Residential architecture project by Piper Cole Architects, Seattle Eastside WA
  1. Home
  2. Blog
  3. ADUs, DADUs and Backyard Cottages

ADUs, DADUs and Backyard Cottages

Kirkland, WA ADU Rules 2026: What You Can Build on Your Lot

By David Meade, AIA, NCARBMay 30, 20263 min read

On this page

    Kirkland, WA has updated its ADU ordinance in recent years to align with Washington State’s expanded ADU legislation. Here is a current guide to what you can build, where, and what the process looks like.

    ADU Types Allowed in Kirkland

    Detached ADU (DADU):

    A freestanding structure in the backyard or side yard

    Attached ADU:

    An addition to the primary home, basement conversion, attached unit, or garage conversion

    Both types:

    Kirkland allows one of each type per lot in residential zones

    Kirkland DADU Size Limits (2026)

    Maximum size:

    1,000 sq ft

    Maximum height:

    18 feet in most residential zones

    Minimum setbacks:

    5 ft rear, 5 ft side in most zones

    Planning a project?

    Wondering what an ADU on your lot would cost?

    Send David the address and a few lines about what you want. The first feasibility check is free and usually takes about a day: what the site and the code are likely to allow, and what to check first.

    Architect since 1996, member of the AIA and NCARB. Three Masonry Excellence Awards for commercial projects; the Carr residence was featured in Above The Lake and Lux magazines.

    How Kirkland Differs from Seattle

    • Kirkland’s maximum DADU height (18 ft) is lower than Seattle’s (24 ft with pitched roof)
    • Kirkland permit review is generally faster than SDCI (5-9 weeks vs. 8-14 weeks)
    • Kirkland’s fee schedule differs from Seattle’s, often lower for smaller projects

    Kirkland ADU Permit Process

    ADUs in Kirkland are permitted through the City of Kirkland’s Planning and Building Department. The process requires a site plan, architectural drawings, structural drawings, and energy calculations. Piper Cole Architects is headquartered in Kirkland and has permitted numerous ADUs with the city. We know the process, the staff, and the common correction points.

    See our ADU design service or contact us for a free feasibility check on your Kirkland ADU. Call 425-753-6452.

    Authoritative sources

    Regulatory requirements referenced in this guide are set by the official agencies below. Rules change, always confirm current requirements with the source:

    David Meade, AIA, NCARB
    Principal Architect, Piper Cole Architects · Kirkland, WA

    David Meade is a licensed architect (AIA, NCARB) who has worked as an architect since 1996, with three Masonry Excellence Awards for commercial projects and a residential practice on the Seattle Eastside. He has designed custom homes, additions, and ADUs in Kirkland, Bellevue, Redmond, and Seattle. Learn more about David →

    Residential architecture project by Piper Cole Architects, Seattle Eastside WA

    Talk to the architect

    Have a project in mind?

    Call David Meade directly. Licensed architect serving Kirkland, Bellevue, Seattle and the wider Eastside. David Meade has been an architect since 1996.

    Free feasibility check

    Send the address and what you have in mind. David replies within one business day with what the site and the code are likely to allow.

      What are you planning?
      Your details

      No obligation. Your details go to David only. See the privacy policy.

      Chat with David on WhatsApp