What architects charge, how fee structures work and how to build a realistic project budget in the Seattle market.

Guides

Sunlit corner living room with fireplace, oak floor and windows facing the lake
Costs, Fees and Budgets

City of Issaquah building permit fees for a $750,000 remodel

What the City of Issaquah charges for permits on a $750,000 remodel: its 2026 fee documents worked line by line, with the source of each number.

David Meade · October 21, 2026
Great room seen over a geometric wood and metal stair railing with chandelier and fireplace
Costs, Fees and Budgets

City of Mercer Island building permit fees for a $750,000 remodel

What the City of Mercer Island charges to permit a $750,000 remodel: its August 2026 fee schedule worked line by line, plus the charges outside it.

David Meade · October 21, 2026
Sunlit corner living room with fireplace, oak floor and windows facing the lake
Costs, Fees and Budgets

City of Sammamish building permit fees for a $750,000 remodel

What the City of Sammamish charges for permits on a $750,000 remodel: the 2026 fee schedule worked line by line, with the trades and what sits outside it.

David Meade · October 21, 2026
Remodeled split level house with white siding, stone base, black windows and modern garage door
Costs, Fees and Budgets

What Bellevue charges for the permits on a $750,000 remodel

What Bellevue's own fee estimator returned for a $750,000 remodel in October 2026, worked line by line, with what sits outside it and what to confirm.

David Meade · October 16, 2026
Oversized wood pivot entry door set in a stone wall under a covered porch
Costs, Fees and Budgets

City of Kirkland building permit fees for a major remodel

What the City of Kirkland charges for permits on a $750,000 remodel: the 2026 fee schedule worked line by line, plus trades, drainage, trees and impact fees.

David Meade · October 16, 2026
Kitchen with cherry cabinets, marble counters, island seating, skylight and slate floor
Costs, Fees and Budgets

City of Redmond building permit fees for a $750,000 remodel

What the City of Redmond charges for permits on a $750,000 remodel: the 2026 fee schedule worked line by line, plus trades, trees and impact fees.

David Meade · October 16, 2026
Flagstone entry courtyard with pruned pines leading to wood French doors and glass entry hall
Costs, Fees and Budgets

What a building permit costs in Seattle for a major remodel

What a Seattle building permit costs on a $750,000 remodel: the 2026 SDCI fee table worked step by step, the extra reviews, and how Eastside cities differ.

David Meade · October 7, 2026
Living room with wood-clad see-through fireplace and floor-to-ceiling windows facing the lake
Costs, Fees and Budgets

Planning a million dollar remodel in Seattle and on the Eastside

Planning a $750,000 to $2M+ remodel in Seattle or on the Eastside? What the money buys per sq ft, where it goes, fees, timeline and leveling bids.

David Meade · October 1, 2026
David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
Costs, Fees and Budgets

How do I finance a custom home build in Seattle or on the Eastside?

How construction-to-permanent loans, draws and land equity work, and what a lender needs from the design side before it will fund a custom home in Washington.

David Meade · September 26, 2026
Peck Residence rendering: modern two-story waterfront home with balcony and boat at dusk
Guide

Custom home build estimates and contracts, and how to read what a builder is actually quoting

Why two builder bids for the same house differ by six figures, what an allowance schedule hides, and how to level two bids properly. Eastside construction runs $400 to $900 a sq ft.

David Meade · September 24, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Costs, Fees and Budgets

How Architects Get Paid in Seattle: A Homeowner’s Guide to Fees and Billing

How do architects actually get paid? Retainers, milestone billing, hourly invoices, and reimbursables explained for Seattle-area homeowners.

David Meade · May 30, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Costs, Fees and Budgets

How to Budget for an Architect in Seattle: A Complete Guide for Homeowners

Complete guide to budgeting for architect fees in Seattle. Percentage, fixed, and hourly fee structures explained with real numbers and a full cost.

David Meade · May 29, 2026
David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
Costs, Fees and Budgets

What an Architect Costs in Seattle in 2026

What a Seattle architect really charges in 2026, with real Eastside project fees and a calculator that gives you your own number. Call David on 425 753 6452.

David Meade · May 25, 2026
Cedar and glass house at dusk, designed by Piper Cole Architects

Next step

Have a project in mind?

Call David Meade directly. The first feasibility check is free and usually takes about a day.

Free feasibility check

Send the address and what you have in mind. David replies to you personally.

    What are you planning?
    Your details

    No obligation. Your details go to David only. See the privacy policy.

    Chat with David on WhatsApp