Key takeaways
- RCW 18.08.410(5) lets any person design a residential building of up to four dwelling units, regardless of size, and a garage or shed beside it.
- The permit office is the second test. Seattle’s SDCI says a stamp on house drawings is rare and “subject to our approval”; Bellevue says its plans examiner “may require” a stamp when structural changes are made.
- An engineer’s stamp comes in at specific lines. For an interior alteration on Seattle’s quick permit, a new header over a bearing wall needs one past 14 feet under one story and roof, or past 8 feet under two stories and roof.
- A contractor or owner may draw plans for an exempt project, but cannot alter sealed drawings, and a second story does not qualify for Seattle’s quick permit.
Short answer: RCW 18.08.410(5) says the architect licensing chapter does not prevent any person from doing design work on a residential building of up to and including four dwelling units, regardless of size, so a house falls inside the exemption. What decides your project is the permit office. Seattle’s SDCI and Bellevue can ask for plans stamped by a Washington architect or engineer when the work is structural or complex, Redmond asks for stamped calculations when it requires them, and a second story goes to plan review rather than the quick permit, while a wider opening in a bearing wall can cross a printed span line. Below are the statute, each office’s own wording, four worked projects, and the cases where you can do without an architect. Piper Cole designs and administers construction; I do not build.
The sources for this page were read on 14 November 2026: the Washington statutes, the Department of Licensing and Attorney General pages, SDCI’s tips and the 2021 Seattle Residential Code, the Bellevue, Kirkland, Redmond and Sammamish permit pages and checklists, and the State Register notice and State Building Code Council schedule for the 2024 residential code. Codes and checklists change, so confirm with your permit office before you rely on a line.
What the state statute says
Washington’s architect licensing law is chapter 18.08 RCW. Section 18.08.410 lists what that chapter does not affect or prevent. Four items matter to a homeowner:
| Subsection | What the chapter does not prevent | Limit in the text |
|---|---|---|
| 18.08.410(5) | Design work, including construction documents and administering the contract, for erecting, enlarging, repairing or altering a structure | Regardless of size, if it is a residential building of up to and including four dwelling units, a farm building, or a structure used with or auxiliary to one, such as a garage, barn or shed |
| 18.08.410(3) | Construction, alteration or supervision of construction by contractors registered under chapter 18.27 RCW, and preparing shop drawings for it | Contractors registered under chapter 18.27 RCW or their superintendents |
| 18.08.410(6) | Design work and construction documents for a building of any occupancy | Up to a total building size of 4,000 square feet, “except as otherwise provided in this section” |
| 18.08.410(7) | Design work for alterations or repairs inside a larger building | Project not more than 4,000 square feet, and the design does not affect life safety or structural systems; simultaneous projects combined may not exceed 4,000 |
The Department of Licensing’s FAQ works examples. A 5,000 square foot single-family house needs no architect’s seal on its permit documents. A 5,000 square foot residence with three dwelling units needs none either. Renovating 2,000 square feet inside a single-family building larger than 4,000 square feet needs none. For a non-residential building the line is the 4,000 square foot total: an addition of 550 square feet to a 3,600 square foot restaurant makes 3,600 + 550 = 4,150 square feet, so the plans need a registered design professional’s seal.
Two limits sit beside the exemption. First, DOL’s FAQ says the building code gives building officials authority to require submittal documents prepared by registered design professionals, so a permit office can still ask. Second, DOL says Washington-registered architects must seal and sign all drawings they prepare when filed with public authorities, exempt project or not. The exemption removes the state license requirement for the designer. It does not tell the permit office what to accept.
What the permit office decides
Seattle. SDCI’s Tip 101, updated June 30, 2026, says the Seattle Residential Code “typically does not require” Washington-licensed designers, such as architects and structural engineers, for single-family and duplex plan documents. It adds that complex architectural and structural designs for new buildings and alterations to existing homes are developed by an engineer, and that the prescriptive route can be cumbersome except for very simple structures. SDCI’s house additions page says house drawings rarely require a professional stamp and that you may prepare them yourself or hire a professional.
The rule sits in the 2021 Seattle Residential Code, section R105.6.1. Construction documents are to be prepared by or under the supervision of a Washington-licensed architect or structural engineer, who seals each sheet. Exceptions apply when the building official authorizes them: detached one- and two-family dwellings; new wood light-frame buildings and their additions or alterations where the value is under $75,000; and nonstructural alterations under $75,000 (excluding electrical and mechanical systems, fixtures, equipment, interior finish and millwork). SDCI’s Tip 303A says it requires a stamp on townhouse plans, generally not on detached one- and two-family dwellings “except for complex structures,” and that whether yours needs one is subject to SDCI’s approval. Section R105.6.1.1 lets the building official require the owner to name a registered design professional in responsible charge, who coordinates documents prepared by others.
Eastside cities. Each publishes its own wording, so the cities are kept separate here.
| City and document | What it says about who prepares the plans | Version |
|---|---|---|
| Bellevue, architectural plan page | When structural changes are made, the building plans examiner “may require” plans stamped by a licensed Washington architect or engineer | Undated page, read 14 November 2026 |
| Bellevue, structural or lateral calculations page | Single-family elements beyond the residential code’s limits are designed under accepted engineering practice with calculations; examples include retaining walls over 4 feet measured from the bottom of the footing, basement walls, decks, beams and headers, trusses and shear walls | Undated page |
| Kirkland, single-family permit checklist | Architectural and structural drawings, and any structural calculations, must be stamped and signed if a Washington-licensed design professional prepared them; a topographic or boundary survey must be stamped by the licensed surveyor | PDF created September 2024, no date printed |
| Redmond, residential application packet | Structural calculations “if required”; not required if straight out of the IBC or IRC; stamped and signed by a Washington State design professional when they are | Published 09/2026 |
| Sammamish, residential addition checklist | Lists structural calculations among its required items | Version 2022.10, older than the others |
None of these pages says a house must have an architect. Bellevue’s language is the most direct: the examiner may ask when the work is structural.
Free feasibility check
Planning a custom home or a remodel of $750,000 or more?
Send me the address and a few lines about what you want. The first feasibility check is free and usually takes about a day.
Where an engineer’s stamp comes in
Seattle prints specific lines for when an engineer’s stamp comes in. SDCI’s Tip 316, updated October 29, 2026, covers the quick “subject to field inspection” permit. For interior alterations to a single-family or duplex home, new beams and headers in loadbearing-wall openings need no engineer’s stamp up to these spans:
| What the beam supports | Span without an engineer’s stamp |
|---|---|
| No more than one story above, plus roof loads | 14 feet |
| No more than two stories above, plus roof loads | 8 feet |
| Garage door header, one story above, plus roof loads | 16 feet |
Beams that exceed these spans, or support three stories above, still qualify if a civil or structural engineer stamps the structural plans. Removing a shear wall or adding a window or door in an exterior wall means showing the structure can still resist wind and earthquake loads, and SDCI may ask for stamped plans. The 2021 code also says steel moment frames and extensive or complex concrete structures must be designed by a licensed structural engineer (Interpretation R105.6). My page on the structural engineer for a remodel covers the engineer’s work in more detail.
Who may stamp what is a separate legal question. The Attorney General’s 2022 opinion (AGO 2022 No. 3) says Washington law provides no bright line between design documents an architect must complete and those an engineer must complete, that the answer is fact-specific, and that it is primarily up to local building officials to decide which documents are acceptable. The 2022 opinion follows a 2021 opinion that said a non-architect may not stamp architectural drawings, and says the 2021 opinion did not preclude an engineer from stamping design documents within an engineer’s scope. For the comparison of the two professions, see architect vs engineer.
When you can do without an architect
Several cases need no architect.
- Minor work with no permit. The Seattle Residential Code (R105.2) exempts minor repairs or alterations valued at $6,000 or less in any six month period, provided they do not remove, reduce, alter or relocate any loadbearing support. It also lists installing kitchen cabinets or surface finishes over existing wall and ceiling systems, painting and insulating existing buildings, provided the building envelope does not change. The code adds that exemption from a permit does not authorize work that breaks the code.
- Simple permits. SDCI’s subject-to-field-inspection permit is for simple projects that do not need extensive plan review: interior alterations within the span lines above, ground-level one-story additions and detached accessory structures up to 750 square feet, decks up to 14 feet above grade that follow the prescriptive code, and window and siding replacement. SDCI screens your application to decide whether it qualifies.
- Owner or contractor drawings. Under RCW 18.08.410(5), any person may design a residential building of up to four dwelling units. SDCI says you may prepare house drawings yourself.
“No architect” does not mean “no specialist.” Seattle requires a topographic survey when you propose work on a site with a steep slope, potential slide or known slide area, and a geotechnical report on sites with a steep slope, potential or known slide, liquefaction, landfill or peat settlement, with a few exceptions (Tip 101). Kirkland asks for a geotechnical report in soft compressible soils or landslide or seismic hazard areas. Those come from a surveyor or geotechnical engineer, whoever draws the house.
What drawings the permit asks for
Whoever draws the set, the kinds of sheets are similar, but each city names its own:
| City and source | Sheets and documents the page names |
|---|---|
| Seattle, Tip 303A and R105.6.2 | Site plan, foundation plan, floor plans with labeled use of all rooms, exterior elevations, roof and floor framing plans including existing framing affected by additions, building cross sections, architectural and structural notes and details. SDCI says to include no options or alternates, because it approves specific proposals |
| Bellevue, architectural plan page | Floor plan, building elevations, cross sections and details, door, window and finish schedules, and energy code compliance information; elevations show total height from average existing or finished grade |
| Kirkland, checklist | Construction plan set at a minimum scale of 1/8 inch = 1 foot, site plan, survey where the city’s survey policy requires one, architectural drawings and structural drawings |
| Redmond, application packet | Cover sheet, foundation plan, floor plan, roof plan, code summary, framing plans and details, structural sheets and elevation sheets, plus a site plan |

The drawings in the table are the part where design and engineering meet. A framing plan that shows existing framing, as SDCI asks, depends on knowing what is in the house now; see existing conditions drawings before a remodel. Seattle projects that add hard surface may also meet stormwater requirements; see the Seattle stormwater guide.
Who can draw the plans, a contractor included
For an exempt project, the statute’s word is “any person,” and 18.08.410(3) separately covers a registered contractor’s own construction work and shop drawings. So a contractor, designer or owner may prepare the permit drawings for a house, if the permit office accepts them. The Department of Licensing adds limits:
- There is no specific exemption for design-build. Design-build follows the same exemptions as any other project, and only licensed architects and registered architectural business entities may offer or advertise architectural services.
- When a Washington registered design professional seals plans, changes, addenda and change orders must be approved by that professional or another in the same profession. An owner or contractor cannot alter sealed documents.
For the question of who to hire first, see architect vs contractor and addition contractor vs architect; for what a design contract should cover, architecture contract: what to look for.
Four projects, checked against the printed lines
These use SDCI’s Tip 316 and DOL’s FAQ lines. They show how each line works. SDCI makes the call on your permit.
| Project | The line and the arithmetic | Result |
|---|---|---|
| Seattle: a 12 foot opening in a bearing wall under one story and roof | 14 feet allowed without a stamp; 14 minus 12 = 2 feet inside the line | No engineer’s stamp needed on span, if SDCI treats it as a qualifying interior alteration |
| Seattle: the same 12 foot opening under two stories and roof | 8 feet allowed; 12 minus 8 = 4 feet over the line | Engineer-stamped structural plans; it can still go through the quick permit with the stamp |
| Seattle: a 600 square foot ground-level addition with a 200 square foot patio | Addition limit is 750, and 600 is under it by 150. But more than 750 square feet of new and replaced hard surface does not qualify, and 600 + 200 = 800, which is 50 over | Regular permit with plan review, assuming the addition’s roof and the patio both count as new hard surface; Tip 303A (December 2021) gives “building roof areas and all paving” as examples of hard surface |
| Seattle: a second story on a one-story house | Tip 316 lists “second story and two-story additions to single-family residences” among projects that do not qualify | Regular building permit; SDCI notes the existing house may need structural upgrades to carry the new floor |
The 800 square foot case shows how 50 square feet moves a project from a quick permit into review, so the new roof and paving are worth totaling before anyone sketches. For a second story, who stamps the structural drawings is a question for the building official under R105.6.1 and Tip 303A, and worth raising early.
The word architect and the license
RCW 18.08.310 makes it unlawful to practice or offer to practice architecture, or to use the word “architect” or language implying it, unless registered or authorized in Washington. A residential designer may legally prepare drawings for an exempt project, but cannot use the title architect unless registered or authorized under the chapter. Registration under RCW 18.08.350 goes to applicants certified as having passed the required examination who also hold one of two qualifications: an accredited architectural degree plus a board-approved structured training program, or a high school diploma plus at least eight years of practical architectural experience that includes structured training. The Department of Licensing’s lookup shows whether a license has been issued, whether it is active and when it expires. See how to verify an architect’s license.
What can change
The 2021 Seattle Residential Code is the edition in the SDCI chapter used for this page. A proposed rule filed May 5, 2026 (WSR 26-10-071) would adopt the 2024 International Residential Code in Washington with an implementation date of May 3, 2027; it is a proposal, and a final order was not read. The State Building Code Council’s schedule dated 14 August 2026 lists 18 November 2026 for filing the final rule, so the status may change soon after this page was read. Tips are updated on their own schedule: Tip 303A carries a December 2021 date and Tip 316 was updated October 29, 2026, so check the date on any tip you rely on.
Where I would start
- List the structural moves: a wall coming out, a wider opening, a second floor, a new foundation or a retaining wall over 4 feet measured from the bottom of the footing.
- In Seattle, check Tip 316 to see whether the work could qualify for the quick permit; elsewhere, open the city’s checklist for your permit type.
- Check the lot for a steep slope, slide area or soft soils, which bring a survey and a geotechnical report whoever designs.
- Ask the permit office in writing whether it will accept unstamped plans for your scope. SDCI says that is subject to its approval.
- If you hire anyone to design, check the Department of Licensing lookup first.
If you want to talk it through, the first basic feasibility check is free.
Before you decide
Talk through whether your project needs an architect
Send me the address and a few lines about the work. The first basic feasibility check is free and usually takes about a day; the in-depth analysis is $1,500 and takes 2 to 3 weeks. I have been an architect since 1996, an AIA member since 1992 and an NCARB member since 1996.
Questions
Does Washington require an architect for a home addition?
RCW 18.08.410(5) says the architect chapter does not prevent any person from doing design work, including construction documents and administering the contract, for the erection, enlargement, repair or alteration of a structure, regardless of size, if it is a residential building of up to and including four dwelling units or a structure auxiliary to one, such as a garage. A house addition falls inside that wording. Your permit office can still ask for structural calculations or stamped drawings, so ask it what your addition needs.
Does Seattle require an architect’s stamp on house drawings?
Rarely, according to SDCI. Its house additions page says house drawings rarely require a professional stamp, and Tip 303A says SDCI generally does not require one for detached one- and two-family dwellings and accessory structures, except for complex structures. Whether yours needs one is subject to SDCI’s approval (SRC R105.6.1). SDCI does require an architect’s or structural engineer’s stamp on townhouse plans.
Do I need an architect or an engineer to remove a bearing wall in Seattle?
SDCI’s Tip 316 says a new header in a loadbearing-wall opening needs no engineer’s stamp up to 14 feet when it supports no more than one story above plus roof, or 8 feet when it supports no more than two stories above plus roof, for work that qualifies for the quick permit. Past those spans, a civil or structural engineer stamps the structural plans. Removing a shear wall can also bring a request for stamped plans.
Can a contractor draw the plans for my building permit?
For a residential building of up to four dwelling units, RCW 18.08.410(5) lets any person do the design work, so a contractor may prepare the drawings if the permit office accepts them. The Department of Licensing says only licensed architects and registered firms may offer or advertise architectural services, and sealed drawings cannot be changed by an owner or contractor. A building official can still require documents from a registered design professional.
Do I need an architect for a second story addition in Seattle?
A single-family house falls inside the RCW 18.08.410(5) exemption. SDCI’s Tip 316 says second story additions to single-family residences do not qualify for the quick subject-to-field-inspection permit, so you apply for a regular building permit with plan review. SDCI’s house additions page adds that your existing house may need structural upgrades to support the new floor, and who stamps that work is for the building official to decide.
Do I need an architect for an ADU or backyard cottage?
RCW 18.08.410(5) covers residential buildings of up to four dwelling units and structures auxiliary to them, so a house-scale ADU can fall inside the exemption. SDCI’s Tip 101 says attached and detached accessory dwelling units always require plan review and do not qualify for the quick permit. Ask SDCI whether it wants stamped structural drawings for your design.
Do Bellevue, Kirkland and Redmond require an architect?
None of the pages used for this page says so for a house. Bellevue says its plans examiner may require plans stamped by a licensed Washington architect or engineer when structural changes are made. Kirkland says plans must be stamped if a licensed design professional prepared them. Redmond says structural calculations are required only if needed and must be stamped by a Washington design professional. Each city’s current checklist controls.
What is the difference between an architect and a designer in Washington?
Under RCW 18.08.310 only a person registered or authorized in Washington may use the title architect, and the Department of Licensing says only licensed architects and registered architectural business entities can offer or advertise architectural services. Registration requires passing the required examination plus an accredited degree and structured training, or a high school diploma and at least eight years of experience that includes structured training (RCW 18.08.350). A designer may prepare drawings for an exempt project but cannot use the title. The Department of Licensing lookup shows whether a license is active.
When can a small remodel skip a permit in Seattle?
Seattle’s code exempts minor repairs or alterations valued at $6,000 or less in any six month period that do not remove or move any loadbearing support, and lists installing kitchen cabinets over existing wall finishes where the building envelope does not change (SRC R105.2). Larger or structural work needs a permit, and SDCI decides whether it qualifies for the quick permit or needs plan review. Confirm with SDCI before you start.