Now covered in more depth
House Extension in Seattle: Design Options and What It Costs
A house extension, any addition that expands the footprint of your existing home, is one of the most effective ways to gain space in a Seattle neighborhood where moving is expensive and good locations are rare. Extensions range from a simple bump-out of $60,000 to a complex multi-story addition of $500,000 or more.

Types of House Extensions in Seattle
Rear Extension
The most common type. Extending the rear of the home typically creates an expanded kitchen and family room. In Seattle, rear setbacks in single-family zones are usually 25 feet, leaving varying amounts of buildable area depending on the lot depth. Cost: $150,000 to $350,000 for a 400 to 600 square foot rear addition at mid-range finishes.
Side Extension
Less common due to tighter side setbacks (5 to 7 feet in most Seattle zones), but side extensions can add a bedroom, expand a kitchen, or create a mudroom entry. They are often combined with a rear extension for an “L-shaped” addition. Cost: $100,000 to $200,000 for a modest side extension.
Two-Story Extension
Adding two stories at the rear of the home maximizes the addition square footage per square foot of lot coverage used. A two-story rear addition might add 800 to 1,200 square feet of living space with a kitchen and family room below and two bedrooms above. Cost: $350,000 to $600,000.
Garage Extension
Extending a garage, widening from one car to two, deepening for storage, or adding living space above, is often a standalone project. A garage with a bonus room above can add living space for $120,000 to $250,000 depending on the finish level.
Planning a project?
Working out what your lot will allow, and what it will cost?
Send David the address and a few lines about what you want. The first feasibility check is free and usually takes about a day: what the site and the code are likely to allow, and what to check first.
Architect since 1996, member of the AIA and NCARB. Three Masonry Excellence Awards for commercial projects; the Carr residence was featured in Above The Lake and Lux magazines.
Seattle Zoning Rules That Affect Extensions
Before designing an extension, an architect reviews your lot for:
Setbacks:
Minimum distances from property lines. Front, rear, and side setbacks vary by zone and lot configuration.
Lot coverage:
Maximum percentage of the lot that can be covered by structures. Typical single-family zones allow 35 to 40% lot coverage including the house and any outbuildings.
Floor area ratio (FAR):
Some zones limit total floor area as a multiple of lot area.
Height limits:
Two-story extensions must comply with maximum height limits, which vary by zone.
An architect identifies these constraints upfront so the design achieves the maximum allowable extension. Read our guide on Seattle zoning for homeowners.

The Permit Process for a House Extension in Seattle
All house extensions in Seattle require a building permit. The permit application requires architectural drawings, structural engineering, and energy compliance documentation. Seattle’s standard plan review currently runs 8 to 12 weeks for residential additions. An architect prepares the full permit set and manages the submittal and any reviewer comments.
Learn more about hiring an architect for a home addition and home addition costs in Seattle.


