1. Home
  2. Blog
  3. Remodeling and Renovation

Topic

Remodeling and Renovation

Kitchen, bathroom, basement and whole-house remodels where structure, permits and design all have to line up.

Guides

Bathroom with oak double vanity, black framed mirrors, brass sconces and freestanding tub
Remodeling and Renovation

How to compare contractor bids from architect drawings in Seattle and the Eastside

How to compare contractor bids on one set of drawings: bid types, bid leveling, Washington L&I checks, contract points and what the architect does.

David Meade · November 9, 2026
Great room seen over a geometric wood and metal stair railing with chandelier and fireplace
Remodeling and Renovation

Second story addition and whole house remodel on the Seattle Eastside

Planning a second story addition and whole house remodel in Seattle or on the Eastside? Free first feasibility check from David Meade, Kirkland architect.

David Meade · October 31, 2026
Bathroom with floating cherry double vanity, white stone counter and clerestory windows
Remodeling and Renovation

Buying a house to remodel in Seattle or on the Eastside: check what you can change before you close

Buying a house to remodel in Seattle or on the Eastside? See what each city's code lets you change before you close. Request a free feasibility check.

David Meade · October 31, 2026
Remodeled split level house with white siding, stone base, black windows and modern garage door
Remodeling and Renovation

As built drawings and existing conditions before a remodel in Seattle and on the Eastside

As built drawings, existing conditions and surveys for a Seattle or Eastside remodel, from each city's own checklist. Ask David about a free first check.

David Meade · October 30, 2026
Sunlit corner living room with fireplace, oak floor and windows facing the lake
Costs, Fees and Budgets

City of Issaquah building permit fees for a $750,000 remodel

What the City of Issaquah charges for permits on a $750,000 remodel: its 2026 fee documents worked line by line, with the source of each number.

David Meade · October 21, 2026
Great room seen over a geometric wood and metal stair railing with chandelier and fireplace
Costs, Fees and Budgets

City of Mercer Island building permit fees for a $750,000 remodel

What the City of Mercer Island charges to permit a $750,000 remodel: its August 2026 fee schedule worked line by line, plus the charges outside it.

David Meade · October 21, 2026
Sunlit corner living room with fireplace, oak floor and windows facing the lake
Costs, Fees and Budgets

City of Sammamish building permit fees for a $750,000 remodel

What the City of Sammamish charges for permits on a $750,000 remodel: the 2026 fee schedule worked line by line, with the trades and what sits outside it.

David Meade · October 21, 2026
Primary bath with glass steam shower, soaking tub and tall windows
Eastside and Seattle Local Guides

Whole house remodel architect in Woodinville, WA

Remodeling a Woodinville house for $750,000 or more? A fixed design fee, a free feasibility check in about a day and the city's own rules on walls and review.

David Meade · October 21, 2026
Remodeled split level house with white siding, stone base, black windows and modern garage door
Costs, Fees and Budgets

What Bellevue charges for the permits on a $750,000 remodel

What Bellevue's own fee estimator returned for a $750,000 remodel in October 2026, worked line by line, with what sits outside it and what to confirm.

David Meade · October 16, 2026
Study with cedar ceiling, skylight, built-in bookshelves, stone fireplace edge and garden windows
Eastside and Seattle Local Guides

Gut renovation or rebuild: how to decide in Seattle and on the Eastside

Gut renovation or teardown and rebuild at $750,000 or more? What your city's code lets a gut keep, what a rebuild resets, and how to decide with facts.

David Meade · October 16, 2026
Living room with wood-clad see-through fireplace and floor-to-ceiling windows facing the lake
Eastside and Seattle Local Guides

How long does a whole house remodel take in Seattle and on the Eastside?

How long a whole house remodel takes in Seattle and the Eastside: design, each city's own review numbers, a sample calendar, and why I give no build time.

David Meade · October 16, 2026
Oversized wood pivot entry door set in a stone wall under a covered porch
Costs, Fees and Budgets

City of Kirkland building permit fees for a major remodel

What the City of Kirkland charges for permits on a $750,000 remodel: the 2026 fee schedule worked line by line, plus trades, drainage, trees and impact fees.

David Meade · October 16, 2026
Kitchen with cherry cabinets, marble counters, island seating, skylight and slate floor
Costs, Fees and Budgets

City of Redmond building permit fees for a $750,000 remodel

What the City of Redmond charges for permits on a $750,000 remodel: the 2026 fee schedule worked line by line, plus trades, trees and impact fees.

David Meade · October 16, 2026
Primary bedroom with upholstered headboard, globe pendant and sliding doors to a lake view deck
Eastside and Seattle Local Guides

Schematic design vs design development vs construction documents on a whole house remodel

What happens in each phase of an architect's work on a whole house remodel, what you approve at each one, and where the permit sits.

David Meade · October 16, 2026
Sunlit corner living room with fireplace, oak floor and windows facing the lake
Eastside and Seattle Local Guides

Structural engineer for a home remodel in Seattle and on the Eastside

When a home remodel or addition needs a structural engineer in Seattle and on the Eastside: triggers, who may stamp, what they deliver, schedule.

David Meade · October 16, 2026
Great room seen over a geometric wood and metal stair railing with chandelier and fireplace
Eastside and Seattle Local Guides

Whole house remodel architect in Clyde Hill, Washington

Remodeling in Clyde Hill for $750,000 or more? The city's $493,000 substantial remodel line, 1953 grade height rule, a fixed fee and a free one-day check.

David Meade · October 16, 2026
Tall window wall and French doors opening to a deck with cable rail and lake view
Eastside and Seattle Local Guides

Whole house remodel architect in Issaquah, WA

Remodeling an Issaquah house for $750,000 or more? A fixed design fee, a free one-day feasibility check and the city's own code and review times.

David Meade · October 16, 2026
Living room with wood-clad see-through fireplace and floor-to-ceiling windows facing the lake
Eastside and Seattle Local Guides

Hiring a waterfront home architect on Lake Washington or Lake Sammamish: what to check before you sign

Hiring a waterfront home architect on Lake Washington? Shoreline rules decide your design first. Free one-day feasibility check, fixed design fee.

David Meade · October 8, 2026
Modern entry pavilion at twilight with cedar wall, tall glazing and stone landscaping
Eastside and Seattle Local Guides

Whole house remodel architect in Bellevue, WA

Planning a $750,000+ remodel in Bellevue? Fixed-fee architect who knows the city’s remodel rules. Start with a free feasibility check, usually about a day.

David Meade · October 8, 2026
Modern entry pavilion at twilight with cedar wall, tall glazing and stone landscaping
Eastside and Seattle Local Guides

Whole house remodel architect in Medina, Washington

Whole house remodel architect for Medina, WA homes from $750,000. Free one-day feasibility check, then a fixed design fee. Call David Meade.

David Meade · October 8, 2026
Contemporary two story house with stone column, metal panel siding, deck and lawn
Eastside and Seattle Local Guides

Whole house remodel architect on Mercer Island

Whole house remodel architect for Mercer Island owners with $750,000+ budgets. Free one-day feasibility check, then a fixed design and permit fee.

David Meade · October 8, 2026
Gray midcentury house at dusk with lit entry, stone steps, boulders and new landscaping
Eastside and Seattle Local Guides

Hiring a remodel architect in Redmond, Washington: what a whole house remodel takes here

Remodel architect for Redmond, Washington houses from $750,000. Free one-day feasibility check, fixed design fee, Redmond size cap and fees checked first.

David Meade · October 8, 2026
Contemporary two story house with stone column, metal panel siding, deck and lawn
Eastside and Seattle Local Guides

Whole house remodel architect in Sammamish, on the Plateau and on Lake Sammamish

Whole house remodel architect for Sammamish owners from $750,000. Free one-day feasibility check, fixed design fee, lake and upland rules checked.

David Meade · October 8, 2026
Midcentury house with cedar shake roof, long covered patio and flagstone courtyard with garden beds
Remodeling and Renovation

Hiring a whole house remodel architect in Seattle

Hiring a whole house remodel architect in Seattle? Free one-day feasibility check, fixed design fee, and the 2026 Seattle rules for $750,000+ remodels.

David Meade · October 8, 2026
Flagstone entry courtyard with pruned pines leading to wood French doors and glass entry hall
Costs, Fees and Budgets

What a building permit costs in Seattle for a major remodel

What a Seattle building permit costs on a $750,000 remodel: the 2026 SDCI fee table worked step by step, the extra reviews, and how Eastside cities differ.

David Meade · October 7, 2026
Gray midcentury house at dusk with lit entry, stone steps, boulders and new landscaping
Permits, Zoning and Code

Seattle stormwater code for a remodel or addition: what triggers it and what the permit set must show

How Seattle's 2026 stormwater code applies to a remodel, addition or rebuild: the 750 and 1,500 square foot lines and what permits must show.

David Meade · October 7, 2026
Midcentury house with cedar shake roof, long covered patio and flagstone courtyard with garden beds
Permits, Zoning and Code

Swimming pool permits in Seattle and on the Eastside: what a pool adds to a remodel permit

Pool permits in Seattle, Bellevue, Kirkland, Mercer Island and Medina: the 2021 pool code, barriers, setbacks, hot tub covers and sequencing with a remodel.

David Meade · October 7, 2026
Flagstone entry courtyard with pruned pines leading to wood French doors and glass entry hall
Permits, Zoning and Code

What the Washington energy code asks of a remodel or an addition

How the 2021 Washington State Energy Code treats a remodel or addition: windows, insulation, ducts, energy credits, blower door tests, conversions, Seattle.

David Meade · October 7, 2026
Modern entry pavilion at twilight with cedar wall, tall glazing and stone landscaping
Permits, Zoning and Code

When a remodel counts as a new house: the Eastside thresholds, city by city

Each Eastside city draws the line between a remodel and a new house differently: dollars, percent of value, wall length or years. The tests, side by side.

David Meade · October 7, 2026
Living room with wood-clad see-through fireplace and floor-to-ceiling windows facing the lake
Costs, Fees and Budgets

Planning a million dollar remodel in Seattle and on the Eastside

Planning a $750,000 to $2M+ remodel in Seattle or on the Eastside? What the money buys per sq ft, where it goes, fees, timeline and leveling bids.

David Meade · October 1, 2026
Midcentury house with cedar shake roof, long covered patio and flagstone courtyard with garden beds
Remodeling and Renovation

Rambler remodel in Seattle and on the Eastside: an architect’s guide to the big decisions

Planning a big rambler remodel in Seattle or the Eastside? An architect on opening the plan, vaulting, second stories, seismic, energy code and cost.

David Meade · October 1, 2026
Kitchen with cherry cabinets, marble counters, island seating, skylight and slate floor
Remodeling and Renovation

Can you live in your house during a renovation? How I help Seattle and Eastside owners decide

Can you live in your house during a renovation? An architect's guide for Seattle and Eastside owners: scopes that force a move, phasing, lead, asbestos, cost.

David Meade · October 1, 2026
Remodeled split level house with white siding, stone base, black windows and modern garage door
Remodeling and Renovation

Split level remodel on the Eastside: an architect’s guide to the big moves, the code and the cost

Planning a major split level remodel in Bellevue, Kirkland, Sammamish or Issaquah? Entry and stair, open plan, raising the roof, lower level code, cost.

David Meade · October 1, 2026
Peck Residence rendering: modern two-story waterfront home with balcony and boat at dusk
Permits, Zoning and Code

Remodeling a waterfront home on Lake Washington, Lake Sammamish or the Sound: what changes on the water

Remodeling a house on Lake Washington, Lake Sammamish or the Sound? How shoreline rules, setbacks and a grandfathered footprint shape what you can change.

David Meade · October 1, 2026
5831 Rec Room, Piper Cole Architects, Seattle Eastside WA
Remodeling and Renovation

Basement dig out in Seattle and on the Eastside: underpinning, house lifting, code and cost

Lowering a basement or turning a crawl space into living space in Seattle or the Eastside: underpinning vs lifting, ceiling height, egress, permits, costs.

David Meade · September 26, 2026
Should I remodel my house or tear it down and rebuild?
Custom Homes and New Builds

Should I remodel my house or tear it down and rebuild?

Remodel at $300 to $550 a sq ft, add on at $350 to $650, or rebuild at $400 to $900? The code threshold that often decides it, and a scorecard for your house.

David Meade · September 26, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside
Remodeling and Renovation

Kitchen remodel cost in Bellevue

Bellevue kitchens split into three tiers, from a $40k refresh to a $200k structural open plan. What decides which one you are in. Call David direct.

David Meade · September 17, 2026
Kitchen renovation with matte-black cabinets, white quartz island and forest views near Seattle
Remodeling and Renovation

Kitchen Renovation Architect in Seattle, WA

Do you need an architect for a kitchen renovation in Seattle? The honest answer depends on what you want to change. Find out here.

David Meade · July 2, 2026
Open-plan kitchen with warm-wood and white cabinets and a large island near Seattle
Remodeling and Renovation

Open Floor Plan & Load-Bearing Wall Removal in Seattle Homes

Removing a load-bearing wall in your Seattle home? Structural requirements, permit process, and realistic costs explained by Piper Cole Architects.

David Meade · July 2, 2026
Remodeled Bellevue living room with gas fireplace, walnut wall and floor-to-ceiling windows
Remodeling and Renovation

Whole House Remodel Cost in Bellevue, WA 2026

Whole-house remodel cost in Bellevue, WA (2026): real budget ranges and the factors that drive them, explained by licensed architects at Piper Cole.

David Meade · July 2, 2026
Kitchen with cherry cabinets, marble counters, island seating, skylight and slate floor
Remodeling and Renovation

Whole house remodel architect for Seattle and the Eastside

Planning a whole house remodel in Seattle or on the Eastside? See where each city draws its line and what $750,000 buys. Request a free feasibility check.

David Meade · June 30, 2026
Study with cedar ceiling, skylight, built-in bookshelves, stone fireplace edge and garden windows
Eastside and Seattle Local Guides

Home remodel architect in Kirkland, WA

Remodeling a Kirkland house for $750,000 or more? An architect based in Kirkland, a fixed design fee and a free one-day feasibility check, before you commit.

David Meade · June 27, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Remodeling and Renovation

Moisture Management in Pacific Northwest Renovations

Moisture management in Pacific Northwest renovations: how to keep rain and rot out of your remodel. Architect guidance from Piper Cole, Kirkland WA.

David Meade · June 22, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Remodeling and Renovation

Architect in Shoreline, WA: Mid-Century Renovation and ADU Design

Architecture services in Shoreline, WA. Mid-century modern renovation, ADU design, home additions, and new construction near the Shoreline Link station.

David Meade · June 1, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Remodeling and Renovation

Historic Preservation Architecture in Seattle: Renovating Landmarked Buildings

Renovating a Seattle landmark? Certificate of Approval, design standards, historic districts, and finding a preservation-experienced architect.

David Meade · May 30, 2026
Oversized wood pivot entry door set in a stone wall under a covered porch
Remodeling and Renovation

Earthquake retrofitting for older Seattle homes: foundation bolting and cripple wall bracing

Earthquake retrofit for an older Seattle home: foundation bolting, cripple wall bracing, SDCI's plan set, who qualifies, the permit, remodel triggers.

David Meade · May 30, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Remodeling and Renovation

Seattle Home Renovation Permit Checklist (2026): What Requires a Permit?

Does your Seattle renovation require a building permit? A comprehensive 2026 checklist of what does and does not require a permit under Seattle building.

David Meade · May 29, 2026
Renovated kitchen with white shaker and walnut cabinets and a waterfront view near Seattle
Remodeling and Renovation

Home Renovation Cost in Seattle 2026: By Room and Scope

Realistic home renovation costs in Seattle by room and scope for 2026. Kitchen, bathroom, whole-home: what each level of renovation actually costs.

David Meade · May 27, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Remodeling and Renovation

Historic Home Renovation in Seattle: Preserving Character While Modernizing

Renovating a historic Seattle home? Preserve character while modernizing systems, floor plans, and energy performance. free feasibility check.

David Meade · May 25, 2026
Mid-century-inspired home with warm-wood siding, wide eaves and horizontal lines near Seattle
Remodeling and Renovation

Mid-Century Modern Architecture in Seattle: Renovating and Restoring MCM Homes

Renovating a mid-century modern home in Seattle? Northwest Contemporary MCM homes require specialized design knowledge. free feasibility check.

David Meade · May 25, 2026
Open-plan living room with linear fireplace and floor-to-ceiling windows to a waterfront view
Remodeling and Renovation

Open Floor Plan Renovation: Transforming a Closed Layout in Your Seattle Home

Opening a closed floor plan in your Seattle home? Structural walls, beams, permits, and design considerations explained by Piper Cole Architects.

David Meade · May 25, 2026
Primary bathroom with marble walk-in shower, freestanding tub and dual vanities near Seattle
Remodeling and Renovation

Standard Bathroom Sizes for Home Renovation: What Your Architect Needs You to Know

Standard bathroom sizes, clearances, and layout options for home renovation in Seattle. What your architect needs you to know before you design.

David Meade · May 25, 2026
Cedar and glass house at dusk, designed by Piper Cole Architects

Next step

Have a project in mind?

Call David Meade directly. The first feasibility check is free and usually takes about a day.

Free feasibility check

Send the address and what you have in mind. David replies to you personally.

    What are you planning?
    Your details

    No obligation. Your details go to David only. See the privacy policy.

    Chat with David on WhatsApp