Residential architecture project by Piper Cole Architects, Seattle Eastside WA
  1. Home
  2. Blog
  3. Remodeling and Renovation

Remodeling and Renovation

Earthquake Retrofitting for Seattle Homes: What Older Houses Need

By David Meade, AIA, NCARBMay 30, 20263 min read

On this page

    Seattle sits in a seismically active region, the Cascadia Subduction Zone, nearby crustal faults, and the Seattle Fault all pose meaningful earthquake risk. Older homes built before modern seismic codes have specific vulnerabilities that can be addressed with targeted retrofits.

    The Most Common Vulnerability: Cripple Walls

    Most pre-1970 Seattle homes have a short wood-framed “cripple wall” between the foundation and the first floor. In an earthquake, these walls can collapse sideways, causing the house to slide off its foundation. Plywood sheathing bracing of cripple walls is the most cost-effective retrofit available.

    Cost: $5,000-$20,000 depending on perimeter length and access

    Permit required: Yes in most Seattle jurisdictions

    Anchor Bolts

    Many older homes are not bolted to their foundations, they simply rest on them. Adding anchor bolts and mudsill plates prevents the house from sliding during ground motion.

    Planning a project?

    Working out what your lot will allow, and what it will cost?

    Send David the address and a few lines about what you want. The first feasibility check is free and usually takes about a day: what the site and the code are likely to allow, and what to check first.

    Architect since 1996, member of the AIA and NCARB. Three Masonry Excellence Awards for commercial projects; the Carr residence was featured in Above The Lake and Lux magazines.

    Hillside Homes

    Homes on Seattle’s many hillsides with post-and-pier construction (common in Ravenna, Montlake, Queen Anne, and Bellevue hillside areas) are particularly vulnerable. Hillside bracing involves adding diagonal bracing and connection hardware between posts and the structure above.

    When Renovations Trigger Seismic Upgrades

    Major renovations in Seattle can trigger seismic upgrade requirements. Projects that increase floor area by more than 50% or that involve structural changes above the foundation may require seismic upgrades to the existing structure. An architect and structural engineer working together will determine what is required.

    Piper Cole Architects coordinates seismic engineering for renovation and addition projects. free feasibility check, call 425-753-6452.

    David Meade, AIA, NCARB
    Principal Architect, Piper Cole Architects · Kirkland, WA

    David Meade is a licensed architect (AIA, NCARB) who has worked as an architect since 1996, with three Masonry Excellence Awards for commercial projects and a residential practice on the Seattle Eastside. He has designed custom homes, additions, and ADUs in Kirkland, Bellevue, Redmond, and Seattle. Learn more about David →

    Residential architecture project by Piper Cole Architects, Seattle Eastside WA

    Talk to the architect

    Have a project in mind?

    Call David Meade directly. Licensed architect serving Kirkland, Bellevue, Seattle and the wider Eastside. David Meade has been an architect since 1996.

    Free feasibility check

    Send the address and what you have in mind. David replies within one business day with what the site and the code are likely to allow.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp