Quick answer: Piper Cole Architects designs luxury custom homes, additions, and whole-home remodels in Clyde Hill, WA, one of the Eastside’s most exclusive communities. Led by David Meade, AIA, NCARB, the firm specializes in view-oriented estates on Clyde Hill’s large lots, with deep knowledge of the city’s permitting, height, and view-corridor considerations.
TL;DR: Clyde Hill is a small, affluent city between Bellevue and Medina, known for large lots, privacy, and territorial views of Lake Washington, Seattle, and the Olympics. Building or remodeling here rewards an architect who designs around views, grade, and the city’s specific code, and who can shepherd a high-end project from concept through construction.
Designing for Clyde Hill
Clyde Hill sits on elevated terrain west of Bellevue, which is exactly what makes it special, and what makes design demanding. Homes here are shaped by:
View orientation
capturing Lake Washington, the Seattle skyline, and Olympic/Cascade views while respecting neighbors’ outlooks
Large lots & privacy
generous setbacks and landscaping create estate-like seclusion
Grade and topography
sloped sites call for thoughtful massing, daylight lower levels, and careful site work
Height & bulk rules
Clyde Hill regulates building height and structure to protect the neighborhood’s character and views
High-craft expectations
finishes, materials, and detailing at the luxury tier
We design each home to the site’s best views and the city’s standards from the first sketch, the approach that keeps a high-end project on track through permitting and construction.
Our services in Clyde Hill
Luxury custom homes
, ground-up estates designed around views and lifestyle. See our high-end residential work.
Whole-home remodels & additions
elevating existing Clyde Hill homes
Site & feasibility studies
what your lot can support under the city’s rules before you commit
Full-service design
, schematic design through construction administration (our custom home process)
Clyde Hill borders Medina and shares its luxury, view-driven character; see our related work on Medina luxury homes and, for waterfront-adjacent sites, shoreline regulations.
Planning a project?
Working out what your lot will allow, and what it will cost?
Send David the address and a few lines about what you want. The first basic feasibility check is free and usually takes about a day.
Architect since 1996, member of the AIA and NCARB. Three Masonry Excellence Awards for commercial projects; the Carr residence was featured in Above The Lake and Lux magazines.
Why work with Piper Cole
With more than 25 years of experience across the Eastside, we bring the design vision and the local permitting fluency that high-end Clyde Hill projects require, plus the construction-administration rigor to protect quality and budget through the build. We design for the long view: homes that fit their site, capture their views, and endure.
Ask for a free feasibility check with Piper Cole Architects to discuss your Clyde Hill project.
FAQ
Do you design custom homes in Clyde Hill, WA?
Yes. Piper Cole Architects designs luxury custom homes, additions, and remodels throughout Clyde Hill, with expertise in its large lots, view orientation, and city code.
What makes building in Clyde Hill different?
Clyde Hill’s elevated terrain, large lots, view corridors, and height/bulk regulations shape design more than in many Eastside cities, rewarding an architect who designs around views and grade from the start.
Does Piper Cole handle permitting in Clyde Hill?
Yes. We design to the city’s standards and guide projects through permitting, then provide construction administration during the build.
What areas near Clyde Hill do you serve?
We serve Clyde Hill, Medina, Bellevue, Kirkland, Hunts Point, Yarrow Point, Mercer Island, and the greater Seattle Eastside.
Sources consulted: City of Clyde Hill planning/building standards; Eastside luxury market context; Piper Cole Architects custom-home experience.




