Multi-unit residential building with paneled cladding, a multifamily design near Seattle
  1. Home
  2. Blog
  3. Commercial and Multifamily

Commercial and Multifamily

Can You Build an ADU on a Multifamily Lot in Seattle? (2026)

By David Meade, AIA, NCARBMay 30, 20263 min read

On this page

    Washington State’s recent housing legislation has significantly expanded what can be built on residential lots, including lots previously zoned for single-family use only. Here is what Seattle homeowners and investors need to know about ADUs on multifamily-eligible lots in 2026.

    What Changed Under HB 1110

    Washington State’s HB 1110 (effective 2023-2024) requires cities with more than 25,000 residents to allow at minimum:

    • Duplexes on all residential lots previously zoned single-family
    • Fourplexes within a quarter mile of frequent transit
    • Six units within a half mile of major transit

    Seattle has been implementing these changes through its One Seattle Comprehensive Plan update, which affects how ADUs layer onto newly-permitted density.

    Multi-unit residential building with paneled cladding, a multifamily design near Seattle

    ADUs on Duplex Lots

    On lots now eligible for duplex development, ADUs may still be permitted as additional units depending on the zone, lot size, and total unit count allowed. Seattle is working through the details of how ADU rules interact with the new density allowances, this is an area where an experienced architect is essential to understand what is actually achievable on your specific parcel.

    Planning a project?

    Wondering what an ADU on your lot would cost?

    Send David the address and a few lines about what you want. The first basic feasibility check is free and usually takes about a day.

    Architect since 1996, member of the AIA and NCARB. Three Masonry Excellence Awards for commercial projects; the Carr residence was featured in Above The Lake and Lux magazines.

    Impact on ADU Strategy

    For investors and homeowners with larger lots, the new density rules create opportunities to build more units than previously allowed. The combination of a duplex plus two ADUs (four units total) on a single lot is becoming viable on more Seattle parcels. This fundamentally changes the economics of ADU development.

    Piper Cole Architects stays current on Seattle’s evolving housing code and can assess what is buildable on your specific lot. Contact us for a free feasibility consultation. Call 425-753-6452.

    Authoritative sources

    Regulatory requirements referenced in this guide are set by the official agencies below. Rules change, always confirm current requirements with the source:

    David Meade, AIA, NCARB
    Principal Architect, Piper Cole Architects · Kirkland, WA

    David Meade is a licensed architect (AIA, NCARB) who has worked as an architect since 1996, with three Masonry Excellence Awards for commercial projects and a residential practice on the Seattle Eastside. He has designed custom homes, additions, and ADUs in Kirkland, Bellevue, Redmond, and Seattle. Learn more about David →

    Multi-unit residential building with paneled cladding, a multifamily design near Seattle

    Talk to the architect

    Have a project in mind?

    Call David Meade directly. Licensed architect serving Kirkland, Bellevue, Seattle and the wider Eastside. David Meade has been an architect since 1996.

    Free feasibility check

    Send the address and what you have in mind. David replies to you personally.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp