David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
  1. Home
  2. Locations
  3. Architect in Newcastle, WA

Newcastle view homes and sloped lots

Architect in Newcastle, WA

View homes, custom houses on steep lots, renovations of 1990s and 2000s homes and ADUs in Newcastle, on the ridge between Bellevue and Renton.

The first feasibility check is free and usually takes about a day.

Free feasibility check

Send the address and what you have in mind. David replies to you personally.

    What are you planning?
    Your details

    No obligation. Your details go to David only. See the privacy policy.

    • 1996Licensed architect since 1996
    • 1992AIA member since 1992
    • 20 to 30Projects designed each year
    • 3Masonry Excellence Awards, commercial projects
    • AIAAIA · NCARB · Washington licensed

    Why local matters

    Built around the view and the slope

    Newcastle runs along a ridge from Coal Creek to the Renton Highlands. The western slope looks toward Lake Washington, the Seattle skyline and, from the best lots, the Olympics.

    Most lots are sloped, some steeply. Designs that use the grade, with split levels, daylight basements and a garage on a different floor from the living space, tend to cost less and live better than fighting it.

    Permits go through the City of Newcastle, a small city where a well prepared application usually moves efficiently.

    What gets designed here

    Work in Newcastle

    Newcastle work falls into three kinds.

    • View homes. Living spaces placed to take in the panorama, with roof lines that keep the view for the house behind.
    • Renovations. Many 1990s and 2000s homes have closed plans that block the view, dated kitchens and suites, and systems from before heat pumps.
    • ADUs. Larger lots, especially with a walkout lower level, suit a separate unit.

    Permits

    Newcastle permit timelines

    ProjectTypical review
    Residential addition6 to 10 weeks
    New single family home10 to 16 weeks
    ADU6 to 10 weeks

    Typical City of Newcastle review times for a complete application.

    Site constraints

    Designing on the slope

    Steep lots are the norm here, and they shape the whole project.

    • Grade decides where the garage, entry and main living floor can go.
    • Steep slopes usually need geotechnical input before the design is final.
    • Roof lines are drawn so the house behind keeps its view.

    Budget

    What projects cost, in round numbers

    These are the same figures used everywhere on this site. The estimators on the linked pages turn them into a number for your size and scope.

    ProjectTypical rangeEstimator
    Architect led custom home$500 to $800 per sq ftcost to build page
    High end custom or waterfront$800 to $1,200 and up per sq ftcost to build page
    Whole house remodel$300 to $550 per sq ftwhole house remodel page
    Home addition$350 to $650 per sq fthome addition cost page
    Detached ADU$200,000 to $400,000ADU cost guide
    Architecture feeFixed fee, about $10,000 to $200,000architect fees page

    Swipe the table sideways to see every column

    Eastside figures from the cost pages on this site, each of which has an estimator that gives you your own number. Land, site work and permits sit on top of construction.

    Where

    Newcastle neighborhoods

    The Coal Creek area to the north, the western slope facing the lake, and the neighborhoods toward the Renton Highlands to the south.

    Questions

    Building in Newcastle, answered

    Not answered here? Call David.

    Do you work in Newcastle?

    Yes. Piper Cole Architects is based in Kirkland and Newcastle is part of the regular work. View homes, sloped lot houses and renovations are the core of it.

    How long does a permit take in Newcastle?

    Allow 6 to 10 weeks for an addition or ADU and 10 to 16 weeks for a new house through the City of Newcastle.

    What does an architect cost in Newcastle?

    Piper Cole Architects quotes a fixed fee for design and permit, set by the project budget and location, from about $10,000 to $200,000 depending on scope. The first feasibility check is free and usually takes about a day; an in-depth analysis is $1,500.

    Do I need an architect for a house in Washington?

    Not by law. RCW 18.08.410 exempts single family homes and buildings of four units or fewer from the stamp requirement. You will need permitted drawings and usually structural engineering. People hire an architect because the lot, the code or the design is complicated, not because the law requires one.

    What happens on the first call?

    You describe the property and what you want to do. David replies to you personally. The first feasibility check is free and usually takes about a day.

    Plan the project

    Cost and service pages

    Read next

    Guides for Newcastle projects

    Nearby

    Nearby cities

    Our Architecture Services

    Full-service architecture for Newcastle Architect: View Homes, Sloped Lots and the greater Seattle area:

    Get a free feasibility check →

    David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA

    Next step

    Talk about your Newcastle property

    Describe the lot and what you want to do with it. You speak to David Meade directly, and the first feasibility check is free and usually takes about a day.

    Selected work

    Projects from the practice.

    See the full portfolio

    Free feasibility check

    Send the address and what you have in mind. David replies to you personally.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp