • Whole house remodels. Where the Substantial Improvement rule decides the scope long before the finishes do.
    • Additions. Primary suites, kitchen expansions and second stories, which is how many Bellevue families get the space without moving.
    • ADUs. Bellevue allows ADUs on most residential lots.

    On the water

    Waterfront and hillside Bellevue

    Enatai waterfront and Somerset hillsides are two very different problems. One brings shoreline rules and setbacks from the water, the other brings steep slope review and retaining work.

    Both reward mapping the constraints first. In Bellevue that means pulling the GIS overlay before developing a concept, because finding a buffer on paper is far cheaper than finding it after the foundation is dug.

    Permits

    Bellevue permit timelines

    Bellevue permits go through City of Bellevue Development Services, submitted via MyBuildingPermit.com. Nearly all additions and custom homes run on the BR track.

    ProjectTypical review
    Residential addition4 to 8 weeks
    New single family home8 to 14 weeks
    Commercial or mixed use10 to 20 weeks, plus design review

    Review times as published for Bellevue’s current process. Correction cycles extend these, which is why a complete first submission matters.

    Site constraints

    Bellevue’s Critical Areas Ordinance

    Governed by LUC 20.25H. On a large share of Bellevue projects at least one of these affects the design:

    • Steep slopes. Grades over 15% need geotechnical review, and slopes over 40% trigger 25 to 50 foot buffers where nothing can be built.
    • Wetlands. Buffers from 25 feet for Category IV up to 200 feet for Category I, which directly limits rear additions and ADU placement.
    • Streams. Kelsey Creek, Coal Creek and their tributaries carry 50 to 150 foot setbacks.
    • Substantial Improvement. Bellevue triggers full code compliance at a lower threshold than most homeowners expect.

    Budget

    What projects cost, in round numbers

    These are the same figures used everywhere on this site. The estimators on the linked pages turn them into a number for your size and scope.

    ProjectTypical rangeEstimator
    Architect led custom home$500 to $800 per sq ftcost to build page
    High end custom or waterfront$800 to $1,200 and up per sq ftcost to build page
    Whole house remodel$300 to $550 per sq ftwhole house remodel page
    Home addition$350 to $650 per sq fthome addition cost page
    Detached ADU$200,000 to $400,000ADU cost guide
    Architecture feeFixed fee, about $10,000 to $200,000architect fees page

    Swipe the table sideways to see every column

    Eastside figures from the cost pages on this site, each of which has an estimator that gives you your own number. Land, site work and permits sit on top of construction.

    Where

    Bellevue neighborhoods

    Bellevue work spans West Bellevue, Enatai, Somerset, Lake Hills, Newport Hills, Factoria, Eastgate, Crossroads, Newcastle, BelRed and the downtown core.

    Questions

    Building in Bellevue, answered

    Not answered here? Call David.

    Do you work in Bellevue?

    Yes. Piper Cole Architects is based in Kirkland and Bellevue is part of the regular work. Bellevue is one of the most active markets for the practice.

    How long does a permit take in Bellevue?

    About 4 to 8 weeks for a residential addition and 8 to 14 weeks for a new house, before correction cycles. Commercial and mixed use run 10 to 20 weeks plus design review.

    What does an architect cost in Bellevue?

    Piper Cole Architects quotes a fixed fee for design and permit, set by the project budget and location, from about $10,000 to $200,000 depending on scope. The first feasibility check is free and usually takes about a day; an in-depth analysis is $1,500.

    Do I need an architect for a house in Washington?

    Not by law. RCW 18.08.410 exempts single family homes and buildings of four units or fewer from the stamp requirement. You will need permitted drawings and usually structural engineering. People hire an architect because the lot, the code or the design is complicated, not because the law requires one.

    What happens on the first call?

    You describe the property and what you want to do. David replies to you personally. The first feasibility check is free and usually takes about a day.

    Will the Critical Areas Ordinance affect my lot?

    Quite possibly. Steep slopes, wetlands and streams each carry buffers under LUC 20.25H, and they are checkable from the GIS overlay before any design time is spent. That check comes first.

    Plan the project

    Cost and service pages

    Nearby

    Nearby cities

    Our Architecture Services

    Full-service architecture for Architect Bellevue: Custom Homes, Remodels, Additions and the greater Seattle area:

    Get a free feasibility check →

    Day 00003, Piper Cole Architects, Seattle Eastside WA

    Next step

    Talk about your Bellevue property

    Describe the lot and what you want to do with it. You speak to David Meade directly, and the first feasibility check is free and usually takes about a day.

    Selected work

    Projects from the practice.

    See the full portfolio

    Free feasibility check

    Send the address and what you have in mind. David replies to you personally.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp