1. Home
  2. Blog
  3. Costs, Fees and Budgets

Costs, Fees and Budgets

Architect Cost as a Percentage of Construction: What It Really Means

By David Meade, AIA, NCARBJune 1, 20263 min read

On this page

    When an architect quotes a fee as “12 percent of construction cost,” many homeowners are unsure what that actually covers or whether it is reasonable. Here is a clear explanation.

    What the Percentage Covers

    A full-service percentage fee typically covers all five phases of architectural work: schematic design, design development, construction documents, bidding assistance, and construction administration. It usually does NOT include structural engineering, civil engineering, survey, or permit fees, which are billed separately.

    Typical Percentages in Seattle (2026)

    • New custom homes: 10 to 15%
    • Renovations and additions: 12 to 18% (higher because renovation is more complex per square foot)
    • Commercial projects: 8 to 12%
    • Small or simple projects: may be quoted as a fixed fee instead

    Planning a project?

    Working out what your lot will allow, and what it will cost?

    Send David the address and a few lines about what you want. The first basic feasibility check is free and usually takes about a day.

    Architect since 1996, member of the AIA and NCARB. Three Masonry Excellence Awards for commercial projects; the Carr residence was featured in Above The Lake and Lux magazines.

    Why Renovations Cost a Higher Percentage

    Renovation requires documenting existing conditions, designing around what is already there, and solving problems that only appear once walls are opened. This takes more design hours per dollar of construction than new construction.

    How to Evaluate a Percentage Fee

    Compare what is included. A 10% fee that stops at permit submission may be more expensive in practice than a 14% fee that includes full construction administration, because you will need to pay someone to oversee construction either way.

    Percentage vs. Fixed Fee

    For well-defined projects, a fixed fee gives budget certainty. For projects where scope is still evolving, a percentage scales naturally. See our full comparison: architect fee structures in Seattle.

    David Meade, AIA, NCARB
    Principal Architect, Piper Cole Architects · Kirkland, WA

    David Meade is a licensed architect (AIA, NCARB) who has worked as an architect since 1996, with three Masonry Excellence Awards for commercial projects and a residential practice on the Seattle Eastside. He has designed custom homes, additions, and ADUs in Kirkland, Bellevue, Redmond, and Seattle. Learn more about David →

    Talk to the architect

    Have a project in mind?

    Call David Meade directly. Licensed architect serving Kirkland, Bellevue, Seattle and the wider Eastside. David Meade has been an architect since 1996.

    Free feasibility check

    Send the address and what you have in mind. David replies to you personally.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp