Guides

Are second story additions worth it in Seattle and on the Eastside?
Second stories run $350 to $550 per sq ft on the Eastside, and foundation work adds $30k to $100k. When going up pays off, and when it does not.
David Meade · September 17, 2026
Room addition cost in Kirkland and the Eastside
Bedroom additions $85k to $165k, primary suites $220k to $400k in Kirkland. Real 2026 ranges, permit timelines and where the money goes.
David Meade · September 17, 2026
Second story addition over a garage
Building over an attached garage is often the cheapest square footage you can add. Real 2026 Seattle costs, the slab problem, and when it works.
David Meade · September 17, 2026
Home Addition in Seattle: Architect vs. Contractor, Which Do You Need?
Home addition in Seattle: do you need an architect or a contractor first? How to decide, and what each brings. Piper Cole Architects, Kirkland WA.
David Meade · July 3, 2026
Second story addition in Bellevue: what the lot allows before you design
Second story addition in Bellevue? See how floor area, height and older walls decide it, with the arithmetic shown, then request a free feasibility check.
David Meade · July 2, 2026
Home addition Kirkland: what your lot lets you build
Planning a home addition in Kirkland? See the city's own rules on yards, coverage and permits, worked on one lot, then ask for a free feasibility check.
David Meade · July 1, 2026
Second story addition in Kirkland: what the lot allows before you design
Second story addition in Kirkland? See how floor area, height and older walls decide it, worked on one lot, then request a free feasibility check.
David Meade · July 1, 2026
Kitchen Addition Architect on Seattle’s Eastside
Kitchen addition architect on the Seattle Eastside. Expand and reconfigure with structural, permit-ready design from Piper Cole Architects.
David Meade · June 29, 2026
Second story addition in Seattle: what the lot allows and what the house must carry
Second story addition in Seattle: floor area, height, structure and permit, worked on a 4,500 sq ft lot. Call David Meade for a free first feasibility check.
David Meade · June 27, 2026
How Long Does a Home Addition Take in Seattle? Realistic 2026 Timeline
How long does a home addition take in Seattle? Phase-by-phase timeline: design, permits, bidding, construction: with realistic 2026 numbers from Piper.
David Meade · May 30, 2026
Second Story Addition vs. Ground Floor Addition: Which Is Right for Your Seattle Home?
Adding up vs. adding out: comparing second story and ground floor additions for Seattle homeowners. Cost, zoning, disruption, and ROI analysis.
David Meade · May 30, 2026
Home addition in Seattle: what your lot allows before you design
Planning a home addition in Seattle? See what setbacks, coverage and floor area allow under the 2026 rules, worked on one lot. Ask for a free check.
David Meade · May 27, 2026
What a Second Story Addition Costs in Seattle
What a second story really costs in Seattle, the foundation question that decides it, and when going up beats moving. Call David direct on 425 753 6452.
David Meade · May 27, 2026
What a Home Addition Costs in Seattle
What a Seattle addition costs by type in 2026, what pushes it up, the fees beyond construction, and an estimator for your own size. Call 425 753 6452.
David Meade · May 26, 2026
Next step
Have a project in mind?
Call David Meade directly. The first feasibility check is free and usually takes about a day.
Free feasibility check
Send the address and what you have in mind. David replies to you personally.