Home / Journal / Kitchen Bump-Out and Expansion in Seattle: Design Ideas and Costs
June 1, 2026
Kitchen Bump-Out and Expansion in Seattle: Design Ideas and Costs
A cramped kitchen is one of the most common frustrations in older Seattle homes. Bumping out or expanding the kitchen can transform how the whole house functions. Here are the options and what they cost.
📄 Table of Contents
The Bump-Out Option
A bump-out extends the kitchen a few feet beyond the existing wall, often cantilevered without a new foundation if small enough (typically under 2 to 3 feet). This adds counter space, room for an eating nook, or space for a larger island.
Cost: $25,000 to $75,000 depending on size and whether foundation work is needed.
The Full Kitchen Addition
A larger expansion adds a full room-sized footprint, often combining the kitchen with a family room or dining area in an open plan. This requires a new foundation and roof.
Cost: $120,000 to $250,000.
Opening to Adjacent Rooms
Sometimes the best solution is not adding square footage but removing a wall to connect the kitchen to a dining room or living room. This requires structural evaluation if the wall is load-bearing. See our guide on opening a load-bearing wall.
Permit Requirements
Any expansion of the footprint or structural change requires a building permit with architectural drawings. Relocating plumbing or electrical also triggers permit requirements.
See our kitchen and bathroom remodel service for full details.
Start Here
Start Your Project
Free initial consultation, no obligation. Licensed architect serving Kirkland and the greater Seattle metro area since 2000.