ADU Design in Kirkland, WA: Complete Guide for 2026

Kirkland is one of the best cities on the Eastside for ADU development — large lots, strong rental demand, a faster permit process than Seattle, and a location at the heart of the tech employment corridor. Piper Cole Architects is headquartered in Kirkland and has permitted more ADUs here than anywhere else in our service area.

Kirkland ADU Types and Rules (2026)

  • DADU (backyard cottage): Up to 1,000 sq ft, 18 ft max height, 5 ft rear and side setbacks
  • Attached ADU: Basement conversion, garage conversion, or addition — no separate size limit beyond overall lot coverage
  • Both types: Allowed on one lot simultaneously in most Kirkland residential zones

Kirkland ADU Permit Process

City of Kirkland ADU permits typically process in 4-8 weeks — one of the faster jurisdictions on the Eastside. Kirkland uses an online permit portal. Piper Cole Architects has established relationships with Kirkland permit staff and submits complete, code-compliant packages that minimize correction cycles.

ADU Rental Income in Kirkland (2026)

  • Studio ADU: $1,500-$2,000/month
  • 1-bedroom ADU: $2,000-$2,700/month
  • 2-bedroom ADU: $2,600-$3,400/month

ADU Project Costs in Kirkland

  • Garage conversion ADU: $90,000-$175,000
  • Detached backyard cottage: $260,000-$450,000
  • Architect fees: $15,000-$32,000

Ready to start? See our ADU service or get a free consultation. We are in Kirkland — call 425-753-6452.

Ready to talk about your project?

Piper Cole Architects has designed 800+ Eastside projects since 2000. Get a free, no-pressure consultation with David Meade, AIA, NCARB.

Book a Free Consultation →
Call (425) 753-6452

DM
David Meade, AIA, NCARB
Principal Architect, Piper Cole Architects · Kirkland, WA

David Meade is a licensed architect (AIA, NCARB) with 20+ years of residential design experience across the Seattle Eastside. He has designed custom homes, additions, and ADUs in Kirkland, Bellevue, Redmond, and Seattle. Learn more about David →

Free Architecture Consultation — Piper Cole Architects, Kirkland WA

Get Free Consultation 📞 425-753-6452