1. Home
  2. Blog
  3. ADUs, DADUs and Backyard Cottages

ADUs, DADUs and Backyard Cottages

Architect in Issaquah, WA: Home Additions and ADU Design

By David Meade, AIA, NCARBJune 1, 20263 min read

On this page

    Issaquah, WA sits at the gateway to the Cascade Mountains and offers some of the most dramatic residential settings in the Seattle area. From Issaquah Highlands’ planned community to older neighborhoods closer to downtown, Piper Cole Architects serves the full range of Issaquah residential projects.

    Issaquah Architecture Services

    Home Additions

    Second stories, primary suites, and great room additions on Issaquah’s typical larger lots

    ADU Design

    DADUs and attached ADUs under City of Issaquah codes

    Custom Home Design

    New construction across Issaquah’s varied terrain

    Renovation

    Updating older homes in established Issaquah neighborhoods

    Issaquah Highlands HOA Considerations

    In the Issaquah Highlands, the Architectural Review Committee reviews exterior designs, and the city requires its stamp on the site plan and elevations before you submit the building permit. The city rules are in the Issaquah zoning guide. Materials, colors, massing, and roof forms are all subject to review. Piper Cole Architects is familiar with the Issaquah Highlands design guidelines and can design to meet those standards from the start.

    Planning a project?

    Wondering what an ADU on your lot would cost?

    Send David the address and a few lines about what you want. The first basic feasibility check is free and usually takes about a day.

    Architect since 1996, member of the AIA and NCARB. Three Masonry Excellence Awards for commercial projects; the Carr residence was featured in Above The Lake and Lux magazines.

    Issaquah Permit Process

    The City of Issaquah targets 4 weeks for the first review of a single-family permit, 3 weeks for the second and 1 week for each round after, counted from fee payment (April 2026), so total time runs longer. Issaquah is in King County with access to Eastside utility infrastructure.

    free feasibility check, call 425-753-6452

    Authoritative sources

    Regulatory requirements referenced in this guide are set by the official agencies below. Rules change, always confirm current requirements with the source:

    David Meade, AIA, NCARB
    Principal Architect, Piper Cole Architects · Kirkland, WA

    David Meade is a licensed architect (AIA, NCARB) who has worked as an architect since 1996, with three Masonry Excellence Awards for commercial projects and a residential practice on the Seattle Eastside. He has designed custom homes, additions, and ADUs in Kirkland, Bellevue, Redmond, and Seattle. Learn more about David →

    Talk to the architect

    Have a project in mind?

    Call David Meade directly. Licensed architect serving Kirkland, Bellevue, Seattle and the wider Eastside. David Meade has been an architect since 1996.

    Free feasibility check

    Send the address and what you have in mind. David replies to you personally.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp