1. Home
  2. Blog
  3. Custom Homes and New Builds

Topic

Custom Homes and New Builds

Designing a new house on the Eastside: site selection, waterfront and sloped lots, budgets and build timelines.

Guides

Rendering of a three level cedar clad lakefront home at twilight with lit windows and covered deck
Custom Homes and New Builds

Custom home build estimate in Seattle: check what the lot allows before you price it

Asking builders what a custom home costs? See why the lot's rules come first, with a worked Seattle example, then request a free first feasibility check.

David Meade · November 5, 2026
Modern entry pavilion at twilight with cedar wall, tall glazing and stone landscaping
Custom Homes and New Builds

Hillside and view lots in Seattle: can you build on a steep slope, and what will the city ask for?

Buying or building on a steep slope or view lot in Seattle? See what the city's critical area rules ask for first. Request a free feasibility check.

David Meade · October 31, 2026
Bathroom with oak double vanity, black framed mirrors, brass sconces and freestanding tub
Custom Homes and New Builds

Bellevue teardown rebuild: what the lot allows before you commit

Planning a Bellevue teardown rebuild? See what the city's code lets the new house be, with the arithmetic shown, then request a free feasibility check.

David Meade · October 31, 2026
Oversized wood pivot entry door set in a stone wall under a covered porch
Custom Homes and New Builds

Mercer Island teardown and rebuild: check what the code lets the new house be

Planning a Mercer Island teardown and rebuild? See what the city's code lets the new house be, with the arithmetic, then request a free feasibility check.

David Meade · October 31, 2026
Primary bedroom with upholstered headboard, globe pendant and sliding doors to a lake view deck
Custom Homes and New Builds

Buying a lakefront lot on Lake Washington or Lake Sammamish: check what you can build before you close

Buying a lakefront lot on Lake Washington or Lake Sammamish? See what the shoreline code lets you build before you close. Request a free feasibility check.

David Meade · October 28, 2026
Contemporary two story house with stone column, metal panel siding, deck and lawn
Custom Homes and New Builds

Buying a house to tear down on the Eastside: check the lot before you close

Buying a house to tear down? See how Sammamish's code sizes the new house, with the arithmetic shown, then request the free first feasibility check.

David Meade · October 28, 2026
Tall window wall and French doors opening to a deck with cable rail and lake view
Custom Homes and New Builds

How to choose a waterfront home builder in Seattle and on the Eastside

How to choose a builder for a lakefront house in Seattle or on the Eastside: registration, bond, insurance, equal scope bids, contract and lien points.

David Meade · October 27, 2026
Midcentury house with cedar shake roof, long covered patio and flagstone courtyard with garden beds
Eastside and Seattle Local Guides

Custom home architect in Issaquah, WA

New home or teardown in Issaquah, WA? A Kirkland architect on lake and slope rules, review targets and a free feasibility check in about a day.

David Meade · October 21, 2026
Primary bedroom with upholstered headboard, globe pendant and sliding doors to a lake view deck
Eastside and Seattle Local Guides

Custom home architect on Mercer Island, WA

Custom home or teardown on Mercer Island? Kirkland architect: fixed design fee, the city's own rules, review targets, a free feasibility check in about a day.

David Meade · October 21, 2026
Tall window wall and French doors opening to a deck with cable rail and lake view
Eastside and Seattle Local Guides

Custom home architect in Redmond, WA

Custom home in Redmond, WA? The city caps a house at 4,500 sq ft, garage included. A Kirkland architect: fixed fee, free feasibility check in about a day.

David Meade · October 21, 2026
Contemporary two story house with stone column, metal panel siding, deck and lawn
Eastside and Seattle Local Guides

Custom home architect in Sammamish, WA

New custom home in Sammamish, on the Plateau or the lake? A Kirkland architect: fixed design fee, the city's rules, a free feasibility check in about a day.

David Meade · October 21, 2026
Primary bedroom with upholstered headboard, globe pendant and sliding doors to a lake view deck
Eastside and Seattle Local Guides

Waterfront home architect for Lake Sammamish

Four cities, four shoreline codes on one lake. Setbacks, limits on an old house and docks, from a Kirkland architect. Fixed fee, free feasibility check.

David Meade · October 21, 2026
Study with cedar ceiling, skylight, built-in bookshelves, stone fireplace edge and garden windows
Eastside and Seattle Local Guides

Gut renovation or rebuild: how to decide in Seattle and on the Eastside

Gut renovation or teardown and rebuild at $750,000 or more? What your city's code lets a gut keep, what a rebuild resets, and how to decide with facts.

David Meade · October 16, 2026
Gray midcentury house at dusk with lit entry, stone steps, boulders and new landscaping
Custom Homes and New Builds

Hiring an architect to tear down and rebuild in Seattle and on the Eastside

Tearing down and rebuilding? The architect’s first job is what your lot allows. Free feasibility check, about a day. Fixed fee for design and permit.

David Meade · October 8, 2026
Contemporary two story house with stone column, metal panel siding, deck and lawn
Custom Homes and New Builds

Getting a house demolished for a rebuild in Seattle and on the Eastside: permits, asbestos and the order of work

What it takes to demolish a house for a rebuild in Seattle and the Eastside: permit, asbestos notice, utilities, trees and the order that avoids an idle lot.

David Meade · October 7, 2026
View 8, Piper Cole Architects, Seattle Eastside WA
Custom Homes and New Builds

Home elevators in Washington: how to design one into a custom home

Planning a home elevator in a new custom home in Washington: who permits it (L&I or Seattle SDCI), ASME A17.1 rules, shaft, pit, drive types, cost drivers.

David Meade · September 27, 2026
Peck Residence rendering: modern two-story waterfront home with balcony and boat at dusk
Custom Homes and New Builds

Shoreline exemptions in Washington: building or remodeling a waterfront house without a substantial development permit

Building or remodeling a house on Lake Washington or the Sound? You likely need a written shoreline exemption, not a full permit. How it works in 2026.

David Meade · September 27, 2026
David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
Costs, Fees and Budgets

How do I finance a custom home build in Seattle or on the Eastside?

How construction-to-permanent loans, draws and land equity work, and what a lender needs from the design side before it will fund a custom home in Washington.

David Meade · September 26, 2026
Should I remodel my house or tear it down and rebuild?
Custom Homes and New Builds

Should I remodel my house or tear it down and rebuild?

Remodel at $300 to $550 a sq ft, add on at $350 to $650, or rebuild at $400 to $900? The code threshold that often decides it, and a scorecard for your house.

David Meade · September 26, 2026
Peck Residence rendering: modern two-story waterfront home with balcony and boat at dusk
Custom Homes and New Builds

What Seattle’s tree ordinance means for building a house

Seattle's tree code for new homes, teardowns and additions: tiers, Tier 2 removal, protection areas, permit plans and in-lieu fees, as of 2026.

David Meade · September 26, 2026
David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
Custom Homes and New Builds

What the 2021 Washington State Energy Code means for your new home

The 2021 Washington State Energy Code for a new Seattle or Eastside home: credits by size, heat pump vs gas, walls, windows, air testing and the EV circuit.

David Meade · September 26, 2026
David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
Custom Homes and New Builds

Lakefront home design on Lake Washington

Shoreline rules, buildable area and real cost per square foot for a Lake Washington home. Custom homes run $400 to $900 per sq ft.

David Meade · September 17, 2026
Aerial view of a contemporary custom home with wood-and-metal cladding near Seattle
Custom Homes and New Builds

Custom Home Architect in Seattle, WA

Custom home architect in Seattle, WA. From modern infill to view lots, Piper Cole Architects delivers full-service design. Architect since 1996, 20 to 30 projects a year.

David Meade · July 3, 2026
Waterfront home with floor-to-ceiling glass opening to a lake view and dock near Kirkland
Custom Homes and New Builds

Waterfront Architect in Kirkland, WA

Waterfront architect in Kirkland, WA. Piper Cole Architects designs lakefront homes and additions within shoreline regulations.

David Meade · July 2, 2026
Rustic-modern custom home with wood siding, stone entry and covered carport
Custom Homes and New Builds

Custom Home Architect in Kirkland, WA

Custom home architect in Kirkland, WA. Piper Cole Architects designs Northwest Contemporary and lakefront homes with local permit expertise.

David Meade · July 1, 2026
Kitchen with long granite island, striped bar stools and sliding doors to a lake view deck
Eastside and Seattle Local Guides

Custom home architect in Bellevue, WA

Building a new custom home in Bellevue, often a teardown? A Kirkland architect: fixed design fee, the city's own permit times, free one-day feasibility check.

David Meade · June 27, 2026
Contemporary luxury home with floor-to-ceiling glass and a backyard pool on the Seattle Eastside
Custom Homes and New Builds

Luxury Home Architect on Seattle’s Eastside

Estate residences in Medina, Clyde Hill, Hunts Point and Mercer Island. Waterfront and difficult sites. Principal led. Call David Meade direct.

David Meade · June 24, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Custom Homes and New Builds

Wood vs Steel vs ICF: Choosing a Structural System

Wood vs steel vs ICF: how to choose a structural system for your home, with pros, cons, and cost. Architect guidance from Piper Cole Architects.

David Meade · June 22, 2026
Multigenerational great room with stone fireplace and plank ceiling, open to kitchen and dining
Custom Homes and New Builds

Multigenerational Home Design in Seattle: Designing for Extended Family

Designing a Seattle home for multiple generations. In-law suites, dual primary suites, ADUs, and privacy strategies for extended family living.

David Meade · June 1, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Custom Homes and New Builds

Mass Timber Architecture in Seattle: CLT, Glulam, and the Case for Wood

Mass timber architecture in Seattle: CLT, glulam, structural performance, sustainability, and cost premium for homeowners and developers.

David Meade · May 30, 2026
Modern single-story home with a low-slope roof, warm-wood cladding and clean lines near Seattle
Custom Homes and New Builds

Modern Architecture Design Styles in Seattle: From Northwest Contemporary to Minimalist

Modern residential architecture styles in Seattle: Northwest Contemporary, Mid-Century Modern, Scandinavian, and Minimalist: how to choose what fits your.

David Meade · May 30, 2026
New white board-and-batten two-story custom home framed by evergreens near Seattle
Custom Homes and New Builds

What It Costs to Build a House in Seattle

Seattle build costs by tier and finish for 2026, the full budget beyond construction, and an estimator for your own house size. Call David on 425 753 6452.

David Meade · May 27, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Custom Homes and New Builds

Small Lot House Design in Seattle: Maximizing Every Square Foot

Building on a small lot in Seattle? Architects share strategies for maximizing space, using Seattle zoning rules, and creating homes that live large.

David Meade · May 27, 2026
Modern two-story custom home with wood and dark siding and a paver driveway, Seattle Eastside
Custom Homes and New Builds

How Long Does It Take to Build a Custom Home in Seattle? A Complete Timeline

How long to build a custom home in Seattle? Phase-by-phase timeline from design through move-in. Realistic 2026 estimates by Piper Cole Architects.

David Meade · May 25, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Custom Homes and New Builds

Form vs. Function in Architecture: How Great Design Balances Both

Form vs. function in architecture: how the best buildings achieve both simultaneously.

David Meade · May 25, 2026
Sunlit corner living room with fireplace, oak floor and windows facing the lake
Custom Homes and New Builds

Waterfront home architect in Seattle: what the shoreline rules let you build

Planning a Seattle waterfront house? See what the 2015 shoreline program allows, with the arithmetic on one lake lot. Ask David for a free feasibility check.

David Meade · May 25, 2026
Modern entry foyer with wood pivot door, stone accent wall and glass surround near Seattle
Custom Homes and New Builds

What Is a Foyer? Entry Design Ideas for Seattle Homes

What is a foyer and how should it be designed for Seattle homes? Entry design ideas, sizing, and storage solutions from Piper Cole Architects.

David Meade · May 25, 2026
Aerial view of a modern Seattle-area home with flat roofs, warm-wood accents and landscaping
Custom Homes and New Builds

Modern Home Architecture Trends in Seattle for 2026

Modern home architecture trends in Seattle for 2026: the materials, forms, and features shaping new homes, from Piper Cole Architects.

David Meade · May 22, 2026
Cedar and glass house at dusk, designed by Piper Cole Architects

Next step

Have a project in mind?

Call David Meade directly. The first feasibility check is free and usually takes about a day.

Free feasibility check

Send the address and what you have in mind. David replies to you personally.

    What are you planning?
    Your details

    No obligation. Your details go to David only. See the privacy policy.

    Chat with David on WhatsApp