1. Home
  2. Blog
  3. Working With an Architect

Working With an Architect

Architect vs. General Contractor in Seattle: Who Does What?

By David Meade, AIA, NCARBMay 29, 20263 min read

On this page

    One of the most common points of confusion for first-time homeowners planning a major project is understanding the difference between an architect and a general contractor, and why you typically need both.

    What an Architect Does

    An architect is a licensed design professional who translates your goals into buildable drawings. Their work includes:

    • Designing the spaces, layout, and appearance of the building
    • Producing permitted construction documents
    • Managing the permit process with the city
    • Coordinating structural and mechanical engineers
    • Reviewing contractor work during construction to verify it matches the drawings

    An architect’s primary deliverable is drawings and specifications. They do not build.

    What a General Contractor Does

    A general contractor (GC) builds what the architect draws. Their work includes:

    • Bidding the project based on permit drawings
    • Hiring and managing subcontractors (framing, plumbing, electrical, etc.)
    • Ordering and managing materials
    • Managing the construction schedule and budget
    • Pulling the building permit and managing inspections

    A GC’s primary deliverable is a completed building.

    Planning a project?

    Working out what your lot will allow, and what it will cost?

    Send David the address and a few lines about what you want. The first basic feasibility check is free and usually takes about a day.

    Architect since 1996, member of the AIA and NCARB. Three Masonry Excellence Awards for commercial projects; the Carr residence was featured in Above The Lake and Lux magazines.

    Do You Always Need Both?

    For projects requiring a building permit, additions, ADUs, new construction, structural renovations, you will need both. The permit requires architectural drawings. Construction requires a licensed contractor.

    For cosmetic work (paint, floors, cabinet replacement that does not move walls) you can go straight to a contractor. But the moment you are moving walls, adding space, or touching structure, you need an architect first.

    Design-Build: A Third Option

    Some firms combine architecture and construction under one contract. This can streamline communication but reduces competitive bidding. See our post on architect vs. design-build for a full comparison.

    Piper Cole Architects has strong relationships with quality general contractors throughout the Seattle metro area and is happy to recommend contractors who are a good fit for your project and budget. Contact us for a free feasibility check. Call 425-753-6452.

    Related guide: How to Choose a General Contractor on the Eastside.

    David Meade, AIA, NCARB
    Principal Architect, Piper Cole Architects · Kirkland, WA

    David Meade is a licensed architect (AIA, NCARB) who has worked as an architect since 1996, with three Masonry Excellence Awards for commercial projects and a residential practice on the Seattle Eastside. He has designed custom homes, additions, and ADUs in Kirkland, Bellevue, Redmond, and Seattle. Learn more about David →

    Talk to the architect

    Have a project in mind?

    Call David Meade directly. Licensed architect serving Kirkland, Bellevue, Seattle and the wider Eastside. David Meade has been an architect since 1996.

    Free feasibility check

    Send the address and what you have in mind. David replies to you personally.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp