Home / Journal / ADU Architect in Redmond, WA

June 1, 2026

ADU Architect in Redmond, WA Design and Permits | Piper Cole Architects

Redmond, WA is one of the strongest markets for ADU development in the Seattle area — driven by tech-sector housing demand, large residential lots, and a permit process that is typically faster than Seattle. Piper Cole Architects has designed and permitted ADUs throughout Redmond.

25+Years Practicing
800+Projects Delivered
R&CResidential & Commercial
FreeInitial Consultation

ADU Types in Redmond

Detached ADU (DADU):

Freestanding backyard cottage — most common type for Redmond’s larger lots

Garage Conversion ADU:

Converting an existing detached garage — most cost-effective

Attached ADU:

Basement conversion or addition to primary home

Redmond ADU Permit Timeline

City of Redmond ADU permit review typically takes 4-8 weeks — significantly faster than Seattle’s 8-14 weeks. Redmond has implemented online permit submission which has further streamlined the process. Piper Cole Architects knows the Redmond Development Center staff and current code interpretations.

ADU Rental Market in Redmond (2026)

Redmond ADU rental rates benefit from proximity to Microsoft, Google, Meta, and other tech employers. 1-bedroom ADU rents: $1,900-$2,600/month. 2-bedroom ADU rents: $2,500-$3,400/month. Strong ROI fundamentals for ADU investment in Redmond.

Free ADU Consultation

See our ADU service or contact us for a free feasibility consultation. Call 425-753-6452.

DM
David Meade, AIA, NCARB
Principal Architect, Piper Cole Architects · Kirkland, WA

David Meade is a licensed architect (AIA, NCARB) with 25+ years of residential design experience across the Seattle Eastside. He has designed custom homes, additions, and ADUs in Kirkland, Bellevue, Redmond, and Seattle. Learn more about David →

Authoritative sources

Regulatory requirements referenced in this guide are set by the official agencies below. Rules change — always confirm current requirements with the source:

Start Here

Start Your Project

Free initial consultation, no obligation. Licensed architect serving Kirkland and the greater Seattle metro area since 2000.

Free Architecture Consultation — Kirkland, WA

Get Free Consultation 425 753 6452