Home / Services / Residential Architecture

Architecture Services

Residential Architecture

25+Years Practicing
800+Projects Delivered
R&CResidential & Commercial
FreeInitial Consultation

Residential Architecture in Seattle & Kirkland, WA

Piper Cole Architects has been designing exceptional homes across the Seattle metro area since 2000. With over 800 residential projects delivered, our award-winning team brings creativity, precision, and deep local knowledge to every commission.

Our Residential Services

Custom New Home Design

From the first sketch to move-in day, we design homes that reflect your vision and suit your site.

Home Additions

Expanding your home requires expertise in seamlessly integrating new with existing. We excel at additions that feel like they were always there.

Whole-Home Renovations

We reimagine spaces from the inside out, improving flow, light, and livability while honoring what makes your home special.

Interior Architecture

Staircases, built-ins, ceiling details, and spatial transitions — the interior decisions that define how a home feels.

Areas We Serve

We work with homeowners throughout the Seattle Eastside and greater Pacific Northwest, including Kirkland, Seattle, Bellevue, Redmond, Mercer Island, Issaquah, Sammamish, Bothell, and Woodinville.

Our Approach

Every residential project begins with listening. We take time to understand how you live, what you value, and how your home can better serve your daily life. From initial consultation through construction administration, we are your advocate and partner.

Frequently Asked Questions

How much does a residential architect cost in Seattle?

Architectural fees for residential projects in the Seattle area typically range from 8% to 15% of construction cost, depending on scope and complexity. We provide transparent fee proposals at the outset of every project.

Do I need an architect for a home addition in Washington State?

For additions over a certain square footage or that involve structural changes, Washington State and most local jurisdictions require stamped architectural drawings. An architect also ensures your addition meets code and adds lasting value to your home.

How long does the residential design process take?

A typical residential project moves through design and permitting in 6 to 12 months, depending on complexity and jurisdiction. We manage the schedule closely to keep your project on track.

Start Your Residential Project

Ready to talk about your home? Schedule a free consultation with Piper Cole Architects today.

Explore Our Other Services

Residential Architecture

Custom homes, ADUs, and additions across the Seattle Eastside.

Learn More

Commercial Architecture

Office, retail, and mixed-use projects in the greater Seattle area.

Learn More

Interior Architecture

Spatial planning, interior detailing, and finish selections.

Learn More

Renovation & Restoration

Historic renovations and whole-home remodels.

Learn More

Our Design Process

See how we guide projects from concept to completion.

Learn More

Start Here

Start Your Project

Free initial consultation, no obligation. Licensed architect serving Kirkland and the greater Seattle metro area since 2000.

Free Architecture Consultation — Kirkland, WA

Get Free Consultation 425 753 6452