1. Home
  2. Blog
  3. Custom Homes and New Builds

Topic

Custom Homes and New Builds

Designing a new house on the Eastside: site selection, waterfront and sloped lots, budgets and build timelines.

Guides

Gray midcentury house at dusk with lit entry, stone steps, boulders and new landscaping
Custom Homes and New Builds

Hiring an architect to tear down and rebuild in Seattle and on the Eastside

Tearing down and rebuilding? The architect’s first job is what your lot allows. Free feasibility check, about a day. Fixed fee for design and permit.

David Meade · October 8, 2026
Contemporary two story house with stone column, metal panel siding, deck and lawn
Custom Homes and New Builds

Getting a house demolished for a rebuild in Seattle and on the Eastside: permits, asbestos and the order of work

What it takes to demolish a house for a rebuild in Seattle and the Eastside: permit, asbestos notice, utilities, trees and the order that avoids an idle lot.

David Meade · October 7, 2026
View 8 — Piper Cole Architects, Seattle Eastside WA
Custom Homes and New Builds

Home elevators in Washington: how to design one into a custom home

Planning a home elevator in a new custom home in Washington: who permits it (L&I or Seattle SDCI), ASME A17.1 rules, shaft, pit, drive types, cost drivers.

David Meade · September 27, 2026
Shoreline exemptions in Washington: building or remodeling a waterfront house without a substantial development permit
Custom Homes and New Builds

Shoreline exemptions in Washington: building or remodeling a waterfront house without a substantial development permit

Building or remodeling a house on Lake Washington or the Sound? You likely need a written shoreline exemption, not a full permit. How it works in 2026.

David Meade · September 27, 2026
David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
Costs, Fees and Budgets

How do I finance a custom home build in Seattle or on the Eastside?

How construction-to-permanent loans, draws and land equity work, and what a lender needs from the design side before it will fund a custom home in Washington.

David Meade · September 26, 2026
Should I remodel my house or tear it down and rebuild?
Custom Homes and New Builds

Should I remodel my house or tear it down and rebuild?

Remodel at $300 to $550 a sq ft, add on at $350 to $650, or rebuild at $400 to $900? The code threshold that often decides it, and a scorecard for your house.

David Meade · September 26, 2026
What Seattle’s tree ordinance means for building a house
Custom Homes and New Builds

What Seattle’s tree ordinance means for building a house

Seattle's tree code for new homes, teardowns and additions: tiers, Tier 2 removal, protection areas, permit plans and in-lieu fees, as of 2026.

David Meade · September 26, 2026
David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
Custom Homes and New Builds

What the 2021 Washington State Energy Code means for your new home

The 2021 Washington State Energy Code for a new Seattle or Eastside home: credits by size, heat pump vs gas, walls, windows, air testing and the EV circuit.

David Meade · September 26, 2026
David Meade, AIA NCARB, Principal Architect at Piper Cole Architects in Kirkland, WA
Custom Homes and New Builds

Lakefront home design on Lake Washington

Shoreline rules, buildable area and real cost per square foot for a Lake Washington home. Custom homes run $400 to $900 per sq ft.

David Meade · September 17, 2026
Aerial view of a contemporary custom home with mixed wood-and-metal cladding and landscaped grounds in the Seattle area, by Piper Cole Architects.
Custom Homes and New Builds

Custom Home Architect in Seattle, WA

Custom home architect in Seattle, WA. From modern infill to view lots, Piper Cole Architects delivers full-service design. Architect since 1996, 20 to 30 projects a year.

David Meade · July 3, 2026
Waterfront home interior with floor-to-ceiling windows and glass doors opening to a lake view and dock near Kirkland, designed by Piper Cole Architects.
Custom Homes and New Builds

Waterfront Architect in Kirkland, WA

Waterfront architect in Kirkland, WA. Piper Cole Architects designs lakefront homes and additions within shoreline regulations.

David Meade · July 2, 2026
Rustic-modern custom home with warm wood siding, a stone entry, and a covered carport on a Pacific Northwest lot, by Piper Cole Architects.
Custom Homes and New Builds

Custom Home Architect in Kirkland, WA

Custom home architect in Kirkland, WA. Piper Cole Architects designs Northwest Contemporary and lakefront homes with local permit expertise.

David Meade · July 1, 2026
Modern farmhouse custom home with black board-and-batten siding and white trim in the Bellevue area, designed by Piper Cole Architects.
Custom Homes and New Builds

Custom Home Architect in Bellevue, WA

Modern custom home architect in Bellevue, WA. Piper Cole Architects designs contemporary Eastside residences with full permit service. free feasibility check.

David Meade · June 27, 2026
Contemporary luxury home with floor-to-ceiling glass and a backyard pool on the Seattle Eastside, designed by Piper Cole Architects.
Custom Homes and New Builds

Luxury Home Architect on Seattle’s Eastside

Estate residences in Medina, Clyde Hill, Hunts Point and Mercer Island. Waterfront and difficult sites. Principal led. Call David Meade direct.

David Meade · June 24, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Custom Homes and New Builds

Wood vs Steel vs ICF: Choosing a Structural System

Wood vs steel vs ICF: how to choose a structural system for your home, with pros, cons, and cost. Architect guidance from Piper Cole Architects.

David Meade · June 22, 2026
Open great room with a stone fireplace and wood-plank ceiling flowing into the kitchen and dining, a flexible multigenerational living space by Piper Cole Architects near Seattle.
Custom Homes and New Builds

Multigenerational Home Design in Seattle: Designing for Extended Family

Designing a Seattle home for multiple generations. In-law suites, dual primary suites, ADUs, and privacy strategies for extended family living.

David Meade · June 1, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Custom Homes and New Builds

Mass Timber Architecture in Seattle: CLT, Glulam, and the Case for Wood

Mass timber architecture in Seattle: CLT, glulam, structural performance, sustainability, and cost premium for homeowners and developers.

David Meade · May 30, 2026
Modern single-story home with a low-slope roof, warm-wood cladding, and clean lines in the Seattle area, designed by Piper Cole Architects.
Custom Homes and New Builds

Modern Architecture Design Styles in Seattle: From Northwest Contemporary to Minimalist

Modern residential architecture styles in Seattle: Northwest Contemporary, Mid-Century Modern, Scandinavian, and Minimalist: how to choose what fits your.

David Meade · May 30, 2026
Newly built modern white board-and-batten two-story custom home framed by evergreen trees in the Seattle area, designed by Piper Cole Architects.
Custom Homes and New Builds

What It Costs to Build a House in Seattle

Seattle build costs by tier and finish for 2026, the full budget beyond construction, and an estimator for your own house size. Call David on 425 753 6452.

David Meade · May 27, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Custom Homes and New Builds

Small Lot House Design in Seattle: Maximizing Every Square Foot

Building on a small lot in Seattle? Architects share strategies for maximizing space, using Seattle zoning rules, and creating homes that live large.

David Meade · May 27, 2026
Modern two-story custom home with warm-wood and dark siding and a paver driveway on the Seattle Eastside, designed by Piper Cole Architects.
Custom Homes and New Builds

How Long Does It Take to Build a Custom Home in Seattle? A Complete Timeline

How long to build a custom home in Seattle? Phase-by-phase timeline from design through move-in. Realistic 2026 estimates by Piper Cole Architects.

David Meade · May 25, 2026
Residential architecture project by Piper Cole Architects, Seattle Eastside WA
Custom Homes and New Builds

Form vs. Function in Architecture: How Great Design Balances Both

Form vs. function in architecture: how the best buildings achieve both simultaneously.

David Meade · May 25, 2026
Large waterfront home with expansive glass, a lakeside pool, and kayaks on the shore near Seattle, designed by Piper Cole Architects.
Custom Homes and New Builds

Waterfront Home Design in Seattle: Architecture for Lakes, Bays and Shorelines

Designing on Lake Washington and Lake Sammamish shoreline lots: buildable area, view corridors, setbacks and grade. Call the architect direct on 425 753 6452.

David Meade · May 25, 2026
Modern home entry foyer with a wood pivot door, stone accent wall, and glass surround, designed by Piper Cole Architects in the Seattle area.
Custom Homes and New Builds

What Is a Foyer? Entry Design Ideas for Seattle Homes

What is a foyer and how should it be designed for Seattle homes? Entry design ideas, sizing, and storage solutions from Piper Cole Architects.

David Meade · May 25, 2026
Aerial view of a modern Seattle-area home with flat rooflines, warm-wood accents, and landscaped grounds, designed by Piper Cole Architects.
Custom Homes and New Builds

Modern Home Architecture Trends in Seattle for 2026

Modern home architecture trends in Seattle for 2026: the materials, forms, and features shaping new homes, from Piper Cole Architects.

David Meade · May 22, 2026
Cedar and glass house at dusk, designed by Piper Cole Architects

Next step

Have a project in mind?

Call David Meade directly. The first feasibility check is free and usually takes about a day.

Free feasibility check

Send the address and what you have in mind. David replies within one business day with what the site and the code are likely to allow.

    What are you planning?
    Your details

    No obligation. Your details go to David only. See the privacy policy.

    Chat with David on WhatsApp