Day 00001, Piper Cole Architects, Seattle Eastside WA
  1. Home
  2. Services
  3. Residential Architecture in Seattle and the Eastside

Residential architecture, Seattle and the Eastside

Residential Architecture in Seattle and the Eastside

New houses, additions, ADUs and whole house remodels across Kirkland, Bellevue and the Eastside. One licensed architect from the first site walk to the last site visit, not a team you never meet.

The first feasibility check is free and usually takes about a day.

Free feasibility check

Send the address and what you have in mind. David replies to you personally.

    What are you planning?
    Your details

    No obligation. Your details go to David only. See the privacy policy.

    • 1996Licensed architect since 1996
    • 1992AIA member since 1992
    • 20 to 30Projects designed each year
    • 3Masonry Excellence Awards, commercial projects
    • AIAAIA · NCARB · Washington licensed

    What this covers

    Four kinds of work, one way of working

    Most people arrive here knowing roughly what they want to do and not what it costs, how long the permit takes, or whether the lot will even carry it. Those are the three questions this practice answers first, before anybody draws.

    David Meade has practised in Kirkland. You speak to him, not to a salesperson, and the first thirty minutes are free.

    The work

    Where to start

    Pick the page that matches the project. Each one carries the real cost range for that work and an estimator you can set to your own size.

    • A new custom home. Lakefront, view and difficult lots, on a fresh site or a teardown and rebuild.
    • An addition. Out or up, from a primary suite to a full second story.
    • An ADU or DADU. Garage conversions, basement units and backyard cottages under the current state rules.
    • A whole house remodel. Down to the studs or a level below it, on houses worth keeping.

    The numbers

    What residential work costs here, in round numbers

    These are the same figures used everywhere on this site. If you find a number on another page that disagrees with this table, this table is the one to trust.

    ProjectTypical rangeWhere the detail is
    Architect led custom home$500 to $800 per sq ftcost to build page
    High end custom or waterfront$800 to $1,200 and up per sq ftcost to build page
    Whole house remodel$300 to $550 per sq ftwhole house remodel page
    Home addition$350 to $650 per sq fthome addition cost page
    Detached ADU$200,000 to $400,000ADU design page
    Architecture feeFixed fee, about $10,000 to $200,000architect fees page

    Swipe the table sideways to see every column

    Eastside figures for 2026, covering construction. Land, site work and permits sit on top. The linked pages each carry an estimator that turns these into a number for your size and scope.

    How it runs

    The order things happen in

    The sequence rarely changes, and knowing it is most of what makes a project feel calm rather than chaotic.

    • Feasibility. What the lot, the zoning and the code will allow, and what that costs. This is where a bad site gets caught, before you have spent real money.
    • Schematic design. The plan and the massing, tested against the budget.
    • Design development and permit set. The drawings the city reviews and the builder bids from.
    • Permitting. Timelines vary by city and are listed on each city page.
    • Construction administration. Answering the questions that come up on site, which is where drawing errors get caught before they get built.

    Questions

    Residential work, answered

    Not answered here? Call David.

    Do I need an architect for a house in Washington?

    Not by law. RCW 18.08.410 exempts a residential building of up to four dwelling units from the architect stamp requirement, whatever its size. You will still need permitted drawings and usually structural engineering. People hire an architect because the lot, the code or the design is complicated, not because the law makes them.

    What does residential architecture cost?

    Piper Cole Architects quotes a fixed fee for design and permit, set by the project budget and location, from about $10,000 to $200,000 depending on scope. The first feasibility check is free and usually takes about a day; an in-depth analysis is $1,500.

    How long does a house take?

    Design and permitting usually run longer than people expect and construction usually runs about as long as they expect. Permit review alone is 6 to 22 weeks depending on the city and the project, and shoreline work adds roughly 3 to 6 months on top.

    Do you work outside Kirkland?

    Yes. The practice covers 19 cities across the Eastside, Seattle and south Snohomish County. Each city page lists that city’s permit authority and timelines.

    What happens on the first call?

    You describe the property and what you want to do. David replies to you personally. The first feasibility check is free and usually takes about a day.

    The services

    Pick the one that matches your project

    The numbers

    Cost pages, each with an estimator

    Where

    Cities covered

    Day 00001, Piper Cole Architects, Seattle Eastside WA

    Next step

    Tell me about the property

    Describe the lot and what you want to do with it. You speak to David Meade directly, and the first feasibility check is free and usually takes about a day.

    Free feasibility check

    Send the address and what you have in mind. David replies to you personally.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp