Home remodel architect in Kirkland, WA

What a Kirkland remodel runs into at the city, what it costs to design, how long the city says review should take, and what to ask any architect before you sign.

By David Meade, AIA, NCARBUpdated 13 October 202610 min read

On this page

    Key takeaways

    • Kirkland’s remodel rule asks which walls and roofs you touch. Structurally altering a roof or exterior wall that sits inside today’s yards or above today’s height limit means that part must conform (KZC 162.35(7)). Other nonconformances must be corrected when 12 months of work costs more than 50 percent of the improvement’s replacement cost.
    • RS needs 5 foot side yards totaling 15 feet and stops at 25 feet of height. RSX needs 5 feet each side and allows 30 feet.
    • The city’s goal for a first review of a single family addition or alteration on the regular track is 4 weeks, then 10 business days per revision.
    • My fee for design and permit is fixed, about $10,000 to $200,000, set by project budget and location. The first feasibility check is free and takes about a day.
    • Piper Cole Architects is based in Kirkland. It designs and administers construction. It does not build.

    Short answer: Piper Cole Architects is based in Kirkland, and I design whole house remodels here for a fixed fee, about $10,000 to $200,000 depending on the project budget and location. The first feasibility check is free and takes about a day. Before you pay for drawings, your architect should tell you which Kirkland rules will decide the job: whether any wall or roof sits inside today’s yards or height, which review track your scope lands on, what the city wants about trees and drainage, and, on the lake, what the shoreline chapter does.

    This page is for a Kirkland owner with a remodel budget of $750,000 or more who is comparing architects. Piper Cole designs and administers construction on your behalf. It does not build, so the builder you hire answers to you and to the drawings. The rules below come from the Kirkland Zoning Code (KZC) and the City of Kirkland’s own permit pages, read on 13 October 2026, and they change. For new area or a new house, see home additions and custom homes in Kirkland, and for one room the kitchen remodel page.

    What Kirkland’s code lets a remodel keep or change

    Many Kirkland houses were built under older rules and now sit inside a yard or above a height limit. That is legal, and the code calls it nonconforming. For that part of the house, Kirkland sets no percentage and no dollar line. It asks which parts you alter.

    Rule What the code says What it does to a remodel
    Roof or wall that misses today’s yards or height (KZC 162.35(7)) Any structural alteration of a roof or exterior wall that does not comply with height, required yard or view corridor standards requires that the nonconformity be brought into conformance. Repair or maintenance of structural members is excepted. A wall 3 feet from a side line cannot be rebuilt in place where the zone wants 5. The first step is to draw today’s yards and height over your survey and list which walls and roofs sit outside them.
    Any other nonconformance (KZC 162.35(13)) It must be corrected when work in a consecutive 12 month period on the nonconforming improvement, or one that supports it, costs more than 50 percent of that improvement’s replacement cost. Example only: at a replacement cost of $1,500,000, the line is $750,000 ($1,500,000 x 0.50). The window is 12 months, so phasing matters. Ask the city how it will count replacement cost.
    Floor area, coverage and height (KZC 115.42, 115.90, 115.59) Floor area counts the area inside the exterior walls on every level, garage included, with listed exclusions, and ceilings over 16 feet count twice. Lot coverage counts all structures and hardscape, 50 percent in most zones. Height is measured above average building elevation. An addition is tested against all three. The city’s checklist asks for floor area, lot coverage and average building elevation calculations when a project adds area or paving or changes the roof line.

    Sources: KZC 162.35 in a published copy of the code current through Ordinance 4905 (2025), because the city’s own code host blocks automated readers; KZC chapters 15 and 115, cross-checked 13 October 2026; the city’s Single Family/Duplex Permit Checklist. The use chart (KZC 15.20) lists no required review process for a detached dwelling in RS and RSX, so zoning is ordinarily checked inside the building permit. Shoreline lots add their own steps. Confirm with the city.

    My threshold comparison sets Kirkland beside other cities, and my Kirkland zoning guide has the detail. If your plan touches walls that sit inside a yard, compare it with a rebuild to today’s yards, as in remodel or tear down.

    RS and RSX: what changes in a remodel

    Many Kirkland single family lots are RS, RSX or RSA, and the number after RS or RSX is the minimum lot size in thousands of square feet.

    Item RS zones RSX zones What it does to a remodel
    Side yards 5 feet each, 15 feet combined 5 feet each On a 60 foot lot an RS house can be 45 feet wide (60 minus 15) and an RSX house 50 feet (60 minus 10).
    Height 25 feet above average building elevation 30 feet The height difference can decide whether a second story fits.
    Front yard, rear yard, coverage 20 feet, 10 feet, 50 percent 20 feet, 10 feet, 50 percent The same in both.

    Source: KZC 15.30 with special regulations DD-6 and DD-9, cross-checked 13 October 2026 in a published copy of chapter 15. RSA zones, the Holmes Point and Goat Hill overlays and lots near the lake add rules.

    Floor area is a share of the lot: 50 percent in the 5.0 through 8.5 zones, 35 percent in the 12.5 zones, 20 percent in the 35 zones. A 10,000 square foot RS 8.5 lot carries 5,000 square feet (10,000 x 0.50), garage included.

    Free feasibility check

    Planning a custom home or a remodel of $750,000 or more?

    Send me the address and a few lines about what you want. The first feasibility check is free and usually takes about a day.

    Shoreline, trees, drainage and design review

    Shoreline. Land within 200 feet of the ordinary high water mark of Lake Washington falls under KZC chapter 83. The rule for an existing house echoes the one above: it may be maintained, repaired, altered and remodeled, but structurally altering a roof or exterior wall that misses the shoreline setback or height means it must conform, with narrow exceptions for windows and doors. Growth inside the setback needs a shoreline variance, except that a detached house built before December 1, 2006 can add up to 10 percent of its gross floor area there, no further waterward, with restoration, once in five years. This is from Ordinance 4701 (2020), because the current code host blocks automated readers, so confirm the text. The detail is in my waterfront remodel guide and Kirkland waterfront architect page.

    Trees. The city’s checklist says a tree retention plan is required for any scope needing a development permit unless KZC chapter 95 exempts it. An exemption may apply to additions and remodels under 50 percent of the existing footprint with no work in the critical root zone of regulated trees. A regulated tree is 6 inches across or more at breast height, and the critical root zone is a radius of one foot per inch of trunk. The trees are best located and measured at the start of design.

    Drainage, street frontage and fire. The same checklist sets thresholds that matter at $750,000. A stormwater drainage plan and erosion control plan are required at 500 square feet or more of new or replaced impervious surface. A right-of-way improvements plan by a licensed civil engineer is required for single family additions valued above $200,000, with the addition valued by the city’s Building Valuation Data Table. The checklist says a fire sprinkler system is required when gross floor area is 5,000 square feet or more, and a geotechnical report is required on or within 25 feet of a regulated slope. Ask the city early what each means for your lot.

    Design review. The city’s design review brochure lists eight districts, such as the central business, Juanita, Rose Hill and Totem Lake districts, and no low density residential zone. It is dated February 2014, so confirm the current rule for your parcel.

    How long Kirkland review takes, in the city’s own numbers

    Kirkland publishes review goals, last updated 15 September 2026, and says actual times vary.

    Review type What qualifies, per the city First review goal Each revision goal
    Express Addition up to 500 sq ft, one level, no heated space; alterations in no more than 50 percent of existing area; no complex structural alterations 3 business days 3 business days
    Fast Track Addition up to 50 percent of existing area, may be more than one level; no complex structural alterations 10 business days 5 business days
    Regular, single family addition or alteration Anything that does not qualify above 4 weeks 10 business days
    Regular, new house (for comparison) A new single family house 4 weeks, or 7 weeks in Shoreline, Goat Hill or Holmes Point areas 10 business days

    Sources: City of Kirkland, Time to Review Goals (last updated 9.15.2026) and its Permit Review Times page, which describes Express as about one week and Fast Track as about two weeks; I use the table. The table says projects in the shoreline, Goat Hill or Holmes Point areas use regular times, and that third-party structural review adds time.

    Complex structural alterations rule a project out of both fast tracks. Work within 25 feet of a regulated slope or 100 feet of a wetland or stream rules it out of Express and limits Fast Track to cases such as SEPA exempt or repair work. A whole house scope will usually sit on the regular row, so I plan on 4 weeks to first comments, then about 2 weeks per revision. Two correction rounds come to about 8 weeks of city time (4 + 2 + 2), before the days spent answering. That is arithmetic on goals.

    I did not find a Kirkland report of how long completed residential permits actually took. The city’s 2025 annual permit performance report lists six decisions, none a single family house. Bellevue does publish measured days, in my Bellevue remodel page.

    Applications go through MyBuildingPermit.com, and a pre-submittal conference is optional. Electrical work needs its own permit, and mechanical and plumbing do too unless included in the building permit. Rodent abatement for exterior work can take 2 to 6 weeks. My Kirkland permit guide has the steps.

    What changes the cost and the schedule

    Item Planning figure What moves it
    Design and permit fee Fixed fee, about $10,000 to $200,000 Project budget and location. The agreed scope is the scope the fee covers.
    Whole house renovation $300 to $550 per sq ft Condition of the structure, how much of the plan changes, new systems, site access.
    Additions $350 to $650 per sq ft New foundation, roof and envelope, and the review track.
    Design to permit submission Typically 2 to 4 months Survey, existing conditions, engineering and your decisions.
    City review See the table above Review track, completeness of the first submission, comments.

    Planning ranges from Piper Cole, before design fees, permits, sales tax and contingency. They are not quotes.

    At those ranges, $750,000 of construction renovates roughly 1,364 to 2,500 sq ft ($750,000 divided by $550, and by $300). The million dollar remodel guide shows where the money goes. A nonconforming wall, the drainage and right-of-way items above, trees, the shoreline chapter and the energy code can each add scope. Permit fees are set by the city and kept apart from my fee; my Kirkland permit fee guide works the city’s schedule line by line, so I do not repeat amounts here.

    Great room with tall window wall and French doors opening to a deck with cable rail and lake view
    Huang Residence, Piper Cole Architects. A great room with a tall window wall and French doors opening to a deck with a cable rail and a lake view.

    What to ask any architect before you sign

    1. Which of my walls and roofs sit inside today’s yards or height, and which will my plan alter structurally? The answer should name KZC 162.35 and come from my survey.
    2. Is my lot RS, RSX or RSA, and is it in an overlay or the shoreline area? Yards, height, floor area and review time depend on it.
    3. Which review track will my scope land on, and how many correction rounds did your last Kirkland jobs take?
    4. Is the fee fixed, and is it set before drawings start? Ask whether it is a fixed fee or a percentage of construction cost, and what happens if the budget moves.
    5. What sits outside the fee? A surveyor, structural, civil and geotechnical engineers, an arborist and the city’s permit fees are the usual items to ask about.
    6. Will I need a right-of-way improvements plan, a drainage report or a sprinkler system?
    7. Do you administer construction, and do you build? I administer for you and do not build, so the person judging the work is not doing it.
    8. When do I get a straight answer on whether the project fits the budget? Mine starts with the free feasibility check, before any design fee.

    How the work runs, in order

    Step Typical time What you get
    Free feasibility check About a day Whether the plan fits the lot, the code and the budget at a basic level.
    In-depth analysis, if you want it $1,500, 2 to 3 weeks A deeper look at zoning, code and budget. For a Kirkland house, this maps the walls and roofs inside the yards.
    Design to permit submission Typically 2 to 4 months Drawings, engineering and the permit set, filed on MyBuildingPermit.com.
    City review See the table above Comments, revisions and an issued permit.
    Bidding and construction Set by scope and builder Leveled bids, a contract, and my administration of construction. Ask each builder for a written schedule.

    I have worked as an architect since 1996, I am an AIA member since 1992 and an NCARB member since 1996, and I take on 20 to 30 projects a year. I have won three Masonry Excellence Awards, for commercial projects. The Carr residence was featured in Above The Lake and Lux magazines. My office is in Kirkland, and the remodels I take on start at $750,000.

    Selected work

    Remodels from the practice.

    See the full portfolio

    Before you design

    Find out what your Kirkland house will carry

    Send me the address and what you want to change. The first feasibility check is free and takes about a day.

    Questions

    How much does an architect cost for a whole house remodel in Kirkland?

    I quote a fixed fee for design and permit, set by the project budget and location, typically about $10,000 to $200,000 depending on scope. The first feasibility check is free and takes about a day. An in-depth analysis is $1,500 and takes 2 to 3 weeks. Ask any firm whether its fee is fixed and what sits inside it. City permit fees are separate and are set by the City of Kirkland.

    Do I need an architect to remodel my house in Kirkland?

    Not by law. RCW 18.08.410(5) exempts design work for a residential building of up to and including four dwelling units from the architect licensing requirement. The city does require drawings: its single family checklist asks for a construction plan set with architectural and structural drawings and, in most cases, a site plan, stamped and signed if a Washington licensed design professional prepared them. An architect prepares those drawings, coordinates the engineers and surveyor, and answers the city’s comments.

    Will my Kirkland remodel be treated like a new house?

    Kirkland has no single cost or percentage line that turns a remodel into a new house. If the house is nonconforming, structurally altering a roof or exterior wall that misses today’s yards or height means that part must be brought into conformance (KZC 162.35(7)). Other nonconformances must be corrected when work in a 12 month period costs more than 50 percent of the replacement cost of that improvement. A house that already meets today’s rules has nothing to lose. Confirm with the city.

    How long does Kirkland take to review a remodel permit?

    The city’s Time to Review Goals, last updated 15 September 2026, set a first review goal of 4 weeks for a single family addition or alteration on the regular track, then 10 business days for each revision. Fast Track is 10 business days and Express is 3 business days for smaller scopes. These are goals, and the city says actual times vary. I did not find a published report of how long completed residential permits actually took.

    What is the difference between RS and RSX zoning for a remodel?

    RS needs side yards of at least 5 feet that total 15 feet and limits height to 25 feet above average building elevation. RSX needs 5 feet on each side with no combined total and allows 30 feet. Front yard (20 feet), rear yard (10 feet), 50 percent lot coverage and the floor area ratio are the same as the matching RS zone. Source: KZC 15.30, as of September 2026.

    Can I remodel my Kirkland house on Lake Washington?

    Usually yes, if it was legally built. Within 200 feet of the ordinary high water mark, KZC chapter 83 applies. A nonconforming house may be maintained, repaired, altered and remodeled, but structurally altering a roof or exterior wall that misses the shoreline setback or height means it must be brought into conformance. Growth inside the setback generally needs a shoreline variance, with a limited allowance for detached houses built before December 1, 2006. I read this in Ordinance 4701 (2020), so confirm the current text with the city.

    Do I have to keep my trees during a Kirkland remodel?

    A tree retention plan is required for any scope of work needing a development permit unless KZC chapter 95 exempts it. The city says an exemption may apply to additions and remodels where the proposed improvements are less than 50 percent of the existing footprint and no work is proposed within the critical root zone of regulated trees. Regulated trees are 6 inches or more across at breast height. Confirm with the city for your lot.

    How much house can $750,000 renovate?

    At the planning range of $300 to $550 per square foot for a whole house renovation, $750,000 of construction covers roughly 1,364 to 2,500 square feet. That excludes design fees, permits, sales tax and contingency, and a builder’s bid on finished drawings is the real number.

    Does Piper Cole build the project?

    No. Piper Cole designs the project and administers construction on your behalf, and it does not build. You contract with the builder, and I work for you during construction.


    David Meade, AIA, NCARB
    Principal Architect, Piper Cole Architects · Kirkland, WA

    David Meade is a licensed architect (AIA, NCARB) who has worked as an architect since 1996, with three Masonry Excellence Awards for commercial projects and a residential practice on the Seattle Eastside. He has designed custom homes, additions, and ADUs in Kirkland, Bellevue, Redmond, and Seattle. Learn more about David →

    Study with cedar ceiling, skylight, built-in bookshelves, stone fireplace edge and garden windows

    Next step

    Have a project in mind?

    Call David Meade directly, or send the address and a few lines about what you want. The first feasibility check is free and usually takes about a day.

    Free feasibility check

    Send the address and what you have in mind. David replies to you personally.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp