Residential architecture project by Piper Cole Architects, Seattle Eastside
  1. Home
  2. Locations
  3. Architect in Kenmore, WA

Kenmore, the north end of Lake Washington

Architect in Kenmore, WA

Custom homes, lakefront houses, additions and ADUs in Kenmore, at the north end of Lake Washington where the Sammamish River meets the lake.

The first feasibility check is free and usually takes about a day.

Free feasibility check

Send the address and what you have in mind. David replies within one business day with what the site and the code are likely to allow.

    What are you planning?
    Your details

    No obligation. Your details go to David only. See the privacy policy.

    • 1996Licensed architect since 1996
    • 1992AIA member since 1992
    • 20 to 30Projects designed each year
    • 3Masonry Excellence Awards
    • AIAAIA · NCARB · Washington licensed

    Why local matters

    Lake, trees and trail

    Kenmore sits at the top of Lake Washington, with Log Boom Park, the Burke-Gilman Trail and mature tree canopy through its neighborhoods.

    Housing runs from modest homes near SR-522 to elevated lots with lake and Cascade views, plus a small amount of highly valued lakefront.

    Permits go through the City of Kenmore, which contracts some review to King County. Lakefront work also needs shoreline review.

    What gets designed here

    Work in Kenmore

    Kenmore work falls into four kinds.

    • Custom homes. On larger lots at the north end of the city and on infill sites in established neighborhoods.
    • Lakefront homes. Less common than in Kirkland or Bellevue, and designed around shoreline setbacks from the start.
    • Additions. Mid century and later houses on generous lots, expanded rather than replaced.
    • ADUs. Garage conversions and backyard cottages, both allowed under state law.

    On the water

    On Lake Washington

    Lakefront lots at the north end of the lake need shoreline permit review in addition to the building permit.

    Setbacks and permit requirements are checked at feasibility, before design begins.

    Permits

    Kenmore permit timelines

    ProjectTypical review
    Residential addition6 to 10 weeks
    New single family home10 to 16 weeks
    ADU6 to 10 weeks

    Typical City of Kenmore review times for a complete application. Shoreline review runs in addition on lakefront lots.

    Budget

    What projects cost, in round numbers

    These are the same figures used everywhere on this site. The estimators on the linked pages turn them into a number for your size and scope.

    ProjectTypical rangeEstimator
    Architect led custom home$500 to $800 per sq ftcost to build page
    High end custom or waterfront$800 to $1,200 and up per sq ftcost to build page
    Whole house remodel$300 to $550 per sq ftwhole house remodel page
    Home addition$350 to $650 per sq fthome addition cost page
    Detached ADU$200,000 to $400,000ADU cost guide
    Architecture feeFixed fee, about ,000 to 0,000architect fees page

    Swipe the table sideways to see every column

    Eastside figures from the cost pages on this site, each of which has an estimator that gives you your own number. Land, site work and permits sit on top of construction.

    Where

    Kenmore neighborhoods

    Kenmore Village, the SR-522 corridor, the lakefront near Log Boom Park and the hillside neighborhoods above the lake.

    Questions

    Building in Kenmore, answered

    Not answered here? Call David, most calls are answered the same day.

    Do you work in Kenmore?

    Yes. Piper Cole Architects is based in Kirkland and Kenmore is part of the regular work. Lakefront homes, additions and ADUs are the most common projects.

    How long does a permit take in Kenmore?

    Allow 6 to 10 weeks for an addition or ADU and 10 to 16 weeks for a new house. Lakefront work adds shoreline review.

    What does an architect cost in Kenmore?

    Piper Cole Architects quotes a fixed fee for design and permit, set by the project budget and location, from about ,000 to 0,000 depending on scope. The first feasibility check is free and usually takes about a day; an in-depth analysis is ,500.

    Do I need an architect for a house in Washington?

    Not by law. RCW 18.08.410 exempts single family homes and buildings of four units or fewer from the stamp requirement. You will need permitted drawings and usually structural engineering. People hire an architect because the lot, the code or the design is complicated, not because the law requires one.

    What happens on the first call?

    You describe the property and what you want to do. David Meade tells you what the site and the code are likely to allow, what it tends to cost and what to check first. The first feasibility check is free and usually takes about a day.

    Plan the project

    Cost and service pages

    Read next

    Guides for Kenmore projects

    Nearby

    Nearby cities

    Our Architecture Services

    Full-service architecture for Kenmore Architect: Lakefront, Additions and ADUs and the greater Seattle area:

    Get a free feasibility check →

    Residential architecture project by Piper Cole Architects, Seattle Eastside

    Next step

    Talk about your Kenmore property

    Describe the lot and what you want to do with it. You speak to David Meade directly, and the first feasibility check is free and usually takes about a day.

    Free feasibility check

    Send the address and what you have in mind. David replies within one business day with what the site and the code are likely to allow.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp