Piper Cole Architects serves West Seattle neighborhoods including Alki, Admiral District, Morgan Junction, Fauntleroy, Delridge, and High Point with residential architecture services. West Seattle’s hillside lots offer dramatic views of Elliott Bay and the Olympic Mountains. ADU development is strong in the area driven by the peninsula’s limited housing supply and strong rental demand. Call 425-753-6452 for a free consultation.
Ready to talk about your project?
Piper Cole Architects has designed 800+ Eastside projects since 2000. Get a free, no-pressure consultation with David Meade, AIA, NCARB.
Our Architecture Services
Full-service architecture for West Seattle, and the greater Seattle area: