Now covered in more depth
A cramped kitchen is one of the most common frustrations in older Seattle homes. Bumping out or expanding the kitchen can transform how the whole house functions. Here are the options and what they cost.
The Bump-Out Option
A bump-out extends the kitchen a few feet beyond the existing wall, often cantilevered without a new foundation if small enough (typically under 2 to 3 feet). This adds counter space, room for an eating nook, or space for a larger island.
Cost: $25,000 to $75,000 depending on size and whether foundation work is needed.
The Full Kitchen Addition
A larger expansion adds a full room-sized footprint, often combining the kitchen with a family room or dining area in an open plan. This requires a new foundation and roof.
Cost: $120,000 to $250,000.
Planning a project?
Want a number for your addition?
Send David the address and a few lines about what you want. The first feasibility check is free and usually takes about a day: what the site and the code are likely to allow, and what to check first.
Architect since 1996, member of the AIA and NCARB. Three Masonry Excellence Awards for commercial projects; the Carr residence was featured in Above The Lake and Lux magazines.
Opening to Adjacent Rooms
Sometimes the best solution is not adding square footage but removing a wall to connect the kitchen to a dining room or living room. This requires structural evaluation if the wall is load-bearing. See our guide on opening a load-bearing wall.
Permit Requirements
Any expansion of the footprint or structural change requires a building permit with architectural drawings. Relocating plumbing or electrical also triggers permit requirements.
See our kitchen and bathroom remodel service for full details.


