The 5 Phases of Architectural Design Explained for Homeowners
What are the phases of architectural design? A clear explanation of schematic design, design development, construction documents, bidding, and construction administration.
What are the phases of architectural design? A clear explanation of schematic design, design development, construction documents, bidding, and construction administration.
LEED Certification for Seattle Homes and Buildings: Is It Worth It? LEED (Leadership in Energy and Environmental Design) is the
House Extension in Seattle: Design Options and What It Costs A house extension — any addition that expands the footprint
Whole House Renovation in Seattle: Do You Need an Architect? A whole-house renovation — gutting and rebuilding the interior of
Small Lot House Design in Seattle: Maximizing Every Square Foot As Seattle infill development has increased, small lots — typically
Home Renovation Cost in Seattle 2026: By Room and Scope Home renovation costs in Seattle in 2026 range from $50,000
Sloped Lot House Design in Seattle: What Architects Know Seattle is built on hills. A sloped lot that intimidates most
Do You Need an Architect for a Bathroom Renovation in Seattle? For a straightforward bathroom update — new tile, new
Cost to Build a House in Seattle 2026: Complete Breakdown Building a custom home in Seattle in 2026 costs between
Second story addition costs in Seattle range from $300K to $750K+ depending on structural complexity, finish level, and permit scope. 2026 cost guide by David Meade AIA NCARB, Piper Cole Architects.
Start Here
Free initial consultation, no obligation. Licensed architect serving Kirkland and the greater Seattle metro area since 2000.