Architect in Eastgate, Bellevue WA — Piper Cole Architects

Piper Cole Architects serves the Eastgate neighborhood and surrounding areas of southeast Bellevue with residential and commercial architecture services. Eastgate’s proximity to I-90, Bellevue College, and the Factoria shopping district creates diverse project opportunities. Call 425-753-6452 for a free consultation.

Ready to talk about your project?

Piper Cole Architects has designed 800+ Eastside projects since 2000. Get a free, no-pressure consultation with David Meade, AIA, NCARB.

Book a Free Consultation →
Call (425) 753-6452

Free Architecture Consultation — Piper Cole Architects, Kirkland WA

Get Free Consultation 📞 425-753-6452