Custom Home Architect in Issaquah, WA: Fixed Fee

By David Meade, AIA, NCARBOctober 21, 202616 min read

On this page

    Home / Resources / Issaquah custom homes

    Issaquah custom homes

    Custom home architect in Issaquah, WA

    What Issaquah’s code lets a new house be, what a teardown does to the old one, what Lake Sammamish and a steep slope take off the lot, and what to ask any architect before you sign.

    By David Meade, Principal ArchitectUpdated 20 October 202611 min read

    Key takeaways

    • Issaquah’s single family zones have no floor area cap. A 30 foot height limit, the yards, a cap on roofed and paved area (30, 40 or 50 percent of the lot) and street facade design standards set the house. On a 12,000 sq ft SF-S lot the cap is 4,800 sq ft.
    • If the old house is demolished, a new one must meet today’s code (IMC 18.214.050). On the lake, the city may allow a different nonconforming location if it finds less shoreline impact.
    • A new lake house sits landward of a 35 foot buffer plus a 15 foot setback, 50 feet from the high water mark. Near a slope of 40 percent or more, 65 feet from the top or toe (25 with a study).
    • The city’s target for a first review of a single family permit is 4 weeks, then 3, then 1. I found no report of actual times.
    • My fee is fixed, about $10,000 to $200,000, set by budget and location. The first feasibility check is free and takes about a day.

    Short answer: Piper Cole Architects is based in Kirkland, and I design new custom homes in Issaquah, including teardowns, Lake Sammamish lots and hillside sites, for a fixed fee of about $10,000 to $200,000, set by the project budget and location. The first feasibility check is free and takes about a day. Before you pay for drawings, an architect should say what the code lets a new house be on your lot, what happens to the old house, and what a lake or slope takes off the buildable ground.

    This page is for an owner planning a new house with a budget of roughly $2,000,000 to $6,000,000. Piper Cole designs and administers construction on your behalf and does not build. The rules come from the city’s adopted Title 18 ordinances, its May 2025 Shoreline Master Program, its permit pages and Washington law, read on 20 October 2026. The city’s code site blocks automated reading, so I read the adopting ordinances and the city’s list of ordinances through 3155 (12 October 2026). I found no later ordinance that changes the sections I use, other than the ones named here. Confirm with the city. For an existing house, see my remodel page.

    What Issaquah’s code lets a new house be

    These are City of Issaquah rules (IMC Table 18.404.090(A), restated by Ordinance 3088, and 18.404.030 to .070). My Issaquah zoning guide has the full table and the Highlands and Talus rules.

    RuleWhat the code saysWhat it does to a new house
    Floor areaNo floor area ratio is listed for SF-E, SF-S or SF-SL. A ratio applies in some zones in Central Issaquah, Talus and the Highlands.Yards, height and roofed and paved area set the size.
    YardsSF-S: front 20 feet, side 8, rear 10. SF-E: 30, 15, 30. SF-SL: 10, 6, 20.Critical areas and the shoreline add setbacks.
    Impervious surfaceMaximum 30 percent in SF-E, 40 in SF-S, 50 in SF-SL: footprint, driveway, walks, decks, patios, porches and pools.The cap usually binds before the yards. A constrained site may not reach it.
    HeightBase height 30 feet, from average grade (spot elevations every 10 feet around the footprint) to the midpoint of the highest gable on a 4:12 to 12:12 roof, or a flat roof’s coping.On shoreline lots, from the average existing topography under the building. On hillsides, from existing grade with no averaging.

    A worked lot. Take an SF-S lot 80 by 150 feet, 12,000 sq ft. The building zone is 64 feet wide (80 minus two 8 foot side yards) and 120 deep (150 minus 20 and 10), or 7,680 sq ft. The impervious cap is 4,800 sq ft (12,000 x 0.40). A 2,600 sq ft footprint leaves 2,200 sq ft (4,800 minus 2,600) for the driveway, walks, terraces and any pool. The cap decides how much house goes on that lot; more floor area means more levels inside 30 feet.

    Design standards. Since Ordinance 3091 (effective 27 May 2025), a new single family house outside Olde Town, the Highlands and Talus also meets IMC 18.602.090. A building more than 30 feet wide must use both a change in plane (4 feet deep and 8 feet wide, on every story) and a porch or entry feature along any street facade. The section also sets entry, garage and driveway standards, so I check it before I draw the front.

    A teardown: what happens to the old house

    Demolition permit (City). The city’s page says the permit is required to demolish the whole or part of any permanent structure and that demolition may be subject to SEPA review. You apply online, fees follow project valuation, and the minimum forms include the Puget Sound Clean Air Notice of Intent. The city’s demolition checklist (updated February 2026) also asks for an asbestos survey by an AHERA-certified inspector. See my demolition permit guide.

    What the new house must meet. IMC 18.214.050 says that if a structure is demolished, any new site, structure or use must be brought into conformance with all applicable requirements. So I draw inside today’s envelope and plan as if the old setbacks are gone. The path that keeps a nonconforming position covers damage by accident or an act of nature (IMC 18.214.060). A voluntary teardown is not that.

    On the lake. The Shoreline Master Program (SMP) adds two rules. After fire or another involuntary loss, a nonconforming structure may be rebuilt to its prior footprint, not farther waterward, if a complete application comes within 24 months. A different nonconforming location may be allowed if the city finds less impact on shoreline functions (SMP 8.6.2). The SMP says IMC 18.214 applies as well, so ask the city in writing which governs a voluntary teardown.

    Rendering of a white board and batten cottage with wraparound upper deck and round window at dusk
    Rendering, Piper Cole Architects. A board and batten house with a wraparound upper deck, a round window and a lower level that opens to a patio.

    If the old house may be worth keeping, see remodel or tear down.

    Planning a teardown and rebuild in Issaquah?

    Lake Sammamish lots: the shoreline program

    The SMP applies to Lake Sammamish inside the city limits and reaches 200 feet landward of the ordinary high water mark (OHWM). It sits on top of zoning, and the more restrictive rule prevails. I read the city’s consolidated May 2025 program, which is Ordinance 3021 as amended by Ordinance 3089 (Ecology says effective 26 May 2025). Docks need state and federal approvals.

    RuleWhat the program saysWhat it does to a new house
    Buffer and setbackA 35 foot vegetated buffer from the OHWM plus a 15 foot building setback. The standard OHWM elevation is 31.76 feet (NAVD88); a biologist may set it in the field.The house and all paving sit landward of both unless you win a shoreline variance: 50 feet from the OHWM.
    Buffer plantingNew residential development plants 80 percent of the buffer with native woody species. An active use area is capped at 400 sq ft. Existing impervious area leaves the buffer.An old patio at the water’s edge does not carry over.
    BulkheadsNew residential development removes hard shoreline stabilization and replaces it with bioengineered stabilization unless a professional’s assessment is accepted by the city.Assess the bulkhead early.
    HeightThe program’s table lists 35 feet; the zone says 30. The program and state law (RCW 90.58.320) bar a shoreline permit above 35 feet that blocks the view of a substantial number of residences, except by variance.I draw to 30 feet unless the city confirms otherwise.

    A worked lake lot. Take an SF-S lot 70 by 160 feet from street to OHWM, 11,200 sq ft (assuming all counts). Take off the 20 foot front yard and the 50 foot buffer plus setback: 90 feet deep. Two 8 foot side yards leave 54 feet, or 4,860 sq ft (90 x 54). The impervious cap is 4,480 sq ft (11,200 x 0.40). The buffer is 2,450 sq ft (35 x 70); 20 percent of it is 490, so the 400 sq ft cap on the active use area binds.

    The state exemption. A single family house built by the owner for the owner’s use, up to 35 feet above average grade and landward of the OHWM, is usually exempt from the state shoreline substantial development permit (WAC 173-27-040(2)(g)). That is not an exemption from the program (WAC 173-27-040(1)). A design that needs a variance goes the longer way, and Ecology must approve a variance (RCW 90.58.140(10)). See my shoreline exemption guide.

    Flood zones. In a mapped flood hazard area the city requires a flood hazard permit and a surveyor’s elevation certificate. In Zone AE areas the lowest habitable floor sits at least a foot above the 100 year flood elevation, and no fully enclosed space below grade is allowed, basements included. Ask if your parcel is mapped.

    Steep slopes, soils and trees

    Slopes (City). On a slope of 40 percent or more, IMC 18.802.130 sets a 50 foot buffer from the top and toe. A critical areas study can cut it to 10 feet, but an occupied building must stay at least 25 feet from the top or toe, and a 15 foot building setback runs from the buffer’s outer edge (IMC 18.802.450). A standard buffer puts the house 65 feet out (50 plus 15); a reduced one, 25 feet (10 plus 15). The house cannot sit on the slope itself: the code allows only stormwater conveyance, trails, utilities and view trimming there, unless the slope is exempt, which a slope of 40 percent or more with up to 20 feet of vertical change may be (IMC 18.802.180).

    Hillsides in between (City). Where work disturbs slopes of 15 percent or more with 10 feet of rise, the forested hillside chapter bars mass regrading for a flat pad and limits cut, fill and retaining walls to 10 feet (IMC 18.810.090 and .100). Unmapped critical areas are still protected, and the owner must verify them (IMC 18.802.020).

    Trees (City). Ordinance 3114 changed the tree code effective 14 October 2025. For new development, a residential lot keeps 35 percent of the total caliper of its significant trees (6 inches or more at breast height, 8 for alder and cottonwood) in the developable site area (IMC 18.812.070): trees of 14, 18, 22, 26 and 30 inches total 110 inches, so keeping 38.5 meets it. Trees rated poor or hazardous do not count, and construction stays 5 feet outside a protected tree’s drip line. Most removals need a tree permit and a replacement tree.

    Who decides what, and how long the city says review takes

    WhoWhat they decide on a new house
    City of IssaquahZoning, impervious cap, height, critical areas, the SMP, trees, and the demolition, building and flood hazard permits.
    King CountyA sewer use certification form and septic approval where they apply. Outside city limits, zoning and permits too (RA-5 is King County rural zoning).
    State of WashingtonThe 35 foot shoreline rule and exemption, Ecology’s approval of variances, the state energy code, and vesting: a fully complete building permit application is reviewed under the zoning in effect on the filing date (RCW 19.27.095).

    Applications go through MyBuildingPermit.com. The city’s new construction page lists soils report requirements and water, sewer and energy forms. Its checklist, last revised August 2023, adds a geotechnical report, a stormwater report and stamped structural calculations.

    Permit typeFirst reviewSecond reviewThird and later
    Single family residential building permit4 weeks3 weeks1 week
    Shoreline exemption3 weeks2 weeks1 week
    Shoreline permit (substantial development, variance, conditional use)5 weeks4 weeks2 weeks
    Tree permit2 weeks1 week1 week

    Source: City of Issaquah, Target Review Times handout (“Last Updated: April 2026”), read on 20 October 2026. The clock starts when permit fees are paid. The two shoreline rows add a 2 week final decision step.

    Three rounds on the building row come to 8 weeks (4 + 3 + 1), before the days you spend answering comments. I found no city report of how long completed permits took. For planning I use permitting of 3 to 6 months for a custom home, longer with a shoreline variance or a slope study. I could not open the city’s fee estimator or impact fee table, so I give no fee totals; ask the city for an estimate in writing.

    What it costs and what changes the schedule

    ItemPlanning figureWhat moves it
    Design and permit feeFixed fee, about $10,000 to $200,000Project budget and location. The agreed scope is the scope the fee covers.
    New custom home construction$400 to $900 per sq ftSite, structure, finish level, slope, water.
    DemolitionTypically $20,000 to $50,000House size, the asbestos survey, access.

    Planning ranges, not quotes. Per square foot is construction only.

    On the worked lot, a 2,600 sq ft footprint on two levels is 5,200 sq ft of floor, or $2,080,000 to $4,680,000 at $400 to $900 per sq ft (5,200 x $400 and x $900), before demolition. A surveyor, a geotechnical engineer, an arborist and, near water, a biologist are separate; I will say which your lot needs.

    You can hire an architect and a builder separately, with the architect administering construction for you, or hire one company to design and build. I work in the first.

    What to ask any architect before you sign

    1. Which limit binds first on my lot: the yards, the impervious cap, the height or a buffer?
    2. What happens to the old house’s position in a teardown, and where does the code say so?
    3. Does my lot touch the shoreline, a flood zone or a steep slope?
    4. How long does the city say review takes, and what do you assume on top?
    5. Is the fee fixed, or a percentage of construction cost, and what sits outside it?
    6. Do you administer construction, and do you build? I administer for you and do not build.
    7. When do I get a straight answer on whether the house fits the lot and budget? Mine is the free check.

    How the work runs, in order

    StepTypical time
    Free feasibility check: does the house fit the lot, code and budget at a basic levelAbout a day
    In-depth analysis, if wanted: zoning, critical areas and budget in more depth$1,500, 2 to 3 weeks
    Design to permit submission: drawings, engineering and the permit setTypically 2 to 4 months
    City review: approvals, comments and an issued permitSee the table above
    Demolition and construction: bids, then my administrationSet by scope and builder

    I have worked as an architect since 1996, I am an AIA member since 1992 and an NCARB member since 1996, and I take on 20 to 30 projects a year. The Carr residence was featured in Above The Lake and Lux magazines. My construction loan guide covers financing.

    Before you buy or design

    Find out what your Issaquah lot will carry

    Send me the address and the year the house was built. The first feasibility check is free and takes about a day.

    Questions

    How much does a custom home architect cost in Issaquah?
    I quote a fixed fee for design and permit, set by the project budget and location, typically about $10,000 to $200,000 depending on scope. The first feasibility check is free and takes about a day. An in-depth analysis is $1,500 and takes 2 to 3 weeks. City permit fees and consultants are separate. Ask any firm whether its fee is fixed or a percentage of construction cost, and what sits inside it.
    Do I need an architect to build a custom home in Issaquah?
    Not by law. RCW 18.08.410(5) exempts design work for a residential building of up to and including four dwelling units from the architect licensing requirement. The city does require drawings and reports: its checklist asks for a geotechnical report, a stormwater report and stamped structural calculations, plus a critical area study where needed. An architect prepares the drawings, coordinates the engineers and surveyor, and answers the city’s comments.
    How big a house can I build on my Issaquah lot?
    Issaquah’s residential table lists no floor area cap for SF-E, SF-S or SF-SL. The limits are the yards, a 30 foot base height and a cap on impervious surface of 30, 40 or 50 percent of the lot. On a 12,000 square foot SF-S lot the cap is 4,800 square feet of footprint, driveway, walks, patios and pools together. Critical areas, the shoreline and trees can reduce the buildable ground further. Source: IMC Table 18.404.090(A) and 18.404.040, as of October 2026.
    How close to Lake Sammamish can I build in Issaquah?
    Under the city’s Shoreline Master Program, a new house and its paving sit landward of a 35 foot buffer plus a 15 foot building setback, so 50 feet from the ordinary high water mark, unless the city approves a shoreline variance. The standard high water elevation is 31.76 feet (NAVD88), or a biologist can set it in the field. The buffer is 35 feet wide and 80 percent of it is replanted with native species. Confirm with the city.
    Can I tear down my Issaquah house and rebuild on the same footprint?
    Only if the footprint meets today’s rules. IMC 18.214.050 says that if a structure is demolished, any new structure must be brought into conformance with the code. A nonconforming single family house damaged by accident or an act of nature may be reconstructed, without more nonconformity, if complete applications come within a year (IMC 18.214.060). On Lake Sammamish the shoreline program lets the city allow a different nonconforming location if it finds less impact. Ask the city in writing.
    Can I build on a steep slope in Issaquah?
    Near a steep slope, yes, with limits. On it, generally no. A slope of 40 percent or steeper has a 50 foot buffer from the top and toe, which a critical areas study can reduce to 10 feet, but an occupied building must stay at least 25 feet from the top or toe, plus a 15 foot setback from the buffer edge. Ground disturbance on slopes of 15 percent or more with 10 feet of rise also falls under the forested hillside rules, which limit cuts, fills and retaining walls to 10 feet.
    How long does Issaquah take to permit a new house?
    The city’s Target Review Times handout (last updated April 2026) targets 4 weeks for a first review of a single family permit, 3 weeks for a second and 1 week for later rounds. The clock starts when permit fees are paid, and each figure is one round. I found no city report of how long completed permits took. For planning I use permitting of 3 to 6 months for a custom home, longer with a shoreline variance or a slope study.
    Do I have to keep trees when I build a new house in Issaquah?
    Yes, in part. For new development, a residential lot keeps 35 percent of the total diameter of its significant trees (6 inches or more at breast height, 8 for alder and cottonwood) in the developable site area, and trees rated poor or hazardous do not count. Construction stays 5 feet outside a protected tree’s drip line. Most removals need a tree permit and replacement of at least one tree for each one removed. Source: IMC 18.812 as amended by Ordinance 3114, effective 14 October 2025.
    Does Piper Cole build the house?
    No. Piper Cole designs the house and administers construction on your behalf, and it does not build. You contract with the builder, and I work for you during construction.
    David Meade, AIA, NCARB
    Principal Architect, Piper Cole Architects · Kirkland, WA

    David Meade is a licensed architect (AIA, NCARB) who has worked as an architect since 1996, with three Masonry Excellence Awards for commercial projects. Learn more about David →

    Talk to the architect

    Have a project in mind?

    Call David Meade directly. Licensed architect serving Kirkland, Bellevue, Seattle and the wider Eastside. David Meade has been an architect since 1996.

    Free feasibility check

    Send the address and what you have in mind. David replies within one business day with what the site and the code are likely to allow.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp