1. Home
  2. Blog
  3. Home Additions and Second Stories

Home Additions and Second Stories

Sunroom Addition in Seattle: Design Options and 2026 Costs

By David Meade, AIA, NCARBJune 1, 20263 min read

On this page

    A sunroom brings light and a connection to the outdoors into a Seattle home, valuable in a climate with long gray winters. Here is a guide to sunroom design and costs.

    Three-Season vs. Year-Round Sunrooms

    • Three-season sunroom: Not fully insulated or heated. Comfortable spring through fall. Lower cost but unusable in cold months.
    • Year-round sunroom: Fully insulated, heated, and built to energy code. Functions as true living space in all seasons. This is the right choice for most Seattle homes given our climate.

    Glazing Strategy for the Northwest

    Seattle’s climate calls for high-performance glazing. Large windows capture limited winter light, but low-quality glass loses heat and creates condensation. A year-round sunroom needs double or triple-pane low-E glazing. South-facing orientation maximizes passive solar gain.

    Planning a project?

    Want a number for your addition?

    Send David the address and a few lines about what you want. The first feasibility check is free and usually takes about a day: what the site and the code are likely to allow, and what to check first.

    Architect since 1996, member of the AIA and NCARB. Three Masonry Excellence Awards for commercial projects; the Carr residence was featured in Above The Lake and Lux magazines.

    Permit Requirements

    A sunroom is a room addition and requires a building permit with architectural drawings, energy code compliance, and structural design. A year-round sunroom must meet the same insulation and energy standards as any heated room.

    Cost (2026)

    • Three-season sunroom: $35,000 to $75,000
    • Year-round insulated sunroom: $80,000 to $180,000
    • Architect fees: $8,000 to $20,000

    Design Integration

    The best sunrooms feel like an integral part of the home, not a tacked-on glass box. Matching rooflines, materials, and proportions to the existing home is key. See our home additions service.

    David Meade, AIA, NCARB
    Principal Architect, Piper Cole Architects · Kirkland, WA

    David Meade is a licensed architect (AIA, NCARB) who has worked as an architect since 1996, with three Masonry Excellence Awards for commercial projects and a residential practice on the Seattle Eastside. He has designed custom homes, additions, and ADUs in Kirkland, Bellevue, Redmond, and Seattle. Learn more about David →

    Talk to the architect

    Have a project in mind?

    Call David Meade directly. Licensed architect serving Kirkland, Bellevue, Seattle and the wider Eastside. David Meade has been an architect since 1996.

    Free feasibility check

    Send the address and what you have in mind. David replies within one business day with what the site and the code are likely to allow.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp