Seattle has hundreds of designated landmarks and several historic districts. If you own or are purchasing a landmarked building, understanding the preservation review process is essential before planning any work.
📄 Table of Contents
How Seattle Landmarks Work
The Seattle Landmarks Preservation Board designates individual landmarks and administers controls over what can and cannot be changed on designated properties. Designation protects the “significant character-defining features” of a building — not necessarily every element of it.
Certificate of Approval
Any exterior changes to a designated landmark require a Certificate of Approval from the Landmarks Preservation Board. This includes repainting, reroofing, window replacement, and additions. Interior changes that affect character-defining features also require approval.
Design Standards for Landmark Renovations
Landmark renovations are guided by the Secretary of the Interior’s Standards for Rehabilitation, which allow for modernization and new use while preserving historic character. New additions should be distinguishable from the historic fabric but compatible in scale and materials.
Historic Districts
Seattle’s Pike Place Market Historic District, Pioneer Square Preservation District, and Columbia City Landmark District each have their own design guidelines and review processes in addition to or in lieu of standard landmark designation.
Working with a Preservation Architect
Landmark renovation requires an architect familiar with preservation standards, the Certificate of Approval process, and the specific sensitivities of the building’s historic character. Piper Cole Architects has experience with historic renovation projects in Seattle. Free consultation — call 425-753-6452.
Ready to Start Your Project?
Piper Cole Architects offers a free initial consultation for all project types — residential, commercial, ADU, and renovation. No obligation. Based in Kirkland, WA. Serving the entire Seattle metro area since 2000.
Ready to talk about your project?
Piper Cole Architects has designed 800+ Eastside projects since 2000. Get a free, no-pressure consultation with David Meade, AIA, NCARB.