When seeking drawings for a project, Seattle homeowners often encounter both architects and draftsmen (drafters), at very different price points. Understanding the difference helps you choose correctly.
What a Draftsman Does
A draftsman produces technical drawings, often using CAD software. A skilled draftsman can prepare permit drawings for straightforward projects. However, a draftsman is not a licensed design professional, does not carry professional liability, and is limited in the types of projects they can legally stamp.
What an Architect Does
A licensed architect provides design expertise plus the legal authority to stamp drawings for any project type. Architects are trained in design, building science, code, structural coordination, and the full process from concept through construction. They carry professional liability insurance.
Planning a project?
Working out what your lot will allow, and what it will cost?
Send David the address and a few lines about what you want. The first feasibility check is free and usually takes about a day: what the site and the code are likely to allow, and what to check first.
Architect since 1996, member of the AIA and NCARB. Three Masonry Excellence Awards for commercial projects; the Carr residence was featured in Above The Lake and Lux magazines.
When a Draftsman Is Sufficient
- Very simple, code-straightforward projects where the design is already determined
- Projects that legally do not require an architect’s stamp (some small residential work in Washington)
When You Need an Architect
- Any project where design quality matters to the outcome and value
- Commercial projects and most multi-family
- Structurally complex work
- Projects requiring an architect’s stamp by code
- When you want professional accountability
The Cost Difference
Draftsmen charge less, but the savings can be illusory if the result is a poorly designed project, code problems at permit review, or no design expertise to maximize your investment. See also our comparison of architect vs. home designer.
Home Designer or Residential Designer: The Third Option
A home designer is not a licensed professional in Washington State, anyone can use this title without specific education, examination, or licensure. Quality ranges enormously. Some home designers have extensive training and produce excellent work; others do not.
Scope of practice: In Washington, unlicensed designers can prepare drawings for certain residential projects (single-family homes and small multi-family). They cannot prepare drawings for commercial buildings, many multi-family projects, or projects requiring engineering.
Limitation: A home designer cannot stamp drawings that require an architect’s seal, and their work is not covered by professional liability insurance.
When to Hire a Licensed Architect
- Any commercial project
- Multi-family projects (3+ units)
- Projects with structural complexity (load-bearing changes, second stories)
- Historic properties subject to landmark review
- Projects where engineering coordination is needed
- When you want professional accountability and licensed expertise
Piper Cole Architects is a licensed architecture firm in Washington State. Contact us for a free feasibility check. Call 425-753-6452.




