Renovation & Restoration Architecture in Seattle, WA
Transforming an existing building requires a different kind of expertise than designing from scratch. You must read what is already there — understand its structure, its character, its potential — and bring it forward. Piper Cole Architects has been doing this in the Seattle metro area for over 25 years, delivering renovations and restorations that honor what is special about a space while making it fully contemporary.
Our Renovation Services
Whole-Home Renovation
Comprehensive transformations of existing homes, reimagining layout, light, and livability from the ground up.
Kitchen & Bathroom Architecture
Precision design for the spaces that define how a home lives day to day.
Structural Renovation
Opening up floor plans, adding levels, modifying rooflines — the interventions that change everything.
Historic Restoration
Returning historic properties to their original character using period-appropriate materials and methods while meeting current code.
Commercial Renovation
Upgrading older commercial spaces for modern use, ADA compliance, and energy efficiency.
The Challenge of Renovation
Renovation projects often reveal surprises — structural conditions, outdated systems, materials that must be handled carefully. Our experience across hundreds of existing-building projects means we plan for the unexpected and keep your project on schedule and budget even when the walls reveal something new.
Areas We Serve
We complete renovation and restoration projects throughout the Seattle Eastside and Pacific Northwest, including Kirkland, Seattle, Bellevue, Mercer Island, and surrounding communities.
Frequently Asked Questions
Do I need an architect for a home renovation in Seattle?
For renovations involving structural changes, additions, or changes to the building envelope, you will typically need stamped architectural drawings for a permit. An architect also protects your investment by anticipating problems and ensuring quality.
How much does a home renovation cost in Seattle?
Renovation costs in the Seattle area vary widely by scope. A kitchen renovation may run $80,000 to $200,000; a whole-home renovation can range from $200 to $600+ per square foot. We provide honest budget guidance at the outset of every project.
Ready to Transform Your Space?
Contact Piper Cole Architects to schedule a free consultation about your renovation or restoration project.
Explore Our Other Services
Commercial Architecture
Office, retail, and mixed-use projects in the greater Seattle area.
Learn MoreFrom Our Blog
- How Much Does It Cost to Hire an Architect in Seattle? (2026)
- Complete Guide to Custom Home Design in the Seattle Area
- Residential vs. Commercial Architecture: What’s the Difference?
- Seattle Architecture Permits: What Homeowners Need to Know
- Before & After: Renovation Architecture in the Seattle Area
Start Here
Start Your Project
Free initial consultation, no obligation. Licensed architect serving Kirkland and the greater Seattle metro area since 2000.