
- Home
- Process
How a project runs
Our Architectural Design Process
At Piper Cole Architects, we guide every project through a proven, collaborative process. David Meade has worked as an architect since 1996 and designs 20 to 30 projects a year across the Seattle metro area.
- 1996Licensed architect since 1996
- 1992AIA member since 1992
- 20 to 30Projects designed each year
- 3Masonry Excellence Awards, commercial projects
- AIAAIA · NCARB · Washington licensed
Step 1: Initial Consultation
We begin with a conversation about your goals, site, timeline, and budget. This no-pressure meeting gives you clarity on direction and next steps.
Step 2: Schematic Design
We develop drawings that translate your vision into architectural concepts, exploring options and refining direction based on your feedback.
Step 3: Design Development
We evolve the approved schematic into a detailed design. Materials, finishes, and structural systems are integrated so you have a clear picture of the finished project.
Step 4: Construction Documents
We produce the complete set of drawings and specifications required for permitting and construction. Comprehensive, coordinated, and precise.
Step 5: Permitting
We manage the permitting process with local authorities in Kirkland, Seattle, Bellevue, and surrounding jurisdictions. Our familiarity with local codes keeps projects moving.
Step 6: Construction Administration
We remain engaged during construction, visiting the site, reviewing submittals, and ensuring the built work matches the design intent.
Ready to Begin?
Contact us today to schedule your free feasibility check.

Next step
Start with a free feasibility check
The first feasibility check is free and usually takes about a day.
Free feasibility check
Send the address and what you have in mind. David replies to you personally.


