Home / Services / Kitchen & Bathroom Remodel Architect Seattle

Architecture Services

Kitchen & Bathroom Remodel Architect Seattle Piper Cole Architects

25+Years Practicing
800+Projects Delivered
R&CResidential & Commercial
FreeInitial Consultation

Kitchen and bathroom renovations are among the most technically complex home improvement projects in the Seattle area. Structural walls, permit requirements, mechanical and plumbing systems, energy code compliance, and design coordination all come together in a small footprint. Piper Cole Architects provides architectural services for kitchen and bathroom remodels across Seattle, Kirkland, Bellevue, and the Eastside.

When Do You Need an Architect for a Kitchen Remodel?

You need an architect when your kitchen remodel involves:

  • Removing or moving a load-bearing wall
  • Expanding the kitchen footprint into adjacent space
  • Adding or relocating a window or exterior door
  • Relocating plumbing supply or drain lines
  • Upgrading electrical service for new high-draw appliances
  • Any work requiring a building permit in Seattle or the Eastside

Kitchen and Bathroom Remodel Costs in Seattle (2026)

Mid-range kitchen remodel:

$75,000 to $150,000

High-end kitchen remodel:

$150,000 to $350,000+

Primary bathroom renovation:

$45,000 to $120,000

Hall bathroom renovation:

$25,000 to $55,000

Architect fees:

$8,000 to $25,000 depending on scope

Scope of Architectural Services

  • Measured survey of existing conditions
  • Space planning and layout alternatives
  • Design development with cabinet layout and material selections
  • Permitted construction documents including structural, plumbing, and electrical
  • City permit submission and management
  • Construction administration and site visits

Start Your Remodel

Contact Piper Cole Architects for a free consultation. We will walk through your goals, identify what your project needs from a permitting standpoint, and give you a realistic scope and fee estimate.

Call: 425-753-6452 | Kirkland, WA

Frequently Asked Questions

Do I need an architect for a kitchen or bathroom remodel?

You need an architect when the remodel involves removing a load-bearing wall, expanding the footprint, adding or moving windows or doors, relocating plumbing, or any work that requires a building permit. Cosmetic updates that do not touch structure usually do not.

How much does a kitchen remodel cost in Seattle?

A mid-range kitchen remodel in Seattle runs $75,000 to $150,000 and a high-end remodel $150,000 to $350,000+. Architect fees for kitchen or bathroom projects typically add $8,000 to $25,000 depending on scope.

How much does a bathroom renovation cost?

A primary bathroom renovation in the Seattle area runs $45,000 to $120,000 and a hall bathroom $25,000 to $55,000, depending on finishes and whether plumbing or structure is changed.

Can you help with permits for my remodel?

Yes. We prepare permitted construction documents and manage the City permit submission for kitchen and bathroom remodels across Seattle, Kirkland, Bellevue, and the Eastside.

Start Here

Start Your Project

Free initial consultation, no obligation. Licensed architect serving Kirkland and the greater Seattle metro area since 2000.

Free Architecture Consultation — Kirkland, WA

Get Free Consultation 425 753 6452