Piper Cole Architects serves Des Moines, WA with residential and commercial architecture services. The Des Moines waterfront and marina area presents unique design opportunities for waterfront homes, bluff properties, and marine-adjacent commercial buildings. Call 425-753-6452 for a free consultation.
Ready to talk about your project?
Piper Cole Architects has designed 800+ Eastside projects since 2000. Get a free, no-pressure consultation with David Meade, AIA, NCARB.
Our Architecture Services
Full-service architecture for Des Moines, and the greater Seattle area: