1. Home
  2. Blog
  3. Eastside and Seattle Local Guides

Topic

Eastside and Seattle Local Guides

City-by-city guidance for homeowners in Kirkland, Bellevue, Seattle, Redmond, Sammamish and the wider Eastside.

Guides

Bathroom with oak double vanity, black framed mirrors, brass sconces and freestanding tub
Remodeling and Renovation

How to compare contractor bids from architect drawings in Seattle and the Eastside

How to compare contractor bids on one set of drawings: bid types, bid leveling, Washington L&I checks, contract points and what the architect does.

David Meade · November 9, 2026
Midcentury house with cedar shake roof, long covered patio and flagstone courtyard with garden beds
Permits, Zoning and Code

Land survey and geotechnical report before design: what Seattle and Eastside cities ask for

Which survey and geotechnical report Seattle and Eastside cities ask for before design, who may prepare each in Washington, and the order that saves rework.

David Meade · November 9, 2026
Peck Residence rendering: modern two-story waterfront home with balcony and boat at dusk
Working With an Architect

Redmond architect: what the city lets your house be

Choosing a Redmond architect? See the city's size cap, yards, height and permit rules worked on one lot, then ask for a free basic feasibility check.

David Meade · November 9, 2026
Primary bedroom with upholstered headboard, globe pendant and sliding doors to a lake view deck
Working With an Architect

Sammamish and Issaquah architect: find out what your lot allows before you design

Remodeling, adding to or building in Sammamish or Issaquah? See each city's own rules, one lot worked line by line, then request a free first check.

David Meade · November 9, 2026
Seattle LR1, LR2 and LR3 zoning: what you can build and what it means for your house
Permits, Zoning and Code

Seattle LR1, LR2 and LR3 zoning: what you can build and what it means for your house

What Seattle's LR1, LR2 and LR3 lowrise zones allow since January 21, 2026: height, floor area ratio, setbacks and MHA, with a worked lot. Read 9 Nov 2026.

David Meade · November 9, 2026
Study with cedar ceiling, skylight, built-in bookshelves, stone fireplace edge and garden windows
Permits, Zoning and Code

Seattle plan review corrections: how to respond to a correction notice

How a Seattle permit correction notice works and how to answer each plan review comment, with the review times SDCI prints and who does what.

David Meade · November 9, 2026
Remodeled split level house with white siding, stone base, black windows and modern garage door
Working With an Architect

Second story addition contractor in Seattle: what has to be settled before anyone can price it

Calling second story addition contractors? See what Seattle's rules and the old structure settle before anyone can price it, then request a free first check.

David Meade · November 9, 2026
Cabin 2, Piper Cole Architects, Seattle Eastside WA
Permits, Zoning and Code

Septic system and well for a new home on a rural King County lot: what to settle before the house is designed

What to settle about septic, water and bedroom count before a house is designed on an unsewered King County lot, the order of steps, and who does each one.

David Meade · November 9, 2026
Kitchen with long granite island, striped bar stools and sliding doors to a lake view deck
Working With an Architect

Whole house remodel contractor quote in Seattle: define the scope before you compare

Comparing whole house remodel quotes in Seattle? See why quotes differ and how SDCI's 60 percent signal can change scope. Request a free check.

David Meade · November 9, 2026
Cabin 1, Piper Cole Architects, Seattle Eastside WA
Working With an Architect

Woodinville and Maple Valley architect: find out what your lot allows before you design

Woodinville and Maple Valley architect: how each city's rules, trees and septic review bear on a lot, with a worked Woodinville example. Free first check.

David Meade · November 9, 2026
Rendering of a craftsman style one story house with gabled porch, stone base and walkway
ADUs, DADUs and Backyard Cottages

Backyard cottage in Seattle or on the Eastside: can your lot take an ADU?

Check what your lot allows before you build an ADU: Seattle's 2026 rules with a worked lot, plus Kirkland, Bellevue and Sammamish. Request a free first check.

David Meade · November 5, 2026
Rendering of a three story modern home with glass rail decks and stone patio at dusk
Working With an Architect

Bellevue home architect: what your lot allows before you design

Choosing a Bellevue home architect? See what the city's code lets your lot carry, with the arithmetic shown, then request a free first feasibility check.

David Meade · November 5, 2026
Copper chimney cap on a stacked stone chimney framed by pine branches
Working With an Architect

Bothell architect: what the city lets your house be

Choosing a Bothell architect? See the city's yards, hard surface, height and permit rules worked on one lot, then ask for a free basic feasibility check.

David Meade · November 5, 2026
Rendering of a three level cedar clad lakefront home at twilight with lit windows and covered deck
Custom Homes and New Builds

Custom home build estimate in Seattle: check what the lot allows before you price it

Asking builders what a custom home costs? See why the lot's rules come first, with a worked Seattle example, then request a free first feasibility check.

David Meade · November 5, 2026
Bathroom with floating cherry double vanity, white stone counter and clerestory windows
Working With an Architect

Kirkland architect: what the city lets your house be

Choosing a Kirkland architect? See the city's rules on yards, floor area, coverage and permits worked on one lot, then ask for a free basic feasibility check.

David Meade · November 5, 2026
White kitchen with charcoal island, brass pendants and light oak plank floor
Working With an Architect

Lake Forest Park and Kenmore home architect: find out what your lot allows before you design

Remodeling, adding to or building in Lake Forest Park or Kenmore? See what each city's rules allow, with the arithmetic, then request a free first check.

David Meade · November 5, 2026
Kitchen with long granite island, striped bar stools and sliding doors to a lake view deck
Working With an Architect

Medina, Clyde Hill, Hunts Point and Yarrow Point architect: find out what your lot allows first

Remodel or new house in Medina, Clyde Hill, Hunts Point or Yarrow Point? See what each town's code decides, then request a free first check.

David Meade · November 5, 2026
Rendering of a modern two story waterfront home at dusk with glass walls, deck and boat at the shore
Working With an Architect

Mercer Island home architect: find out what your lot allows before you design

Planning a Mercer Island remodel, addition or new house? See what the city's code allows, with the arithmetic, then request a free first feasibility check.

David Meade · November 5, 2026
Kitchen with cherry cabinets, marble counters, island seating, skylight and slate floor
Working With an Architect

Newcastle and Renton home addition and remodel architect: check what each city allows first

Adding on or remodeling in Newcastle or Renton, WA? See what each city's code decides, with one worked lot, then request a free first feasibility check.

David Meade · November 5, 2026
Study with cedar ceiling, skylight, built-in bookshelves, stone fireplace edge and garden windows
Working With an Architect

Snoqualmie and North Bend home architect: find out what your lot allows before you design

Remodel, addition or new house in Snoqualmie or North Bend? See what each city's rules decide, with arithmetic, then request a free first feasibility check.

David Meade · November 5, 2026
Modern entry pavilion at twilight with cedar wall, tall glazing and stone landscaping
Custom Homes and New Builds

Hillside and view lots in Seattle: can you build on a steep slope, and what will the city ask for?

Buying or building on a steep slope or view lot in Seattle? See what the city's critical area rules ask for first. Request a free feasibility check.

David Meade · October 31, 2026
Great room seen over a geometric wood and metal stair railing with chandelier and fireplace
Remodeling and Renovation

Second story addition and whole house remodel on the Seattle Eastside

Planning a second story addition and whole house remodel in Seattle or on the Eastside? Free first feasibility check from David Meade, Kirkland architect.

David Meade · October 31, 2026
Bathroom with oak double vanity, black framed mirrors, brass sconces and freestanding tub
Custom Homes and New Builds

Bellevue teardown rebuild: what the lot allows before you commit

Planning a Bellevue teardown rebuild? See what the city's code lets the new house be, with the arithmetic shown, then request a free feasibility check.

David Meade · October 31, 2026
Oversized wood pivot entry door set in a stone wall under a covered porch
Custom Homes and New Builds

Mercer Island teardown and rebuild: check what the code lets the new house be

Planning a Mercer Island teardown and rebuild? See what the city's code lets the new house be, with the arithmetic, then request a free feasibility check.

David Meade · October 31, 2026
Bathroom with floating cherry double vanity, white stone counter and clerestory windows
Remodeling and Renovation

Buying a house to remodel in Seattle or on the Eastside: check what you can change before you close

Buying a house to remodel in Seattle or on the Eastside? See what each city's code lets you change before you close. Request a free feasibility check.

David Meade · October 31, 2026
Living room with wood-clad see-through fireplace and floor-to-ceiling windows facing the lake
Permits, Zoning and Code

Dock and bulkhead permits on Lake Washington and Lake Sammamish

Dock and bulkhead permits on Lake Washington and Lake Sammamish: the $28,000 and $13,900 state lines, city rules, Fish and Wildlife, Corps. Free first check.

David Meade · October 30, 2026
Remodeled split level house with white siding, stone base, black windows and modern garage door
Remodeling and Renovation

As built drawings and existing conditions before a remodel in Seattle and on the Eastside

As built drawings, existing conditions and surveys for a Seattle or Eastside remodel, from each city's own checklist. Ask David about a free first check.

David Meade · October 30, 2026
Midcentury house with cedar shake roof, long covered patio and flagstone courtyard with garden beds
Working With an Architect

Architect feasibility study for your lot in Seattle and on the Eastside

Find out what you can build on your lot before you buy or design. Free first feasibility check from David Meade, Kirkland architect. Send me the address.

David Meade · October 28, 2026
Primary bedroom with upholstered headboard, globe pendant and sliding doors to a lake view deck
Custom Homes and New Builds

Buying a lakefront lot on Lake Washington or Lake Sammamish: check what you can build before you close

Buying a lakefront lot on Lake Washington or Lake Sammamish? See what the shoreline code lets you build before you close. Request a free feasibility check.

David Meade · October 28, 2026
Contemporary two story house with stone column, metal panel siding, deck and lawn
Custom Homes and New Builds

Buying a house to tear down on the Eastside: check the lot before you close

Buying a house to tear down? See how Sammamish's code sizes the new house, with the arithmetic shown, then request the free first feasibility check.

David Meade · October 28, 2026
Frameless glass walk-in shower with marble walls, pebble floor, teak bench and skylight
Permits, Zoning and Code

Seattle's PACT permitting reform: what it changes for a remodel permit

Seattle PACT is a mayor's executive order, not an ordinance. What it set, what SDCI now publishes, what the code still says, and what to plan for a remodel.

David Meade · October 27, 2026
Modern entry pavilion at twilight with cedar wall, tall glazing and stone landscaping
Eastside and Seattle Local Guides

Bothell, Washington zoning and building permits: what you can build on your lot in 2026

Bothell, Washington zoning for homeowners: 35 foot height, 5 foot side yards, hard surface limits, slopes, trees, shoreline and permit fees.

David Meade · October 21, 2026
Midcentury house with cedar shake roof, long covered patio and flagstone courtyard with garden beds
Eastside and Seattle Local Guides

Custom home architect in Issaquah, WA

New home or teardown in Issaquah, WA? A Kirkland architect on lake and slope rules, review targets and a free feasibility check in about a day.

David Meade · October 21, 2026
Primary bedroom with upholstered headboard, globe pendant and sliding doors to a lake view deck
Eastside and Seattle Local Guides

Custom home architect on Mercer Island, WA

Custom home or teardown on Mercer Island? Kirkland architect: fixed design fee, the city's own rules, review targets, a free feasibility check in about a day.

David Meade · October 21, 2026
Tall window wall and French doors opening to a deck with cable rail and lake view
Eastside and Seattle Local Guides

Custom home architect in Redmond, WA

Custom home in Redmond, WA? The city caps a house at 4,500 sq ft, garage included. A Kirkland architect: fixed fee, free feasibility check in about a day.

David Meade · October 21, 2026
Contemporary two story house with stone column, metal panel siding, deck and lawn
Eastside and Seattle Local Guides

Custom home architect in Sammamish, WA

New custom home in Sammamish, on the Plateau or the lake? A Kirkland architect: fixed design fee, the city's rules, a free feasibility check in about a day.

David Meade · October 21, 2026
Primary bedroom with upholstered headboard, globe pendant and sliding doors to a lake view deck
Eastside and Seattle Local Guides

Waterfront home architect for Lake Sammamish

Four cities, four shoreline codes on one lake. Setbacks, limits on an old house and docks, from a Kirkland architect. Fixed fee, free feasibility check.

David Meade · October 21, 2026
Primary bath with glass steam shower, soaking tub and tall windows
Eastside and Seattle Local Guides

Whole house remodel architect in Woodinville, WA

Remodeling a Woodinville house for $750,000 or more? A fixed design fee, a free feasibility check in about a day and the city's own rules on walls and review.

David Meade · October 21, 2026
Remodeled split level house with white siding, stone base, black windows and modern garage door
Eastside and Seattle Local Guides

Kenmore, Washington zoning and building permits: what you can build on your lot in 2026

Kenmore, Washington zoning for homeowners: R-4 and R-6 yards, 35 foot height, impervious limits, Lake Washington shoreline buffer, trees and permits.

David Meade · October 16, 2026
Modern entry pavilion at twilight with cedar wall, tall glazing and stone landscaping
Eastside and Seattle Local Guides

Lake Forest Park zoning and building permits: what you can build on your lot in 2026

Lake Forest Park zoning for homeowners: RS zones, 30 foot height, coverage caps, steep slopes, tree permits, Lake Washington shoreline and permit times.

David Meade · October 16, 2026
Midcentury house with cedar shake roof, long covered patio and flagstone courtyard with garden beds
Eastside and Seattle Local Guides

Mercer Island zoning explained: what your lot allows

Mercer Island zoning in plain English: the four zones, setbacks, floor area, height, lot coverage and Lake Washington rules, with a worked R-15 example.

David Meade · October 16, 2026
Study with cedar ceiling, skylight, built-in bookshelves, stone fireplace edge and garden windows
Eastside and Seattle Local Guides

Newcastle, Washington zoning and building permits: what you can build on your lot in 2026

Newcastle, Washington zoning for homeowners: R-4 and R-6 yards, 30 foot height, coverage, steep slope, coal mine and stream buffers, trees, ADUs and permits.

David Meade · October 16, 2026
Great room seen over a geometric wood and metal stair railing with chandelier and fireplace
Eastside and Seattle Local Guides

Whole house remodel architect in Clyde Hill, Washington

Remodeling in Clyde Hill for $750,000 or more? The city's $493,000 substantial remodel line, 1953 grade height rule, a fixed fee and a free one-day check.

David Meade · October 16, 2026
Tall window wall and French doors opening to a deck with cable rail and lake view
Eastside and Seattle Local Guides

Whole house remodel architect in Issaquah, WA

Remodeling an Issaquah house for $750,000 or more? A fixed design fee, a free one-day feasibility check and the city's own code and review times.

David Meade · October 16, 2026
Flagstone entry courtyard with pruned pines leading to wood French doors and glass entry hall
Eastside and Seattle Local Guides

Woodinville zoning and building permits: what you can build on your lot in 2026

Woodinville zoning for homeowners: R-1 to R-8 yards, 35 foot height, roof coverage, creek and slope buffers, trees, and which lots follow King County.

David Meade · October 16, 2026
Living room with wood-clad see-through fireplace and floor-to-ceiling windows facing the lake
Eastside and Seattle Local Guides

Hiring a waterfront home architect on Lake Washington or Lake Sammamish: what to check before you sign

Hiring a waterfront home architect on Lake Washington? Shoreline rules decide your design first. Free one-day feasibility check, fixed design fee.

David Meade · October 8, 2026
Modern entry pavilion at twilight with cedar wall, tall glazing and stone landscaping
Eastside and Seattle Local Guides

Whole house remodel architect in Bellevue, WA

Planning a $750,000+ remodel in Bellevue? Fixed-fee architect who knows the city’s remodel rules. Start with a free feasibility check, usually about a day.

David Meade · October 8, 2026
Modern entry pavilion at twilight with cedar wall, tall glazing and stone landscaping
Eastside and Seattle Local Guides

Whole house remodel architect in Medina, Washington

Whole house remodel architect for Medina, WA homes from $750,000. Free one-day feasibility check, then a fixed design fee. Call David Meade.

David Meade · October 8, 2026
Contemporary two story house with stone column, metal panel siding, deck and lawn
Eastside and Seattle Local Guides

Whole house remodel architect on Mercer Island

Whole house remodel architect for Mercer Island owners with $750,000+ budgets. Free one-day feasibility check, then a fixed design and permit fee.

David Meade · October 8, 2026
Gray midcentury house at dusk with lit entry, stone steps, boulders and new landscaping
Eastside and Seattle Local Guides

Hiring a remodel architect in Redmond, Washington: what a whole house remodel takes here

Remodel architect for Redmond, Washington houses from $750,000. Free one-day feasibility check, fixed design fee, Redmond size cap and fees checked first.

David Meade · October 8, 2026
Contemporary two story house with stone column, metal panel siding, deck and lawn
Eastside and Seattle Local Guides

Whole house remodel architect in Sammamish, on the Plateau and on Lake Sammamish

Whole house remodel architect for Sammamish owners from $750,000. Free one-day feasibility check, fixed design fee, lake and upland rules checked.

David Meade · October 8, 2026
Modern entry pavilion at twilight with cedar wall, tall glazing and stone landscaping
Eastside and Seattle Local Guides

Hunts Point, Washington building permits, zoning and shoreline rules for a remodel or rebuild in 2026

Hunts Point, WA permit rules for a remodel or rebuild: pre-application at $25,000, floor area ratio, height, shoreline setbacks, fees and hours.

David Meade · October 7, 2026
Contemporary two story house with stone column, metal panel siding, deck and lawn
Eastside and Seattle Local Guides

Yarrow Point zoning, building permits and shoreline rules for a remodel or rebuild in 2026

Yarrow Point zoning and building permits: height 25 ft above 1959 grade or 31 ft finished, 25 and 10 ft setbacks, 30% coverage, 50 ft shoreline setback.

David Meade · October 7, 2026
Cabin 1, Piper Cole Architects, Seattle Eastside WA
Eastside and Seattle Local Guides

Issaquah zoning and building permits: what you can build on your lot in 2026

Issaquah zoning for homeowners: SF-E, SF-S and SF-SL setbacks, the 30 foot height rule, impervious limits, steep slopes, trees, ADUs and the building permit.

David Meade · September 27, 2026
David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
Eastside and Seattle Local Guides

Redmond zoning explained: what the Zoning Code lets you build on your lot

Redmond zoning for homeowners: the NR zone, setbacks, 38 ft height, the 4,500 sq ft size cap, the new square footage fee, trees and Lake Sammamish lots.

David Meade · September 27, 2026
David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
Eastside and Seattle Local Guides

Sammamish zoning and building permits: what you can build on your lot in 2026

Sammamish zoning for homeowners: R-1, R-4 and R-6 rules, setbacks that grow with house size, FAR, hardscape, trees, lakes, fees and permits.

David Meade · September 27, 2026
Modern entry pavilion at twilight with cedar wall, tall glazing and stone landscaping
Eastside and Seattle Local Guides

Bellevue zoning explained: what the Land Use Code lets you build on your lot

Bellevue zoning explained: 2025 zone names, setbacks, height, lot coverage and floor area ratio, with one lot worked step by step. Sources read November 2026.

David Meade · September 26, 2026
David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
Eastside and Seattle Local Guides

Clyde Hill building permits, height and view rules: what you can build in 2026

Clyde Hill building permit rules for a new house or remodel: 25 ft above 1953 grade, 30 and 35 ft setbacks, 30% coverage, construction hours, permit steps.

David Meade · September 26, 2026
David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
Eastside and Seattle Local Guides

Kirkland zoning explained: what the code lets you build on your lot

Kirkland zoning for homeowners: RS, RSX and RSA zones, setbacks and the 15 foot side yard rule, height, lot coverage, FAR, trees and waterfront lots.

David Meade · September 26, 2026
Peck Residence rendering: modern two-story waterfront home with balcony and boat at dusk
Eastside and Seattle Local Guides

Medina, WA building permits, zoning and tree code: what you can build in 2026

Medina, WA building rules for a new house or rebuild: R-16 to R-30 setbacks, structural coverage, height, the tree code, permits and timelines.

David Meade · September 26, 2026
Peck Residence rendering: modern two-story waterfront home with balcony and boat at dusk
Eastside and Seattle Local Guides

Mercer Island building permits, zoning and tree code: what you can build in 2026

Mercer Island zoning, setbacks, floor area, tree code and shoreline rules for a new house or rebuild, plus how to apply and what permit timelines look like.

David Meade · September 26, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Eastside and Seattle Local Guides

Architect in Maple Valley, WA Custom Homes on Rural Lots

Architect in Maple Valley, WA specializing in custom homes on rural and large lots. Piper Cole Architects.

David Meade · July 2, 2026
Kitchen with long granite island, striped bar stools and sliding doors to a lake view deck
Eastside and Seattle Local Guides

Second story addition in Bellevue: what the lot allows before you design

Second story addition in Bellevue? See how floor area, height and older walls decide it, with the arithmetic shown, then request a free feasibility check.

David Meade · July 2, 2026
Flagstone entry courtyard with pruned pines leading to wood French doors and glass entry hall
Eastside and Seattle Local Guides

Home addition Kirkland: what your lot lets you build

Planning a home addition in Kirkland? See the city's own rules on yards, coverage and permits, worked on one lot, then ask for a free feasibility check.

David Meade · July 1, 2026
Primary bath with glass steam shower, soaking tub and tall windows
Eastside and Seattle Local Guides

Second story addition in Kirkland: what the lot allows before you design

Second story addition in Kirkland? See how floor area, height and older walls decide it, worked on one lot, then request a free feasibility check.

David Meade · July 1, 2026
Kitchen with cherry cabinets, marble counters, island seating, skylight and slate floor
Remodeling and Renovation

Whole house remodel architect for Seattle and the Eastside

Planning a whole house remodel in Seattle or on the Eastside? See where each city draws its line and what $750,000 buys. Request a free feasibility check.

David Meade · June 30, 2026
Kitchen with long granite island, striped bar stools and sliding doors to a lake view deck
Eastside and Seattle Local Guides

Custom home architect in Bellevue, WA

Building a new custom home in Bellevue, often a teardown? A Kirkland architect: fixed design fee, the city's own permit times, free one-day feasibility check.

David Meade · June 27, 2026
Study with cedar ceiling, skylight, built-in bookshelves, stone fireplace edge and garden windows
Eastside and Seattle Local Guides

Home remodel architect in Kirkland, WA

Remodeling a Kirkland house for $750,000 or more? An architect based in Kirkland, a fixed design fee and a free one-day feasibility check, before you commit.

David Meade · June 27, 2026
Copper chimney cap on a stacked stone chimney framed by pine branches
Eastside and Seattle Local Guides

Second story addition in Seattle: what the lot allows and what the house must carry

Second story addition in Seattle: floor area, height, structure and permit, worked on a 4,500 sq ft lot. Call David Meade for a free first feasibility check.

David Meade · June 27, 2026
Residential architecture on Seattle's Eastside by Piper Cole Architects
Eastside and Seattle Local Guides

Architect in Sammamish, WA

Custom home architect on the Sammamish Plateau, WA. Piper Cole Architects designs new homes and additions for Sammamish lots.

David Meade · June 24, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Eastside and Seattle Local Guides

Architect in Clyde Hill, WA: Luxury Home Design

Architect in Clyde Hill, WA for luxury custom homes and estate renovations. Piper Cole Architects. free feasibility check.

David Meade · June 23, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Eastside and Seattle Local Guides

Accessible Home Design and Aging in Place in Seattle: What to Build Now

Accessible home design and aging in place in Seattle. Universal design, ADU in-law suites, permits, and accessible renovation.

David Meade · May 30, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Eastside and Seattle Local Guides

Home Office Design Ideas for Seattle Homes: Additions, Conversions, and Detached Studios

Home office design options for Seattle homeowners in 2026: room conversions, garage conversions, additions, and detached studios.

David Meade · May 30, 2026
Primary bath with stone tiled glass shower, soaking tub, trough sink and skylight
Eastside and Seattle Local Guides

Home addition in Seattle: what your lot allows before you design

Planning a home addition in Seattle? See what setbacks, coverage and floor area allow under the 2026 rules, worked on one lot. Ask for a free check.

David Meade · May 27, 2026
Sunlit corner living room with fireplace, oak floor and windows facing the lake
Custom Homes and New Builds

Waterfront home architect in Seattle: what the shoreline rules let you build

Planning a Seattle waterfront house? See what the 2015 shoreline program allows, with the arithmetic on one lake lot. Ask David for a free feasibility check.

David Meade · May 25, 2026
Cedar and glass house at dusk, designed by Piper Cole Architects

Next step

Have a project in mind?

Call David Meade directly. The first feasibility check is free and usually takes about a day.

Free feasibility check

Send the address and what you have in mind. David replies to you personally.

    What are you planning?
    Your details

    No obligation. Your details go to David only. See the privacy policy.

    Chat with David on WhatsApp