Home / Journal / What Architectural Drawings Include: A Complete Guide for Homeowners
May 30, 2026
What Architectural Drawings Include: A Complete Guide for Homeowners
When you hire an architect, you will receive a set of drawings. Understanding what those drawings include — and why each sheet is needed — helps you review them meaningfully and communicate with your architect and contractor.
Sheet Types in a Typical Residential Drawing Set
Cover Sheet (G-001)
Project information, drawing list, code summary, and general notes. Tells the building department everything they need to categorize the permit application.
Site Plan (A-001)
Shows the property in plan view — lot lines, existing and proposed structures, setbacks, parking, utility connections, drainage, and topography. Required for every permit application.
Floor Plans (A-1xx)
The most recognizable drawing type. Shows rooms, walls, doors, windows, stairs, and dimensions viewed from above. One plan per floor level.
Exterior Elevations (A-2xx)
Flat views of each side of the building showing exterior materials, window and door heights, roof slopes, and overall building appearance.
Building Sections (A-3xx)
Cut-through views showing how the building is assembled vertically — floor-to-floor heights, ceiling heights, structural elements, and insulation layers.
Wall Sections and Details (A-4xx)
Large-scale details showing how specific assemblies are constructed: how the foundation meets the wall, how the roof edge is finished, how windows are flashed.
Interior Elevations (A-5xx)
Flat views of specific interior walls — typically kitchens, bathrooms, and built-in casework — showing cabinet layout, countertops, and tile patterns.
Structural Drawings (S-xxx)
Produced by the structural engineer: foundation plan, floor framing plan, roof framing plan, and structural details. Required for all projects with structural elements.
Piper Cole Architects produces complete, coordinated drawing sets for all project types. Free consultation — call 425-753-6452.
Start Here
Start Your Project
Free initial consultation, no obligation. Licensed architect serving Kirkland and the greater Seattle metro area since 2000.