Lake Chelan Residence: drive and garage
  1. Home
  2. Projects
  3. Lake Chelan Residence

Custom Home · Waterfront

Lake Chelan Residence

LocationLake Chelan
TypeCustom Home
StatusDesign renderings
ArchitectDavid Meade, AIA

The project

Lake Chelan Residence

A single-level house at Lake Chelan arranged as a series of gabled and low-slope pavilions in wood and pale panel, with a three-car garage and a living wing that opens to a lower terrace.

Related services: Custom Home Design

Key features

Levels
1 storey
Highlight
3-car garage
  1. 01Single-level house of linked pavilions
  2. 02Gabled and low-slope roofs
  3. 03Wood and pale panel cladding
  4. 04Three-car garage
  5. 05Living wing over a lower terrace

Gallery

8 images

Select any image to view it full screen.

Lake Chelan Residence: rear elevation at dusk

Next step

Start a project like Lake Chelan Residence

The first feasibility check is free and usually takes about a day.

Free feasibility check

Send the address and what you have in mind. David replies to you personally.

    What are you planning?
    Your details

    No obligation. Your details go to David only. See the privacy policy.

    Chat with David on WhatsApp