Key takeaways
- Seattle’s single family zones NR1, NR2 and NR3 became one Neighborhood Residential (NR) zone on January 21, 2026. Residential Small Lot (RSL) zones became Lowrise 1 or Neighborhood Residential.
- In NR the adopted numbers are: 32 foot height (plus a pitched roof allowance), lot coverage 50 percent, front and rear setbacks of 15 feet with one or two units, sides of 5 feet average and 3 feet minimum, and one dwelling unit per 1,250 square feet of lot, with up to four units on a lot under 5,000 square feet.
- Your zone is on the City’s official land use map; SDCI’s Property Information (GIS) map shows it with critical area and shoreline layers, and its research tool prints a Site Characteristics Report.
- A draft clean-up for NR was released October 26, 2026 and is not law. Steep slopes, shoreline and trees can change the numbers on a particular lot.
Short answer: look up your lot on SDCI’s Property Information (GIS) map. If it says NR, the rules are the ones Ordinance 127376 put in place on January 21, 2026: 32 feet of height, 50 percent lot coverage, 15 foot front and rear setbacks, side setbacks of 5 feet on average and 3 feet at the narrowest, and a density rule of one home per 1,250 square feet of lot, accessory units included (5,000 / 1,250 = 4 homes on a 5,000 square foot lot). If it says LR, MR or a commercial code, you are under a different chapter.
Piper Cole designs and administers construction; I do not build. The sources for this page were read on 15 November 2026: Ordinance 127376 (the City Clerk’s PDF), the Office of Planning and Community Development (OPCD) One Seattle Plan page and its January 2026 summary of the Neighborhood Residential standards, and the Seattle Department of Construction and Inspections (SDCI) pages on zoning, the Neighborhood Residential code, research tools, environmentally critical areas and the Shoreline Master Program. Seattle’s codified code on Municode was not read for this page; the wording comes from the ordinance as passed. The City’s current code controls, so confirm any figure with SDCI.
How to find your zone
SDCI says the zoning districts “are shown geographically on the City’s official land use map,” and the ordinance itself amends “The Official Land Use Map, Chapter 23.32.” For an address, SDCI’s research page gives two routes:
- The Property Information (GIS) map. You enter an address or zoom to a point and turn on layers. SDCI lists zoning, environmentally critical areas, urban centers and villages, parcel boundaries and shoreline environments among them. OPCD adds that the maps of frequent transit service areas and of areas within one quarter mile of a major transit stop are on the same map.
- The Permit and Site History Research Tool. For an address it returns a Site Characteristics Report that SDCI says provides “current zoning information overlays and other land use data,” with links to the King County Assessor.
Use the Assessor’s parcel page for the legal description and parcel number, and a survey for the real lot area; several rules below turn on lot area, and the area that counts can be smaller than the deed. Two warnings from SDCI itself: most critical area maps are “advisory,” and SDCI uses a topographic survey or wetland report to confirm whether a critical area is present.
The zone families, and what happened to NR1, NR2, NR3 and RSL
SMC 23.30.010, as the ordinance amends it, lists the zoning designations Seattle uses. They group like this:
| Family | Abbreviations in 23.30.010 | Where to read more |
|---|---|---|
| Neighborhood Residential | NR | SMC chapter 23.44; the table below |
| Lowrise multifamily | LR1, LR2, LR3 | Seattle LR1, LR2 and LR3 guide |
| Midrise and highrise multifamily | MR, HR | SMC Title 23, Subtitle III, and SDCI’s code pages |
| Residential-Commercial | RC (paired with a multifamily designation) | SMC Title 23, Subtitle III |
| Neighborhood Commercial and Commercial | NC1, NC2, NC3, C1, C2 | SDCI’s Commercial Zoning Summary |
| Seattle Mixed, master planned and downtown | SM-D, SM-NR, SM-RB, SM-U, SM-UP, SM-NG and a South Lake Union designation; MPC-YT; DOC1, DOC2, DRC, DMC, DMR, PSM, IDM, IDR, DH1, DH2, PMM | SMC Title 23, Subtitle III |
| Industrial | IG1, IG2, IB, IC, MML, II, UI | SDCI’s Industrial Zoning Summary |
The renaming is in Table A of Section 1 of the ordinance, which re-zones existing designations: NR1, NR2, NR3 and NR3-PUD become NR, and RSL (M) becomes LR1 (M). Properties identified on the ordinance’s Attachment 1 maps are rezoned as those maps show. OPCD describes the result as changing “areas previously zoned Residential Small Lot to Lowrise or Neighborhood Residential.” NR3 is no longer in the list of zone designations in SMC 23.30.010, so a document that still says NR3 is out of date or refers to the old designation.
SDCI describes the new NR zone as “moderate density housing” that includes attached, detached and stacked units and accessory dwelling units, and says Ordinance 127376 “brought our code into compliance with state laws related to middle housing.”
Neighborhood Residential: the numbers in force
These come from the ordinance’s new SMC chapter 23.44, which passed Council on December 16, 2025, was approved by the Mayor on December 22, 2025, and which OPCD says became effective on January 21, 2026.
| Standard | What the ordinance sets | Section |
|---|---|---|
| Height | 32 feet. The ridge of a pitched roof that is not a shed or butterfly roof (4:12 or steeper) may rise up to 5 feet above that. 42 feet where listed conditions are met, such as keeping a Tier 1 or Tier 2 tree or three or more units with a front setback of at least 20 feet. Accessory structures in a required setback: 12 feet | 23.44.070.A and B |
| Lot coverage | 50 percent of lot area (60 percent for stacked units and some clustered groupings). Underground structures, the first 36 inches of eaves, decks 36 inches or less above grade and low unenclosed porches and steps are not counted | 23.44.080 |
| Floor area ratio | 0.6 for density less than 1 unit per 4,000 square feet; 0.8, 1.0 and 1.6 on denser rows (the table adds higher figures for stacked units meeting extra conditions, and 1.8 for some clustered groupings in frequent transit service areas). Lots under 5,000 square feet may use up to 2,500 square feet if that is more. Underground floor area is exempt | 23.44.050, Table A |
| Front setback | 15 feet with one or two dwelling units; 10 feet with three or more | 23.44.090, Table A |
| Rear setback | 15 feet with one or two principal units and no alley; 10 feet with three or more; none if the rear abuts an alley; 5 feet for an accessory dwelling unit | 23.44.090, Table A |
| Side setback | 5 feet average, 3 feet minimum | 23.44.090, Table A |
| Separation between structures | 5 feet between structures that contain floor area, with a larger figure where a driveway or parking aisle runs between | 23.44.100.A |
| Smaller lots in frequent transit areas | Lots under 5,000 square feet inside a frequent transit service area: 3 foot sides and a 5 foot rear | 23.44.090, Table A |
Queen Anne Boulevard lots have a different front setback, written into a footnote to Table A. Lot coverage, setbacks and floor area each have their own page of detail, with two worked lots, at lot coverage, setbacks and FAR explained for Seattle; I will not repeat that arithmetic here.
Free feasibility check
Planning a custom home or a remodel of $750,000 or more?
Send me the address and a few lines about what you want. The first feasibility check is free and usually takes about a day.
How many homes a lot can hold
Density decides how many homes a lot can hold. SMC 23.44.060 sets the maximum density at one dwelling unit per 1,250 square feet of lot area for attached and detached units (stacked units have their own, denser lines). Three details decide the real number:
- Accessory units count. “When calculating density, the number of dwelling units shall include both accessory dwelling units and principal dwelling units.” A house plus two backyard or attached units is three units for density, floor area ratio and lot coverage. OPCD’s summary says the same.
- Fractions round at 0.85. “Any fraction over 0.85 constitutes one additional unit.” A 6,000 square foot lot divides to 4.8 units, which is four, not five.
- Four and six unit exceptions. A lot under 5,000 square feet may have up to four units, and a lot under 7,500 square feet within a quarter mile walking distance of a stop on a major transit service may have up to six, in each case only if the lot has no riparian corridor, wetland or buffer, submerged land or shoreline setback area, or designated non-disturbance steep slope area. A third path to six units, for lots farther from transit, requires at least two low-income units under a regulatory agreement and has its own list of conditions in 23.44.060.C.3.
For lots with those critical areas, the area they occupy is taken out of the lot size used for density, and OPCD says density is “reduced in proportion to percentage of lot that contains” critical areas, with at least one unit allowed on every existing lot. New lots created after the ordinance’s effective date must be at least 5,000 square feet (23.44.060.B), and OPCD’s summary says new parent lots under 5,000 square feet cannot be created. The accessory unit standards themselves, such as size and height, sit in SMC 23.42.022 and are on the Seattle DADU rules page.
One lot, read step by step
This is an illustration, not your lot: an interior lot 50 feet wide and 120 feet deep, 6,000 square feet, no alley, no critical area, SDCI’s map showing NR. It asks a different question from the lot coverage page: what the zone allows overall.
| Step | Arithmetic | Result |
|---|---|---|
| Units from density | 6,000 / 1,250 = 4.8; the fraction 0.8 is not over 0.85 | 4 units. Up to 6 if the lot is under 7,500 square feet, has no critical area, and either is within a quarter mile walk of a stop on a major transit service or meets the low income unit conditions in 23.44.060.C.3 |
| Footprint cap | 6,000 x 0.50 | 3,000 square feet of lot coverage, whatever the unit count |
| Setback envelope, simple reading | Width 50 to 5, 5 = 40; depth 120 to 15, 15 = 90; 40 x 90 | 3,600 square feet. The 3,000 coverage cap is the tighter limit on the ground. If the side setbacks are averaged at 5 with a 3 foot minimum, the envelope can differ; SDCI decides how |
| Floor area, one house | 6,000 per unit is less dense than 1 per 4,000, so 0.6; 6,000 x 0.6 | 3,600 square feet of chargeable floor area (underground floor area is exempt) |
| Floor area, house plus one unit | 3,000 per unit falls in the 1 per 4,000 to 1 per 2,201 row, so 0.8; 6,000 x 0.8 | 4,800 square feet shared by both |
| Floor area, three units | 2,000 per unit falls in the 1 per 2,200 to 1 per 1,601 row, so 1.0; 6,000 x 1.0 | 6,000 square feet |
| Floor area, four units | 1,500 per unit is denser than 1 per 1,600, so 1.6 for attached and detached units; 6,000 x 1.6 | 9,600 square feet as a ceiling only: whether it fits depends on the 3,000 square foot coverage cap, the height limit and the other standards |
| Tree points, one unit | 6,000 / 500 = 12 points required; a large deciduous tree planted as part of construction earns 4 points | 12 points for a new house, or one new tree for every 2,500 square feet of lot area (6,000 / 2,500 = 2.4), whichever results in the greater number of trees, SMC 23.44.120 |
Two cautions. Floor area ratio is a ceiling, not a promise; coverage, height, setbacks, separation and trees all still apply. And the table reads the base rows only: a real lot adds its alley, slope, trees, existing house and survey.
What changed on January 21, 2026
The older Chapter 23.44 text that the ordinance repeals is printed in Attachment 2 to it, and the middle column below follows that text. One more layer sits in between: Interim Ordinance 127219, passed May 27, 2025 and itself repealed by Ordinance 127376 (it is Attachment 3), took effect no earlier than June 30, 2025 under its own terms. Its text set a 32 foot height limit, 15 foot front and rear yards on lots with one or two dwelling units, and 50 percent coverage on lots with two or more principal and detached accessory units, so a plan or article from mid 2025 to January 2026 may match neither column.
| Standard | Older Chapter 23.44 text (repealed, Attachment 2) | Since January 21, 2026 |
|---|---|---|
| Zone names | NR1, NR2, NR3, RSL | NR; RSL areas became LR1 or NR |
| Height | 30 feet (25 feet on lots 30 feet wide or less) | 32 feet, plus pitched roof allowance |
| Lot coverage | 35 percent on lots of 5,000 square feet or more; 1,000 square feet plus 15 percent on smaller lots | 50 percent |
| Floor area ratio | 0.5 for a single family house; 2,500 square feet on lots under 5,000 | 0.6 for one house on a lot over 4,000 square feet; rises with unit count |
| Front setback | 20 feet, or the average of the neighbors’ front yards if less | 15 feet with one or two units |
| Rear setback | 25 feet or 20 percent of lot depth, whichever is less, never under 10 feet | 15 feet with no alley |
| Side setback | 5 feet | 5 feet average, 3 feet minimum |
If you rely on a figure from an earlier plan, survey notes or a pre-2026 article, check it against the right column before you act on it. A design drawn to the old 35 percent cap on a one-unit lot, for example, would leave up to 15 percentage points of the lot unused under today’s 50 percent cap.
In force, under appeal, and still a draft
Four different statuses sit on OPCD’s One Seattle Plan page, and they are easy to confuse.
- In force. Phase One, the Neighborhood Residential update in Ordinance 127376, became effective on January 21, 2026.
- In force while the City appeals. On September 9, 2026 the Central Puget Sound Growth Management Hearings Board upheld the Comprehensive Plan but found the environmental impact statement inadequate. OPCD says “The Comprehensive Plan and associated zoning changes adopted by City Council remain in effect while we prepare the new analysis,” and that the Mayor supports the City Attorney’s decision to appeal.
- Draft. OPCD released Neighborhood Residential Clean Up draft legislation on October 26, 2026, took comments until November 9, and plans to transmit it to Council in late 2026. OPCD’s draft Director’s report, read on November 15, 2026, lists a proposed change to “Allow interior lots to use front setback equal to average of adjacent lots” and says the legislation proposes to restore the allowance to calculate the front setback as the average of structures on adjacent lots. A draft can change, so design to 15 feet unless SDCI tells you otherwise.
- Proposed and delayed. The Phase Two Centers and Corridors legislation, transmitted to Council on January 29, 2026, would allow more apartments and condos in Neighborhood Centers, new and expanded Urban Centers and along frequent transit routes. OPCD says its adoption is “currently delayed because of ongoing legal appeals of the City’s EIS.” OPCD publishes an interactive map of the proposed rezones.
Proposed rezones are not the zone today.
Critical areas, shoreline, trees and overlays
Zoning is the first layer. SMC 23.44.010 itself says: “Some land in these zones may be regulated by Subtitle III, Division 3, Overlay Districts, of this Title 23 in addition to the standards of this Chapter 23.44,” and lists other regulations that may apply, including shoreline regulations (chapter 23.60A) and environmental protection and historic preservation (Title 25). The pointers that bear on a house:
- Environmentally critical areas. SDCI’s page lists landslide-prone, liquefaction-prone and peat-settlement-prone areas, seismic hazard areas, steep slope erosion hazard areas, volcanic hazard areas, flood-prone areas, wetlands, fish and wildlife habitat areas and abandoned landfills, defined in SMC 25.09.012. These reduce density and lot coverage on the affected lot, as the ordinance and OPCD describe, and a lot that holds one is not read from the zoning alone. See Seattle critical areas and your building project.
- Shoreline. The Shoreline Master Program, SMC 23.60A, requires a shoreline substantial development permit or a shoreline exemption for development in the Shoreline District. SDCI describes the District as including “all land within 200 feet of the shoreline, hydrologically connected wetlands, and all submerged land,” and says the pre-2017 critical area rules apply there.
- Trees. A development with new dwelling units must plant or keep trees for the tree points in 23.44.120, and SDCI’s page lists SMC chapter 25.11 (Trees). See the Seattle tree ordinance and your project.
- Overlay districts. A lot can sit inside an overlay that adds its own standards. SDCI says the Site Characteristics Report provides overlay and other land use data for an address.

If your house is outside Seattle
Nothing on this page applies across the city line. Each Eastside city has its own zones and its own definitions of height, coverage and floor area, and they differ from Seattle’s. Read your city’s page: Kirkland, Bellevue, Mercer Island or Redmond. Never carry a Seattle number into a neighboring city’s calculation.
What I would do before designing
- Pull the Site Characteristics Report and the GIS map for the address, and write down the zone, any critical area, the Shoreline District, urban center or village, and transit layers.
- Get a survey that gives the real lot area, the slope, the trees and the existing structures. See existing conditions and as-built drawings.
- Subtract any area that does not count toward lot size, then compute units, coverage and floor area as in the example above.
- Draw the setback lines, including the 15 foot front and rear, and check them against the house you have. For an addition, see home additions in Seattle.
- Ask SDCI about anything the ordinance leaves to the Director, such as how a side setback average is applied to a stepped wall.
- When you are ready to apply, read the Seattle building permit guide.
Before you draw
Find out what the zoning means for your lot
Send me the address and what you want to build. The first basic feasibility check is free and usually takes about a day; the in-depth analysis is $1,500 and takes 2 to 3 weeks.
Questions
How do I find the zoning for my Seattle property?
Use SDCI’s Property Information (GIS) map, where you enter an address and turn on the zoning layer, or SDCI’s Permit and Site History Research Tool, which produces a Site Characteristics Report with current zoning and overlay information. SDCI says the zoning districts are shown on the City’s official land use map. Most critical area maps are advisory, so a survey confirms what is on the lot.
What does NR zoning mean in Seattle, and what happened to NR1, NR2 and NR3?
NR means Neighborhood Residential. Under Ordinance 127376, effective January 21, 2026, the former NR1, NR2, NR3 and NR3-PUD designations became a single NR zone, and areas zoned Residential Small Lot became Lowrise 1 or NR. SDCI describes NR as moderate density housing that includes attached, detached and stacked units and accessory dwelling units.
How many homes can I build on a Seattle NR lot?
The maximum density is one dwelling unit per 1,250 square feet of lot area for attached and detached units, counting accessory units, with fractions over 0.85 rounding up. A lot under 5,000 square feet may have up to four units, and a lot under 7,500 square feet within a quarter mile walk of a major transit stop may have up to six, if it holds no critical area; a third path to six units, for lots farther from transit, needs two low-income units. A lot with critical areas gets a reduced count (SMC 23.44.060).
What are the setbacks and height limit in Seattle’s Neighborhood Residential zone?
Front 15 feet and rear 15 feet with one or two dwelling units and no alley; sides 5 feet average and 3 feet minimum. The height limit is 32 feet, plus up to 5 feet for the ridge of a pitched roof at 4:12 or steeper, and 42 feet where listed conditions are met (SMC 23.44.090 and 23.44.070). The older Chapter 23.44 text that the ordinance repealed had a front yard of 20 feet (or the neighbors’ average if less), a rear yard of 25 feet (or 20 percent of lot depth if less) and a 30 foot height limit; an interim ordinance in 2025 had already changed some of those numbers.
Are the new Seattle zoning rules actually in effect, given the appeal?
Yes, according to the OPCD page read on November 15, 2026. OPCD says the Neighborhood Residential legislation became effective on January 21, 2026, and that after the September 9, 2026 Growth Management Hearings Board decision, the zoning changes adopted by Council remain in effect while the City prepares new analysis and appeals. A separate clean-up package released October 26, 2026 is only a draft.
Does a steep slope, wetland or shoreline change what my zone allows?
It can. Lot area that holds a riparian corridor, wetland and buffer, submerged land, shoreline setback area or designated non-disturbance steep slope does not count toward lot size for density or lot coverage, and the lot coverage allowed on such a lot is not less than 625 square feet. Shoreline lots also need a shoreline permit or exemption under SMC 23.60A.
Does an accessory dwelling unit count against the zoning limits?
Yes. The density rule says the number of units includes both accessory and principal units, and OPCD says accessory units count toward density, floor area and lot coverage. They are exempt from some other requirements, such as parking. The accessory unit standards are in SMC 23.42.022.
Do Eastside cities use the same zones and numbers as Seattle?
No. Kirkland, Bellevue, Mercer Island, Redmond and every other Eastside city adopt their own zones and their own definitions of height, lot coverage and floor area. Use the city’s own page for your address instead of a Seattle figure.
Frequently Asked Questions
How do I find the zoning for my Seattle property?
Look up your address using the Seattle Department of Construction and Inspections GIS map or the city parcel viewer. Your zone designation determines what you can build, how large, and how tall. An architect can pull and interpret the zoning for your specific lot.
What is FAR and how does it limit what I can build?
FAR, or floor area ratio, is the ratio of total building floor area to lot size. If your lot is 5,000 square feet and holds one house, the Neighborhood Residential FAR limit is 0.6, so you can build 3,000 square feet of chargeable floor area (5,000 x 0.6), not counting underground floor area. Adding units raises the FAR the lot is allowed. FAR is one of the main constraints on how much house you can add.
What are setbacks in Seattle?
Setbacks are the minimum distances a structure must sit from the front, side, and rear property lines. They vary by zone and by structure type, and they often determine where an addition or ADU can physically go on your lot.
How tall can I build on a Seattle residential lot?
Height limits depend on your zone. Neighborhood Residential zones allow 32 feet for a house, plus up to 5 feet for the ridge of a pitched roof, and 42 feet for certain listed development types. Accessory structures in required setbacks are limited to 12 feet, plus 3 feet for a pitched ridge; a detached ADU otherwise follows the same height standard as the house.
What is lot coverage and why does it matter?
Lot coverage is the percentage of your lot that structures are allowed to cover. Exceeding it is one of the most common reasons a design has to be revised, so it is checked early in the design process.
Can I build an ADU on my Seattle lot?
Most single-family lots in Seattle can accommodate an attached ADU, a detached ADU, or both, subject to size, height, setback, and lot-coverage limits. A feasibility review confirms what your specific lot allows.
Authoritative sources
Regulatory requirements referenced in this guide are set by the official agencies below. Rules change, always confirm current requirements with the source:




