Short answer: on Lake Washington and Lake Sammamish, a whole house waterfront renovation runs $300 to $550 a square foot as a planning range, and an addition runs $350 to $650. On a 3,500 square foot lake house that is 3,500 x 300 = $1,050,000 to 3,500 x 550 = $1,925,000, construction only. A new custom home is $400 to $900 a square foot. The water moves the rest: on $1,000,000 of work in Kirkland, my arithmetic from the city’s own 2026 schedules puts total city fees at about $21,000 to $24,300, of which roughly $5,500 to $8,800 exists only because the lot is inside shoreline jurisdiction. I am David Meade. My first basic feasibility check is free and usually takes about a day, and I quote a fixed fee for design and permit, never a percentage of construction. Piper Cole Architects designs the house and administers construction, and does not build.
Key takeaways
- Planning ranges: whole house renovation $300 to $550 a square foot, additions $350 to $650, new custom home $400 to $900, a 2,500 square foot custom home $1.2M to $2.5M all in, demolition $20,000 to $50,000.
- Per square foot is a sanity check, not a budget. On the water the same square foot can cost twice as much depending on access, bank condition and how much of the old house you keep.
- Shoreline jurisdiction is the land within 200 feet of the ordinary high water mark (RCW 90.58.030(2)(d)). That is what adds the fees, studies and review time.
- Published Eastside fees are minimums, not ceilings. Mercer Island’s 2026 schedule sets 6 staff hours as the minimum for a shoreline exemption, $1,092, then bills $182 an hour beyond it, non-refundable.
- A freshwater dock loses its state exemption above $20,000 of fair market value for a like-for-like replacement, or $10,000 for anything else, and the five-year total counts (RCW 90.58.030(3)(e)(vii)).
The number, by the depth of the work
These are the planning ranges I use on the two lakes: a bracket to test a plan against, not a quote. The right-hand column is my arithmetic on a 3,500 square foot house.
| What you are doing | Planning range | On a 3,500 sq ft house |
|---|---|---|
| Whole house renovation | $300 to $550 a square foot | 3,500 x 300 = $1,050,000 to 3,500 x 550 = $1,925,000 |
| Addition | $350 to $650 a square foot | A 600 sq ft addition: 600 x 350 = $210,000 to 600 x 650 = $390,000 |
| New custom home | $400 to $900 a square foot | 3,500 x 400 = $1,400,000 to 3,500 x 900 = $3,150,000 |
| 2,500 sq ft custom home, all in | $1.2M to $2.5M | Soft costs included, land not |
| Demolition of the existing house | Typically $20,000 to $50,000 | A teardown line, not a remodel line |
| Piper Cole Architects: design and permit | A fixed fee, set by project budget and location | About $10,000 to $200,000 depending on scope, quoted before you commit |
Two things about that last row. It is a fixed fee, so it does not move when the construction number moves, and you have it in writing before you spend anything on drawings. Percentage priced firms set the design fee as a share of construction cost, so their fee rises with every change order. Mine does not.
Why per square foot is the wrong number to plan from
Per square foot is the wrong number to plan from on its own. It does one job well: telling you quickly whether a project is in the right order of magnitude. Used as a budget it starts lying to you, and on a waterfront lot it lies by more than it does anywhere else.
Here is the arithmetic. Two Lake Washington houses, both 3,500 square feet, both getting a whole house renovation. House A has a wide driveway, flat ground to stage materials on, a sound foundation and a kitchen that stays put. House B sits at the end of a shared lane, its only level ground is inside the shoreline setback, the bank needs a geotechnical report, and the primary suite moves to the water side. At $300 a square foot House A is $1,050,000. At $550 House B is $1,925,000. An $875,000 spread on identical square footage.
So I use the range to decide whether to keep talking, then replace it with a number built from the actual lot: survey, bank, access, what the code lets you keep, and what the city charges you to ask. That is what the free first check is for.

What the shoreline actually adds to the price
Shoreline jurisdiction covers the water and the land extending landward 200 feet in all directions from the ordinary high water mark (RCW 90.58.030(2)(d)). Almost every house on the two lakes sits inside it, and that is where the extra money goes. Five places:
- A survey that locates the water line, not just the lot lines. The ordinary high water mark is a field-determined line, found by examining the bed and banks for where the action of water has marked the soil differently from the upland (RCW 90.58.030(2)(c)). A standard boundary survey does not give you that line, and every setback measures from it. Getting it wrong moves the whole house.
- A geotechnical report on the bank. Lake banks slope, and the slope is usually mapped as a critical area. That is a separate consultant and a separate city review fee, and it can change the structure before the architecture settles.
- Extra city reviews, each with its own fee. A dry lot buys a building permit and a plan review. A waterfront lot buys those plus a shoreline decision plus a critical areas decision. The next section prices it out.
- Construction access. Waterfront lots are often long and narrow with the house between the street and the water, leaving nowhere to stage material. That is crane time, smaller loads, hand-carrying, sometimes barge delivery.
- Waterward work carries its own engineering. For residential piers and docks, Washington requires grating in the deck: at least 30 percent of the deck surface on north and south oriented piers wider than four feet, at least 50 percent on other orientations, and the underside at least one and one-half feet above the ordinary high water line unless local rules prohibit it (WAC 220-660-140). Grated decking costs more than plain decking.
As of November 2026 these figures are current to the sources I link. Fee schedules change annually, so confirm with the city.
Free feasibility check
Planning a custom home or a remodel of $750,000 or more?
Send me the address and a few lines about what you want. The first feasibility check is free and usually takes about a day.
City fees on a waterfront remodel, with the arithmetic
Most homeowners have never seen this part priced. I read Kirkland’s 2026 schedules on 25 November 2026 and worked a $1,000,000 remodel through them. The building permit fee follows KMC Table 3, plan review is 65 percent of it, and a 3.5 percent technology fee sits on top (Kirkland Building Services Fees, effective 1 January 2026).
| Line item | How Kirkland sets it | On $1,000,000 of work |
|---|---|---|
| Building permit fee | $1,620 for the first $100,000, plus $8.22 per added $1,000 | 1,620 + (900 x 8.22) = $9,018 |
| Plan review fee | 65 percent of the permit fee | 9,018 x 0.65 = $5,861.70 |
| Energy code compliance | $101 plus $0.01 a square foot, conditioned space | 101 + (3,500 x 0.01) = $136 |
| State Building Code Council surcharge | $6.50, first residential unit | $6.50 |
| Technology fee | 3.5 percent of plan review and permit fees | (9,018 + 5,861.70) x 0.035 = $520.79 |
| Dry land subtotal | The inland bill | $15,543 |
| Shoreline substantial development exemption | Planning Official decision | $3,575 |
| Critical area determination | Land use schedule | $1,704 |
| Critical area Planning Official decision | Where it applies | $3,183 |
| MyBuildingPermit.com surcharge | 3.5 percent on land use fees | $185 to $296 |
| Waterfront total | Dry land plus the shoreline lines | About $21,000 to $24,300 |
The land use figures come from Kirkland’s 2026 Land Use Permit Fee Schedule. The lower total assumes the exemption and the critical area determination; the higher one adds the Planning Official decision on critical areas. Which you buy depends on the lot. Either way the shoreline lines are $5,279 to $8,462, so $5,464 to $8,758 with the surcharge. That is what the water costs at the permit counter. Impact and public works fees sit outside it.
Mercer Island prices the same work differently, and the structure matters more than the amount. Its 2026 schedule, effective 1 August 2026, sets an hourly staff rate of $182 and a minimum number of hours per application type (Mercer Island 2026 Fee Schedule):
| Mercer Island application | Minimum hours | Minimum fee |
|---|---|---|
| Shoreline exemption | 6 | $1,092 |
| Shoreline substantial development permit | 60 | $10,920 |
| Shoreline variance | 80 | $14,560 |
| Shoreline conditional use permit | 80 | $14,560 |
| Critical area review, Type 1 | 8 | $1,456 |
| Critical area review, Type 2 | 20 | $3,640 |
| Pre-application meeting, Type 2 | 12 | $2,184 |
Read the words around those numbers; they matter more than the numbers. The schedule says the listed fee is a minimum, that extra staff time is billed at the hourly rate in effect when it is incurred, and that the minimum is non-refundable. So a shoreline exemption there is $1,092 if the file is clean and more if it is not, and the money is gone whether or not you get the answer you wanted. That is the best argument I know for settling the hard questions on paper first. Bellevue publishes 2026 fees in its fee ordinance rather than on the page (Bellevue permit fees), so ask its Permit Center for your lot.
The dock and bulkhead dollar lines that catch people out
The dock is where a waterfront budget most often breaks, and it breaks on a dollar threshold rather than on construction cost. State law exempts a private, noncommercial dock for pleasure craft from the shoreline substantial development permit only up to a fair market value: in fresh water, $20,000 for a dock that replaces an existing dock of equal or lesser square footage in a city whose master program is updated to the 2003 guidelines, and $10,000 for every other freshwater dock (RCW 90.58.030(3)(e)(vii)). Construction within five years of the previous work counts toward the same line.
What that does to a budget: say the dock needs $14,000 of work and is not a like-for-like replacement. It is over the $10,000 line, so it is substantial development and needs the permit. On Mercer Island that permit starts at $10,920 and 60 staff hours. The $14,000 job is now a $25,000 job, and it takes months. Phasing does not escape it, because of the five-year rule.
The general threshold is separate and lower: development is substantial when its cost or fair market value exceeds a line the Office of Financial Management resets every five years. That line is $8,504, effective 1 July 2022 (WSR 22-11-036), so by the five-year cycle the next adjustment falls on 1 July 2027. Any waterfront remodel is far above it, which is why the owner’s own house exemption matters: state law excludes construction on shorelands by the owner of a single family residence for their own use, not more than 35 feet above average grade level (RCW 90.58.030(3)(e)(vi)). That removes a permit, not a setback.
One cost people budget for and do not need: a state application fee for hydraulic project approval. The fee section, RCW 77.55.321, shows as expired on 30 June 2017 as of November 2026. The approval is still required for work in the water, but the cost is in the drawings and biology it takes to get it. Confirm with the Department of Fish and Wildlife.
When keeping the house is the cheaper answer
On a dry lot the remodel-or-rebuild question is mostly about the condition of the structure. On the water it is about position. Many houses on the two lakes were built closer to the water than today’s setbacks allow, that position is worth real money, and you only keep it by keeping the house.
So the arithmetic runs the other way from what people expect. A new custom home at $400 to $900 a square foot is $1,400,000 to $3,150,000 on 3,500 square feet, against $1,050,000 to $1,925,000 for the renovation. Add demolition at $20,000 to $50,000. Then add the part that is in neither range: a new house has to meet the current setback, which on many lake lots means giving up the closest thirty or forty feet to the water, permanently.
Each city sets its own limit on how far you can go before the old footprint is lost, and the tests differ: some count altered wall length, some removed framing, some use a cost test. My guide to those rules is at remodeling a waterfront home on Lake Washington. For a budget, the limit is a design constraint with a price tag.
What I charge for design and permit
I quote a fixed fee for design and permit, set by the project budget and the location, typically about $10,000 to $200,000 depending on scope. Design to permit submission usually runs 2 to 4 months. The fee is fixed before you commit, so it does not climb with the construction number. Percentage priced firms price the same work as a share of construction cost, which is a different arrangement.
- First basic feasibility check: free, usually about a day. Send the address and what you are considering. I reply personally.
- In depth analysis: $1,500, 2 to 3 weeks. This answers where the house can go and what the code lets you keep.
- Design and permit: fixed fee, about $10,000 to $200,000 depending on scope. Quoted in writing once the scope is clear.
- Construction. I administer the construction contract. Piper Cole Architects does not build.
I have been an architect since 1996, an AIA member since 1992 and an NCARB member since 1996. Washington law does not require an architect for a house: RCW 18.08.410(5) says the chapter does not prevent anyone from doing design work, preparing construction contract documents and administering the construction contract for a residential building of up to four dwelling units, regardless of size. Hiring me is your call.
Setting the number before you are committed
The order that keeps a waterfront budget honest is the reverse of the one most people use. Most pick a scope, get a builder’s number, then find out what the shoreline allows. That sequence pays for drawings twice.
- Start with the water line. Get the ordinary high water mark located by survey. Every setback and fee decision follows from it.
- Price the asking, not just the building. Put $21,000 to $24,300 of city cost in the budget before you fall for a plan.
- Decide keep or rebuild early. It is the largest number in the project, and on the water it turns on position rather than condition.
- Get the design fee fixed in writing. That lets you compare proposals on scope rather than on a percentage you cannot forecast.
- Then get builder numbers. Only bids priced against the same drawings are worth comparing: see comparing contractor bids.
Selected work
Waterfront and lakefront projects from the practice.
Before you set the budget
Ask for the free first feasibility check
Call me or send a message on WhatsApp with the address and the number you have in mind. The first check is free and usually takes about a day. The in depth analysis is $1,500 and takes 2 to 3 weeks.
Questions
How much does a waterfront home remodel cost on Lake Washington?
As a planning range, a whole house waterfront renovation runs $300 to $550 a square foot of construction cost, so a 3,500 square foot lake house is $1,050,000 to $1,925,000. An addition runs $350 to $650 a square foot. On top of construction, budget city fees: on $1,000,000 of work in Kirkland my arithmetic from the city’s 2026 schedules puts total city fees at about $21,000 to $24,300, of which roughly $5,500 to $8,800 exists only because the lot is inside shoreline jurisdiction. These are planning ranges to test a plan against, not a quote on your house.
Why does a waterfront remodel cost more than the same remodel inland?
Five reasons, and only one of them is the building. You need a survey that locates the ordinary high water mark, not just the lot lines, because every setback measures from it. A lake bank usually needs a geotechnical report and a critical areas review. The city charges extra shoreline and critical areas decisions, worth $5,279 to $8,462 in Kirkland by my arithmetic from its 2026 schedules. Access is often poor, which means crane time and smaller deliveries. And anything out over the water is built to state standards, such as the grating Washington requires in residential pier decks under WAC 220-660-140.
What are the city permit fees for a waterfront remodel on the Eastside?
In Kirkland, on $1,000,000 of work, the 2026 schedules give a building permit fee of $9,018, plan review at 65 percent of that, which is $5,861.70, a 3.5 percent technology fee of $520.79, a shoreline substantial development exemption at $3,575 and a critical area determination at $1,704, with a critical area Planning Official decision at $3,183 where it applies. On Mercer Island the 2026 schedule charges minimum staff hours at $182 an hour: $1,092 for a shoreline exemption, $10,920 for a shoreline substantial development permit, $14,560 for a shoreline variance. Those are minimums and the overage is billed hourly. Fee schedules change at least annually, so as of November 2026, confirm with the city.
Is per square foot a reliable way to budget a waterfront remodel?
No. Per square foot is the wrong number to plan from on its own; it is only useful for checking whether a project is in the right order of magnitude. Two identical 3,500 square foot lake houses can land at $1,050,000 and $1,925,000 on the same scope, a spread of $875,000, depending on construction access, bank condition and how much of the existing house the shoreline code lets you keep. Use the range to decide whether to keep talking, then replace it with a number built from the actual lot.
Do I need a shoreline permit to remodel my own waterfront house?
Usually you need a written shoreline exemption from the city rather than a shoreline substantial development permit. State law excludes construction on shorelands by the owner, lessee or contract purchaser of a single family residence for their own use or their family’s use, where the residence is not more than 35 feet above average grade level (RCW 90.58.030(3)(e)(vi)). The exemption removes the permit, not the setbacks, height limits, vegetation rules or nonconforming limits. Confirm with your city, because the exemption is a written decision you have to apply for and pay for.
How much does a dock add to a waterfront remodel budget?
More than the dock work, if it crosses a dollar line. State law exempts a private noncommercial dock for pleasure craft only up to a fair market value: in fresh water, $20,000 for a like-for-like replacement of equal or lesser square footage in a city whose master program is updated to the 2003 guidelines, and $10,000 for every other freshwater dock (RCW 90.58.030(3)(e)(vii)). Above that line you need a shoreline substantial development permit, which on Mercer Island starts at $10,920 and 60 staff hours under its 2026 fee schedule. Construction within five years counts toward the same threshold, so phasing does not avoid it.
Is it cheaper to remodel a waterfront house or tear it down and rebuild?
On the water, usually to remodel, and the reason is position rather than condition. A new custom home is $400 to $900 a square foot against $300 to $550 for a renovation, plus $20,000 to $50,000 of demolition, so on a 3,500 square foot house the rebuild is $1,400,000 to $3,150,000 against $1,050,000 to $1,925,000. The bigger cost is that a new house has to meet today’s setback from the ordinary high water mark, while an existing house built closer to the water may keep its position if you keep the house. Each city sets its own limit on how much you can change before that position is lost.
How do you charge, and is the fee a percentage of construction?
No. I quote a fixed fee for design and permit, set by the project budget and the location, typically about $10,000 to $200,000 depending on scope, and design to permit submission usually runs 2 to 4 months. The fee is fixed before you commit, so it does not move when the construction number moves. Percentage priced firms price the same work as a share of construction cost, which is a different arrangement. The first basic feasibility check with me is free and usually takes about a day; an in depth analysis is $1,500 and takes 2 to 3 weeks.
What should I have in hand before I ask a builder for a number?
A survey that locates the ordinary high water mark, a geotechnical report if the bank is mapped as a critical area, a written answer on whether the existing house keeps its position under your city’s nonconforming rules, the city fee figures for your lot, and a set of drawings every bidder prices against. Without the last one, the bids are not comparable. The free first feasibility check is where I sort out which of these your lot actually needs, usually in about a day.